BLD-Final | 10/4/2016 | 10/5/2016 | 10/5/2016 | A | PASS |
Jim Sly
|
|
|
Phone #: 3609073985 >> Inspection requested via mobile web by Alex
|
DOC - Permit Finaled | 10/5/2016 | 10/5/2016 | 10/5/2016 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 9/12/2016 | 9/13/2016 | 9/13/2016 | A | PASS |
Jim Sly
|
|
|
Footing inspection can be done at anytime Tuesday morning. Alex will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Issue PAID IN FULL permit | | | 8/16/2016 | | DONE |
|
|
|
|
Plan assigned to (BJM) | 8/9/2016 | 8/9/2016 | 8/15/2016 | | DONE |
Brian McGowan
|
|
|
Post specified does not match engineering
|
Routing - PLAN CHECK | 8/15/2016 | | 8/15/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/15/2016 | | DONE |
|
|
|
all requirments met
|
Routing - PLAN CHECK | 8/9/2016 | | 8/12/2016 | | FAIL |
Brian McGowan
|
|
|
Post specified does not match engineering
|
1st review completed | | | 8/12/2016 | | FAIL |
Brian McGowan
|
|
|
Post specified does not match engineering
|
Application received | | | 8/9/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 9 2016 2:42PM
|
Plans ACCEPTED BY PLAN TECH | | | 8/9/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/9/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/9/2016 | | DONE |
|
|
|
|
Routing - PLANNING | 8/9/2016 | | 8/9/2016 | | PASS |
Jeff Lowe
|
|
|
|