BLD-Final | 4/3/2017 | 4/4/2017 | 4/4/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 2/6/2017 | 2/7/2017 | 2/7/2017 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 2/7/2017 | 2/7/2017 | 2/7/2017 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 2/1/2017 | 2/3/2017 | 2/3/2017 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall. Complete lateral bracing on C03 truss. Roll block floor joist at interior bearing wall (1st.floor) between front door and barrell vault.. Ok to insulate. Correction notice issued.
|
BLD-Wall Bracing | 1/17/2017 | 1/17/2017 | 1/17/2017 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD-Footing | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Jim Sly
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 10/28/2016 | 10/28/2016 | 10/28/2016 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Footing | 10/27/2016 | 10/27/2016 | 10/27/2016 | P | CANC |
Phil Shearer
|
|
|
|
Issue PAID IN FULL permit | | | 8/25/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 8/23/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 8/11/2016 | 8/11/2016 | 8/23/2016 | | DONE |
Brian McGowan
|
|
|
Due 8-24
|
Routing - PLAN CHECK | 8/17/2016 | | 8/23/2016 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 8/23/2016 | | DONE |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/23/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/23/2016 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 8/23/2016 | | DONE |
|
|
|
|
Telephone call | | | 8/23/2016 | | DONE |
|
|
|
called Tahoe- left message that permit is ready and fees due
|
Routing - MECHANICAL | 8/15/2016 | | 8/17/2016 | | PASS |
Troy James
|
|
|
|
Routing - PUBLIC WORKS | 8/11/2016 | | 8/15/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLANNING | 8/15/2016 | | 8/15/2016 | | PASS |
Celine Acord
|
|
|
|
Routing - Addressing | 8/11/2016 | | 8/12/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/11/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/11/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/11/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 8/11/2016 | | 8/11/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Application received | | 8/11/2016 | | | |
|
|
|
|
Routing PW Flood Plain | 8/12/2016 | | | | PASS |
Jim Wyllie
|
|
|
Property not in Floodplain as per Letter of Map Revsion.
Jim Wyllie / ###-####
|