Meeting | | | 3/25/2019 | | DONE |
|
|
|
Went over final numbers in detail with Steve Ellis with Shuckle LLC. Final value submitted on 8/14/18 included many items not included with definition of Project Value. New final cert of value submitted for $1,151,762.19. Original value at time of permit issuance was $1,200,000.00. No final value fees for BLD permit due.
|
Print Statement | | | 3/14/2019 | | DONE |
|
|
|
3rd late notice sent
|
Print Statement | | | 2/6/2019 | | DONE |
|
|
|
sent 2nd late notice
|
Print Statement | | | 11/23/2018 | | DONE |
|
|
|
sent 1st late notice
|
Print Statement | | | 10/3/2018 | | DONE |
|
|
|
|
Print Statement | | | 8/16/2018 | | DONE |
|
|
|
|
First Notice | | 8/5/2018 | 8/8/2018 | | DONE |
|
|
|
mailed 8-10-18
|
Permanent Occupancy | | | 7/26/2018 | | DONE |
|
|
|
|
BLD-Final | 7/18/2018 | 7/18/2018 | 7/19/2018 | P | PASS |
Tony Young
|
|
|
need pass final for perm occ (not sure if you need to go out or not?) Steve Ellis Phone #: ###-####
|
BLD-Aging Inspection | 7/2/2018 | 7/2/2018 | 7/5/2018 | | PASS |
Tony Young
|
|
|
|
PubWorks Occupancy Approval | 6/26/2018 | 6/26/2018 | 6/26/2018 | | DONE |
Tiffany Lowery
|
|
|
|
Temporary Occupancy | 5/31/2018 | 8/29/2018 | 5/31/2018 | | DONE |
Candy A. Nichols
|
|
|
5-31-18 JB ok'd temp c of o extension from 6/3/18
|
Telephone call | | | 5/31/2018 | | DONE |
|
|
|
called Steve to let know that the temp c of o will expire 6/3/18-he will email Jason Blais for an extension
|
BLD-Aging Inspection | 4/30/2018 | 4/30/2018 | 5/1/2018 | | PASS |
Tony Young
|
|
|
|
BLD-Final | 4/30/2018 | 4/30/2018 | 4/30/2018 | P | PART |
Tony Young
|
|
|
Steve Phone #: ###-####,, ok pending others
|
Zoning Approval | 4/27/2018 | 4/27/2018 | 4/27/2018 | | DONE |
Katelyn Menuge
|
|
|
2-28-18
|
Temporary Occupancy | 3/5/2018 | 6/3/2018 | 3/5/2018 | | DONE |
Brittany Hill
|
|
|
|
BLD-Final | 2/28/2018 | 3/1/2018 | 3/1/2018 | P | PART |
Tony Young
|
|
|
still need GRD permit finaled as well as ELE Steve Phone #: ###-####,, temp. occupancy ok
|
FIRE-Final Inspection | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
Steve Phone #: ###-####
|
FIRE-Final Inspection | 2/27/2018 | 2/27/2018 | 2/27/2018 | P | FAIL |
Troy Cobbley
|
|
|
Need the project related fire sprinkler underground and overhead permits finaled. Need the project related fire alarm permit finaled. A stand alone smoke alarm is being required to be added in the Infant room as per the Assistant Fire Marshal. A separate permit is needed for the second business located in this building. Deadbolts need to be removed. Approved hardware is needed on the Restroom Barn Doors. Fire extinguishers need to be mounted. Exit signs and emergency lights need to be tested. Small documents need to be on site. An address needs to be installed as discussed.
