Zoning Approval | 3/31/2017 | 3/31/2017 | 3/31/2017 | | DONE |
Andrea Tuning
|
|
|
Landscaping is complete and bond has been returned.
|
BLD-Final | 3/13/2017 | 3/13/2017 | 3/13/2017 | P | PASS |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
DOC - Permit Finaled | 3/13/2017 | 3/13/2017 | 3/13/2017 | P | PASS |
Dave Hannah
|
|
|
|
Zoning Approval Temp | 3/13/2017 | 3/13/2017 | 3/13/2017 | | PASS |
Sarah Schafer
|
|
|
Bond is posted for the temporary
|
BLD-Final | 3/10/2017 | 3/10/2017 | 3/11/2017 | P | FAIL |
Dave Hannah
|
|
|
c/n on site
|
BLD-Framing/Rough-in | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | PASS |
Dave Hannah
|
|
|
Michael// please call ahead Phone #: ###-####
|
BLD-Energy code compliance | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | PASS |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | FAIL |
Mike Jordan
|
|
|
micheal Phone #: ###-####. Provide mech. connection at rough sawn lumber beam to column connection at front porch. Provide engineering showing location of drilled holes on double LVL in garage ok. Ok to insualte. Correction notice posted.
|
Plan Modification Accepted | | | 11/18/2016 | | DONE |
|
|
|
new manual j report
|
Routing - MECHANICAL | 11/18/2016 | | 11/18/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | PASS |
Mike Jordan
|
|
|
Shear // Micheal Phone #: ###-####
|
BLD-Foundation | 9/30/2016 | 10/3/2016 | 10/3/2016 | P | PASS |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 9/28/2016 | 9/29/2016 | 9/29/2016 | P | PASS |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 9/27/2016 | 9/28/2016 | 9/29/2016 | P | CANC |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 9/26/2016 | 9/27/2016 | 9/27/2016 | P | CANC |
Dave Hannah
|
|
|
Dane Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/20/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/20/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/16/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 8/11/2016 | 8/11/2016 | 9/12/2016 | | DONE |
Brian McGowan
|
|
|
Due 8-23 ePlan Failed- need section/detail and misc. items
Failed 8-31 - did not provide all information previously requested.
|
Routing - PLAN CHECK | 9/12/2016 | | 9/12/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/12/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/12/2016 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Routing - PLAN CHECK | 8/31/2016 | | 8/31/2016 | | FAIL |
Brian McGowan
|
|
|
Plans must specify it meets 2012 IRC NOT the 2009 IRC. A deck detail is needed. (Specify membrane proposed being used and slope of deck)
|
1st review completed | | | 8/22/2016 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/22/2016 | | 8/22/2016 | | FAIL |
Brian McGowan
|
|
|
Failed- need section/detail and misc. items
|
Routing - PLANNING | 8/10/2016 | | 8/16/2016 | | PASS |
Josh Wilson
|
|
|
ok per DR and CVA approvals
|
Route to Impact Fee Review | 8/10/2016 | 8/13/2016 | 8/11/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Plan assigned to (LEG) Tisha | 8/10/2016 | | 8/11/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 8/10/2016 | | 8/11/2016 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/10/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/10/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/10/2016 | | DONE |
|
|
|
|
Routing - Addressing | 8/10/2016 | | 8/10/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/10/2016 | | 8/10/2016 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 8/9/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 9 2016 8:06AM
|