Permit Information
Permit NumberBLD16-02961
StatusFinaled
Name KC GARDNER RIVERWOODS LC
Site Address 101 S CAPITOL BLVD Unit: 1801
Project NameDA Davidson - Suite 1801
Customer NumberBLD16-03156
ePlanReviewYes
Description
**(DA DAVIDSON & COMPANY - US Bank Building – 18th Floor - SUITE #1801)** Permit is to remodel an existing 9,126 sq. ft. tenant space by dividing it into two separate tenant spaces, the existing tenant is downsizing and new space is to be 5,099 sq. ft. and the remaining 4,027 sq. ft. is to be an unoccupied tenant space created under BLD16-03156. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select millwork, construction of select interior non-bearing walls to create a conference room and (2) offices, relocate existing door/door frames, electrical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  12/20/2016 DONE
First Notice 11/24/201612/14/2016 DONE
Mailed 12-15
Permanent Occupancy  11/14/2016 DONE
FIRE-Final Inspection11/9/201611/10/201611/10/2016APASS
DetailsKatie Marron
Fire life safety pass.
BLD-Final11/9/201611/10/201611/10/2016PPASS
DetailsDave Hannah
Larren Phone #: ###-####
BLD-Framing/Rough-in10/11/201610/12/201610/12/2016APASS
DetailsJim Storey
Laren Phone #: ###-####
BLD-Framing/Rough-in9/13/20169/15/20169/15/2016ACANC
DetailsDave Hannah
Laren Phone #: ###-####
BLD-Framing/Rough-in8/31/20169/1/20169/1/2016APASS
DetailsMike Jordan
Laren Phone #: ###-####. phase 1 interior steel stud framed wall for offices.
Issue PAID IN FULL permit  8/31/2016 DONE
Print Occupancy Form  8/31/2016 DONE
Plan assigned to (JG)8/19/20168/19/20168/29/2016 PASS
DetailsJavier Guzman
9/01 L2 DA Davidson ePlan
Routing - PLAN CHECK8/19/2016 8/29/2016 PASS
DetailsJavier Guzman
1st review completed  8/29/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  8/29/2016 DONE
Permit Ready to Issue  8/29/2016 DONE
***MET***Needs; GC Form & Revised Cert of Value
Routing - Addressing8/19/2016 8/22/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS8/19/2016 8/19/2016 PASS
DetailsRachael Beierle
Intake Approval  8/19/2016  
DetailsJavier Guzman
Application received  8/11/2016 DONE
Application submitted via PDS Online on Aug 11 2016 12:06PM