Steve-please call 10 minutes prior to meet-wants to go threw inspection with him Phone #: ###-####
|
FIRE-Conference | 2/23/2018 | 2/23/2018 | 2/23/2018 | P | DONE |
Jim Page
|
|
|
Fire conference complete. Provide panic hardware on southwest exterior gate. Provide knox box by main entry. Verify door hardware is code compliant on level 2 balcony door. provide fire extinguishers throughout building. Provide correct size for address numbering.
|
Print Occupancy Form | | | 2/21/2018 | | DONE |
|
|
|
|
BLD-Energy code compliance | 12/21/2017 | 12/21/2017 | 12/21/2017 | P | PASS |
Tony Young
|
|
|
Steve Phone #: ###-####
|
BLD-Energy code compliance | 12/15/2017 | 12/15/2017 | 12/18/2017 | P | PART |
Dave Hannah
|
|
|
Steve Phone #: ###-#### front office area and back two class rooms ok to cover
|
BLD-Framing/Rough-in | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | PASS |
Dave Hannah
|
|
|
final framing and energy seal // Steve Ellis Phone #: ###-#### ok to insulate
|
CHANGE STATUS TO (ISS) | | | 12/11/2017 | | DONE |
|
|
|
plan mod paid
|
BLD-Framing/Rough-in | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | CANC |
Dave Hannah
|
|
|
.
|
BLD-Framing/Rough-in | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PEND |
Dave Hannah
|
|
|
needs air seal package installed needs fire blocking int shear finised do not insulate framing is ok
|
Plan assigned to (CDM) | 10/25/2017 | 10/25/2017 | 12/7/2017 | | PASS |
Carl D Madsen
|
|
|
Plan Mod River Academy
|
Routing - PLAN CHECK | 12/6/2017 | | 12/7/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/7/2017 | | DONE |
|
|
|
PLAN MOD DO NOT REISSUE
|
BLD-Framing/Rough-in | 11/20/2017 | 11/20/2017 | 11/22/2017 | P | PART |
Dave Hannah
|
|
|
call 1 hr prior // framing/conference // Victor Phone #: ###-#### ok to cover shear wall at stairs
|
Routing - PLAN CHECK | 10/26/2017 | | 11/5/2017 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - FIRE | 10/30/2017 | 10/30/2017 | 11/1/2017 | | PASS |
Scott Arellano
|
|
|
Revised to add Type I hood
|
Routing - MECHANICAL | 10/30/2017 | | 10/30/2017 | | PASS |
Troy James
|
|
|
|
Routing PW Environmental | 10/26/2017 | | 10/27/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - PUBLIC WORKS | 10/26/2017 | | 10/26/2017 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 10/26/2017 | | 10/26/2017 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Plan Modification Accepted | | | 10/25/2017 | | DONE |
|
|
|
Plan mod accepted thru e plan-new lamont (?) to kitchen-sheets M1.00, M2.00, M3.00 & P3.00-assigned to Carl M
|
BLD-Wall Bracing | 9/20/2017 | 9/21/2017 | 9/21/2017 | P | PASS |
Tony Young
|
|
|
Shear // Victor Phone #: ###-####
|
BLD-Wall Bracing | 9/19/2017 | 9/20/2017 | 9/20/2017 | P | PART |
Tony Young
|
|
|
Shear // Victor Phone #: ###-####,, work in progress,, ok
|
BLD-Wall Bracing | 9/19/2017 | 9/19/2017 | 9/19/2017 | P | PART |
Tony Young
|
|
|
Victor Phone #: ###-####,, work in progress, ok so far
|
BLD-Wall Bracing | 9/18/2017 | 9/19/2017 | 9/19/2017 | A | PART |
Tony Young
|
|
|
Victor Phone #: ###-####,, work in progress
|
BLD-Wall Bracing | 9/15/2017 | 9/18/2017 | 9/18/2017 | A | PART |
Tony Young
|
|
|
Victor Phone #: ###-####,, on site conf,, work in progress east side,, ok so far
|
BLD-Wall cover | 9/15/2017 | 9/15/2017 | 9/15/2017 | P | NR |
Tony Young
|
|
|
Victor Phone #: ###-####,, walk around part,, needs too much,, re-nail and re-call
|
BLD-Framing/Rough-in | 9/15/2017 | 9/15/2017 | 9/15/2017 | P | NR |
Tony Young
|
|
|
Victor Phone #: ###-####
|
BLD-Wall Bracing | 9/6/2017 | 9/7/2017 | 9/7/2017 | A | CANC |
Jim Sly
|
|
|
left off piece of shear to see fire wall blocking // Victor Phone #: ###-####
|
BLD-Framing/Rough-in | 9/6/2017 | 9/7/2017 | 9/7/2017 | A | PART |
Jim Sly
|
|
|
left off piece of shear to see fire wall blocking // Victor Phone #: ###-#### Verified fireblocking in place........OK to cover 2nd story Mechanical area.......Both sides of walls.
