Information based on query as of Tuesday, July 23, 2024.
Permit Information
Permit NumberBLD16-03010
StatusFinaled
Name RRC CONTRACTORS
Site Address 877 W MAIN ST
Project NameWells Fargo - 1st & 3rd floor
Customer Number 
ePlanReviewYes
Description
**(WELLS FARGO - WELLS FARGO CENTER BUILDING – 1ST & 3RD FLOOR REMODEL)** //Plan modification to update and reconfigure 1st floor offices and open office area locations and create a new storage closet with interior nonbearing walls, removal of select millwork for updated office location, select new millwork, relocation of new lights, electrical and mechanical modifications. 6-1-2017 JG// This building is fully fire sprinklered because it is a high rise. Permit is to remodel 5,200 sq. ft. at the 1st floor and 16,560 sq. ft. of the 3rd floor within an existing 11 story high-rise building. Approval is contingent upon adhering to the approved plans on file. Work to include: @ 1st floor removal of restroom partitions, millwork, select door hardware, light fixtures, select acoustic and gypsum ceiling, construction of new nonbearing walls to create (6) offices, (2) huddle rooms, open office areas, a waiting area, a break area and resource areas, remodel existing restrooms to make ADA accessible, millwork, select new acoustic and gypsum ceiling, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. @ 3rd floor removal of select interior nonbearing walls, select door/door frames, millwork, select stairway leading to 2nd floor, acoustic ceiling, light fixtures, construction of new nonbearing walls to create (10) offices, a conference room, a huddle rooms, a wellness room, (4) resource areas, a break room, a coffee area and open office areas, millwork, floor decking to cover removed stairway, relocate entry card reader, select new relite windows, select new acoustic and gypsum ceiling, new light fixtures, electrical work, plumbing work, mechanical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: special inspection required, See attached form #310 in small documents. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/3/201911/26/2019 DONE
This permit finaled on the web by derek cooper
Third Notice 9/25/201910/29/2019 DONE
mailed 11-1
Second Notice 8/23/20199/20/2019 DONE
mailed 9-23-19
First Notice7/26/20197/26/20198/13/2019 DONE
DetailsDave Hannah
mailed 8-13
BLD-Aging Inspection7/19/20197/19/20197/26/2019 PASS
DetailsDave Hannah
DOC - Permit Finaled7/26/20197/26/20197/26/2019APASS
DetailsDave Hannah
BLD-Aging Inspection3/1/20193/1/20193/7/2019 PASS
DetailsDave Hannah
BLD-Final10/17/201810/18/201810/18/2018PPASS
DetailsDave Hannah
Zack Phone #: ###-####
FIRE-Final Inspection10/17/201810/18/201810/18/2018APASS
DetailsJim Page
Final life fire safety inspection for area of work complete.

Zack Phone #: ###-####
BLD-Final8/25/20178/25/20178/25/2017PPEND
DetailsDave Hannah
Zach Phone #: ###-####3 ok for temp occ
FIRE-Final Inspection8/25/20178/25/20178/25/2017PPART
DetailsTroy Cobbley
A temp on life safety is being given until the access controled egress door is fully functional. All other items appear ok.
