First Notice | | 2/19/2018 | 3/13/2018 | | DONE |
|
|
|
Mailed 3-14-18
|
BLD-Ceiling Grid Inspection | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Mike Jordan
|
|
|
Adam Phone #: ###-####. OK for perm occ.
|
BLD-Final | 2/9/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Mike Jordan
|
|
|
Ceiling grid insp on 2/9/18 was supposed to be final bldg insp. see inspectors notes in ceiling grid inspection for OK for perm occupancy
|
Permanent Occupancy | | | 2/9/2018 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/9/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/9/2018 | | DONE |
|
|
|
Plan Mod
|
Plan assigned to (JG) | 1/25/2018 | 1/25/2018 | 2/2/2018 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Plan Mod World Connections
|
Routing - PLAN CHECK | 1/30/2018 | | 2/2/2018 | | PASS |
Javier Guzman
|
|
|
|
Permit Ready to Issue | | | 2/2/2018 | | DONE |
|
|
|
DO NOT REISSUE plan mod, fees due
|
Routing - PLAN CHECK | 1/25/2018 | | 1/27/2018 | | FAIL |
Javier Guzman
|
|
|
|
Route to Impact Fee Review | 1/25/2018 | 1/28/2018 | 1/25/2018 | | PASS |
Eric Bilimoria
|
|
|
Review requested for Commercial Permit
|
Plan Modification Accepted | | | 1/25/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod to update floor configuration and add office walls
|
BLD-Final | 1/18/2018 | 1/22/2018 | 1/22/2018 | P | PEND |
Mike Jordan
|
|
|
Adam Phone #: ###-####-no plan on site but will try and get them from the architect. Will need to architect to submit plan modifiaction to show the additional two offices that have been constructed.
|
Telephone call | | | 1/22/2018 | | DONE |
|
|
|
GC called wanted to know what needed done to get the C of O-told him he needed the approved drawings before his final building inspections and since he doesn't have the sign off card he can email or call us and we'll print the sign off card fill it out and he can come pick up the card or we can email it to him
|
FIRE-Final Inspection | 11/13/2017 | 11/13/2017 | 11/13/2017 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
Adam Phone #: ###-####
|
FIRE-Conference | 6/7/2017 | 6/12/2017 | 6/12/2017 | A | DONE |
Jim Page
|
|
|
Fire conference complete, fire alarm modifications still need to be made to the existing system, fire sprinkler modifications have been completed, fire extinguishers are in place with current inspection tags, exit signs with discharge lighting will be installed before final inspection, exterior exits that are designated as emergency exits will also need to have exit discharge illumination installed per note number 12 on fire plan review comments.
|
FIRE-Final Inspection | 3/6/2017 | 3/6/2017 | 3/6/2017 | P | FAIL |
Troy Cobbley
|
|
|
No plans or small documents on site. I did a courtesy walk through with Adam. I noted the need for fire sprinkler and fire alarm modifications in several locations. It appears the emergency generator has been removed so backup power for emergency lights is an issue. Door hardware does not meet ADA on the new doors.
Leanne Phone #: ###-####
|
Issue PAID IN FULL permit | | | 2/21/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/21/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/21/2017 | | DONE |
|
|
|
|
Telephone call | | | 2/17/2017 | | DONE |
|
|
|
Spoke with Jeff to get Tony's phone number to inform him that this permit it 10 days past its expiration date. Stated that I saw Tony brought in the GC Form, Revised Value and letter from parcel owner.
|
Telephone call | | | 2/6/2017 | | DONE |
|
|
|
Left a message for Jeff informing him that this permit is going to expire at 5pm tonight and if he would like he may send in a request for a 180 day extension. Left him the permit number, my email and my phone number
|
Telephone call | | | 1/30/2017 | | DONE |
|
|
|
Left a message for Jeff informing him that this permit is going to expire in 8 days and that if he would like he may send in a request for an extension. Stated the permit number, my email and my phone number.
|
Expiration Notice | 1/17/2017 | 2/7/2017 | 1/17/2017 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (JG) | 8/11/2016 | 8/11/2016 | 9/21/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 8/17 L1 World Connections ePlan
|
Routing - PLAN CHECK | 9/21/2016 | | 9/21/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/21/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/21/2016 | | DONE |
|
|
|
***all requirments met 2-15-17 /CEV
NEED GC form and certificate of value
|
1st review completed | | | 8/16/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 8/11/2016 | | 8/16/2016 | | FAIL |
Javier Guzman
|
|
|
ePlan
|
Routing - FIRE | 8/15/2016 | 8/15/2016 | 8/15/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Intake Approval | | | 8/11/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - Addressing | 8/11/2016 | | 8/11/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/11/2016 | | 8/11/2016 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 8/10/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 10 2016 1:50PM
|