|
Print Occupancy Form | | | 8/17/2017 | | DONE |
|
|
|
|
BLD-Aging Inspection | 7/13/2017 | 7/13/2017 | 7/14/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/12/2017 | 7/12/2017 | 7/12/2017 | | PEND |
Tony Young
|
|
|
|
Telephone call | | | 5/5/2017 | | DONE |
Scott Arellano
|
|
|
Spoke with General Contractor (John Andry w/ Wright Bros) and informed John that the underground fire sprnkler supply must be installed under an issued fire sprinkler permit holding a valid fire sprinkler contrctor license through the State of Idaho. John said he will contact a license fire sprinkler contractor to right away.
|
BLD-Foundation | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | PASS |
Tony Young
|
|
|
Mark-rebar-trash enclosure Phone #: ###-####,, also verified stem wall insulation,, and pier for south entry canopy
|
CHANGE STATUS TO (ISS) | | | 2/27/2017 | | DONE |
|
|
|
Plan mod
|
(F) Reprint permit | | | 2/27/2017 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 12/21/2016 | 12/21/2016 | 1/20/2017 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 12/23/2016 | | 1/20/2017 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/20/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/20/2017 | | DONE |
|
|
|
DO NOT RE- ISSUE This is a PLAN MOD
|
Routing PW Environmental | 12/27/2016 | | 1/19/2017 | | PASS |
Rick Christenson
|
|
|
|
Routing - PLUMBING | 12/27/2016 | | 12/27/2016 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - PUBLIC WORKS | 12/23/2016 | | 12/27/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Drainage | 12/27/2016 | | 12/27/2016 | | PASS |
Brian Murphy
|
|
|
|
Plan Modification Accepted | | | 12/21/2016 | | DONE |
Christina Prado
|
|
|
Plan Modification to add grease interceptor to building
|
BLD-Foundation | 12/19/2016 | 12/20/2016 | 12/20/2016 | A | PART |
Tony Young
|
|
|
Mark Phone #: ###-####,, special inspector on site.. ok,, pending final report
|
BLD-Footing | 12/13/2016 | 12/14/2016 | 12/14/2016 | A | PART |
Tony Young
|
|
|
Mark Phone #: ###-####,, ok pending special inspection
|
Issue PAID IN FULL permit | | | 12/13/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/13/2016 | | DONE |
|
|
|
|
Plan assigned to (CDM) | 9/1/2016 | 9/1/2016 | 12/12/2016 | | PASS |
Carl D Madsen
|
|
|
First review completed
|
Routing - PLAN CHECK | 11/9/2016 | | 12/12/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing - PLAN CHECK | 12/1/2016 | | 12/12/2016 | | PASS |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 12/1/2016 | | 12/12/2016 | | PASS |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/12/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/12/2016 | | DONE |
|
|
|
***ACHD in docc everythoing else has been met***Need ACHD, GC Form, Revised cert of Value. Per Andy ESC16-01122 will be used on this building permit too
|
Routing - Design Review | 12/1/2016 | | 12/1/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing Off Site - STRUCTURAL | 11/9/2016 | | 11/17/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - Design Review | 11/9/2016 | | 11/15/2016 | | PASS |
Josh Wilson
|
|
|
OK per DRH16-00490
|
Routing - PLAN CHECK | 10/21/2016 | | 11/5/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 10/21/2016 | | 11/5/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - Design Review | 10/21/2016 | | 10/26/2016 | | FAIL |
Josh Wilson
|
|
|
Design Review modification for revised elevations not received.