BLD-Conference8/24/20178/24/20178/25/2017PPEND
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Ceiling Grid Inspection8/4/20178/4/20178/4/2017PPASS
DetailsDave Hannah
for 1st floor - Zack Phone #: ###-####
BLD-Framing/Rough-in7/7/20177/7/20177/7/2017PPASS
DetailsDave Hannah
Zack Phone #: ###-#### 1st floor
CHANGE STATUS TO (ISS)  6/14/2017 DONE
DetailsChristina Prado
Plan mod fees paid, permit changed to ISS status
Plan assigned to (JG)5/31/20175/31/20176/12/2017 PASS
DetailsJavier Guzman
1st rev comp, Plan mod Wells Fargo - 1st & 3rd floor
Routing - PLAN CHECK6/7/2017 6/12/2017 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  6/12/2017 DONE
Permit Ready to Issue  6/12/2017 DONE
DO NOT REISSUE all requirements met, fees due
Route to Impact Fee Review5/31/20176/3/20176/5/2017 PASS
DetailsMarissa Taylor
Review requested for Commercial Permit
Routing - PLAN CHECK6/1/2017 6/2/2017 FAIL
DetailsJavier Guzman
Routing - MECHANICAL6/1/2017 6/1/2017 PASS
DetailsTroy James
1 hour review time
BLD-Ceiling Grid Inspection5/30/20175/30/20175/31/2017PPASS
DetailsDave Hannah
Zack Phone #: ###-####
Plan Modification Accepted  5/31/2017 DONE
DetailsChristina Prado
PLan Mod requested to update new interior partitions proposed, updates for electrical & mechanical
BLD-Ceiling Grid Inspection5/10/20175/10/20175/11/2017PPASS
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Framing/Rough-in5/4/20175/4/20175/7/2017PPASS
DetailsDave Hannah
Zack Phone #: ###-#### second phase ok
BLD-Conference4/10/20174/10/20174/11/2017PPART
DetailsDave Hannah
Zach Phone #: ###-#### ok to occ first three offices
BLD-Conference4/6/20174/7/20174/7/2017ANR
DetailsDave Hannah
Zack Phone #: ###-####
BLD-Ceiling Grid Inspection3/23/20173/23/20173/23/2017PPART
DetailsDave Hannah
Zack Phone #: ###-#### first phase ok
BLD-Framing/Rough-in3/14/20173/14/20173/14/2017PPART
DetailsDave Hannah
Zack-half of the 3rd floor remodel Phone #: ###-#### ok to cover first phase
BLD-Conference1/27/20171/27/20171/27/2017PPASS
DetailsDave Hannah
Zach Phone #: ###-####
BLD-Conference1/26/20171/26/20171/26/2017PDONE
DetailsJim Sly
Zach Phone #: ###-####
Met with Zach. Need Arch. or Eng. to clarify ......if ....and what rebar required for floor infill. Appr plans does not show sizing, spacing...etc.
Issue PAID IN FULL permit  11/29/2016 DONE
Print Occupancy Form  11/29/2016 DONE
Plan assigned to (JG)8/24/20168/24/201611/3/2016 PASS
DetailsJavier Guzman
1st review completed, 9/20 L3 Wells Fargo E plan
Routing - PLAN CHECK11/3/2016 11/3/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  11/3/2016 DONE
Permit Ready to Issue  11/3/2016 DONE
*** ALL requirements met*** Needs; GC Form & Rev Cert of Value
Routing - PLAN CHECK10/28/2016 10/28/2016 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL10/21/2016 10/26/2016 PASS
DetailsJavier Guzman
signed off in ePlan by KPFF engineer Jordan Terry
Routing - PLAN CHECK10/20/2016 10/21/2016 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL10/20/2016 10/21/2016 FAIL
DetailsJavier Guzman
failed in ePlan by KPFF engineer Jordan Terry
Routing - PLAN CHECK10/21/2016 10/21/2016 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL9/28/2016 10/7/2016 FAIL
DetailsJavier Guzman
failed in ePlan by KPFF engineer Jordan Terry
Routing - PLAN CHECK9/22/2016 10/3/2016 PASS
DetailsJavier Guzman
1st review completed  9/17/2016 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK8/24/2016 9/17/2016 FAIL
DetailsJavier Guzman
Routing - FIRE8/24/20168/24/20168/29/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - MECHANICAL8/24/2016 8/24/2016 PASS
DetailsTroy James
Routing - PUBLIC WORKS8/24/2016 8/24/2016 PASS
DetailsRachael Beierle
Routing - Addressing8/24/2016 8/24/2016 PASS
DetailsLaura Hunter
Intake Approval  8/24/2016 PASS
DetailsDavid Ferguson
This pre screen was approved without the strucutural sheet stamped, signed and a note not for construction. Javier tried to reach out to the architect prior to routing the drawings and we have not recieved the revised drawing. The delay in routing was in trying to get the drawings that should have been submitted prior to pre screen approval. Javier will fail this part of the project unless we recieve them during review. ajs
Intake Approval  8/16/2016 FAIL
DetailsDavid Ferguson
Need a completed #304 Registered Design Professional form and a #518 Minor TI Checklist.
Application received  8/15/2016 DONE
Application submitted via PDS Online on Aug 15 2016 5:41PM