BLD-Final | 1/4/2017 | 1/5/2017 | 1/5/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Robert ODell
|
DOC - Permit Finaled | 1/5/2017 | 1/5/2017 | 1/5/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 11/6/2016 | 11/7/2016 | 11/7/2016 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Robert ODell
|
BLD-Energy code compliance | 11/2/2016 | 11/3/2016 | 11/3/2016 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Robert ODell ok to cover all but down stairs bathroom
|
BLD-Framing/Rough-in | 10/31/2016 | 11/1/2016 | 11/1/2016 | P | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Robert ODell ok to insulate but needs to fix floor joist that plumbers have over cut jiost in basement
|
Plan assigned to (BJM) | 8/12/2016 | 8/12/2016 | 9/9/2016 | | DONE |
Brian McGowan
|
|
|
Failed - need additional information on beams, window sizes
|
Routing - PLAN CHECK | 8/12/2016 | | 9/9/2016 | | FAIL |
Brian McGowan
|
|
|
Bathrooms do not meet minimum clearance requirements.
|
Routing - MECHANICAL | 9/2/2016 | | 9/9/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLAN CHECK | 9/9/2016 | | 9/9/2016 | | PASS |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/2016 | | DONE |
Brian McGowan
|
|
|
ESC - NO
Energy - YES
|
Permit Ready to Issue | | | 9/9/2016 | | DONE |
|
|
|
all requirements met
|
Issue PAID IN FULL permit | | | 9/9/2016 | | DONE |
|
|
|
|
(F) Reprint permit | | | 9/9/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/9/2016 | | DONE |
|
|
|
|
1st review completed | | | 8/19/2016 | | FAIL |
Brian McGowan
|
|
|
Need information on beam, window sizes and a manual J. A manual J was requested due to Mr. Odell stating he was relocating the furnace and installing a new one.
|
Plans ACCEPTED BY PLAN TECH | | | 8/12/2016 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/12/2016 | | PASS |
Christina Prado
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/12/2016 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 8/9/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 9 2016 9:34PM
|