|
Routing PW Drainage | 10/24/2016 | | 10/25/2016 | | PASS |
Brian Murphy
|
|
|
|
Routing - FIRE | 10/21/2016 | 10/21/2016 | 10/24/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing PW Solid Waste | 10/24/2016 | | 10/24/2016 | | PASS |
Evan Carpenter
|
|
|
Solid waste enclosure is OK as planned.
|
Routing - PUBLIC WORKS | 10/21/2016 | | 10/24/2016 | | PASS |
Rachael Beierle
|
|
|
|
Route to Impact Fee Review | 10/5/2016 | 10/8/2016 | 10/10/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 10/5/2016 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 9/1/2016 | | 10/5/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing Off Site - STRUCTURAL | 9/1/2016 | | 10/5/2016 | | FAIL |
Carl D Madsen
|
|
|
|
Routing - MECHANICAL | 9/26/2016 | | 9/26/2016 | | PASS |
Troy James
|
|
|
|
Routing PW Drainage | 9/1/2016 | | 9/19/2016 | | FAIL |
Brian McGowan
|
|
|
need apdx j signed ect crossdrainage access agreement swale 3 to 1 ect
|
Routing PW Sewer Design | 9/1/2016 | | 9/14/2016 | | PASS |
Kyle S. Rosenmeyer
|
|
|
Connecting to 2 existing sewer stubs into the property.
|
Routing PW Solid Waste | 9/1/2016 | | 9/9/2016 | | FAIL |
Evan Carpenter
|
|
|
Need 50' of straight line approach for truck to be able to access dumpster. This enclosure only has approx. 30' before the parking lot edge on the adjacent parcel.
|
Routing - Erosion and Sediment | 9/1/2016 | | 9/7/2016 | | PASS |
Andy J. Long
|
|
|
ESC narrative and site map submitted and approved. Valid PD designated, RP to be designated upon contract reward.
|
Routing - MECHANICAL | 9/1/2016 | | 9/7/2016 | | FAIL |
Troy James
|
|
|
|
Routing - FIRE | 9/1/2016 | 9/1/2016 | 9/6/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - ELECTRICAL | 9/1/2016 | | 9/3/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 9/1/2016 | | 9/2/2016 | | PASS |
Daryl Spivey
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 9/1/2016 | | 9/2/2016 | | FAIL |
Josh Wilson
|
|
|
Submit a Modification to the approved Design Review for the revised elevations.
|
Routing - PLANNING Land Div | 9/1/2016 | | 9/1/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 9/1/2016 | | 9/1/2016 | | PASS |
Laura Hunter
|
|
|
Changed address to 7655 N Jennie Ln with 7563 N Jennie Ln being the new address for the future building pad
|
Routing - PUBLIC WORKS | 9/1/2016 | | 9/1/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Street Lights | 9/1/2016 | | 9/1/2016 | | PASS |
Tom Marshall
|
|
|
|
Intake Approval | | | 9/1/2016 | | PASS |
|
|
|
|
Intake Approval | | | 8/24/2016 | | FAIL |
|
|
|
Please provide the following items. 1st pre-screen 8-24-16 Carl Madsen ###-####
1. Form 310 special inspections is required to be signed by the owner.
2. Registered design professional form 304 to be signed by the owner.
3. Structural calculations.
4. Central district health stamp and application.
5. Site specific fire flow letter.
6. Permanent O&M agreement (contact Brian Murphy ###-####)
7. Remove stamps from plans indicating preliminary some of the sheets in the storm water report have a preliminary stamp on the sheets.
8. Provide an ESC narrative.
9. Provide a comcheck with the correct address not Emmett Idaho.
10. Indicate the site address on the lighting compliance forms.
11. Provide matching compliance reports either Ashrae or IECC all report are required to use the same standard.
12. Please provide the commissioning report.
|
Application received | | | 8/11/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 11 2016 7:39PM
|