BLD-Final | 7/20/2017 | 7/21/2017 | 7/21/2017 | A | PASS |
Brandon Shaw
|
|
|
Clint Phone #: ###-####
|
DOC - Permit Finaled | 7/21/2017 | 7/21/2017 | 7/21/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Energy code compliance | 5/18/2017 | 5/24/2017 | 5/23/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 5/18/2017 | 5/22/2017 | 5/22/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall Bracing | 5/2/2017 | 5/3/2017 | 5/3/2017 | A | PASS |
Brandon Shaw
|
|
|
early as poss // Luna Phone #: ###-####
|
BLD-Conference | 12/20/2016 | 12/21/2016 | 12/21/2016 | A | DONE |
Mike Jordan
|
|
|
Call prior to going Phone #: 8708888 >> Inspection requested via mobile web by Wes/10:00 am request.
|
BLD-Foundation | 12/20/2016 | 12/21/2016 | 12/21/2016 | A | PASS |
Mike Jordan
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Foundation | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | FAIL |
Jim Storey
|
|
|
As early as possible Phone #: 9656103 >> Inspection requested via mobile web by Alvaro to cold no heat protection.
|
BLD-Footing | 12/13/2016 | 12/14/2016 | 12/14/2016 | A | PASS |
Phil Shearer
|
|
|
advardo Phone #: ###-####
|
(F) Reprint permit | | | 12/7/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/7/2016 | | DONE |
|
|
|
Plan Mod
|
OVERRIDE | | | 11/22/2016 | | |
|
|
|
|
Permit Ready to Issue | | | 11/22/2016 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Plan assigned to (BJM) | 8/22/2016 | 8/22/2016 | 11/21/2016 | | DONE |
Brian McGowan
|
|
|
Due 8-30 - Failed - No upper floor wall bracing and tall wall calculations
|
Routing - PUBLIC WORKS | 11/21/2016 | | 11/21/2016 | | PASS |
Rachael Beierle
|
|
|
SIGNED OFF FROM ORIGINAL RATING 8/17/16
|
Routing - PLAN CHECK | 11/21/2016 | | 11/21/2016 | | PASS |
Brian McGowan
|
|
|
|
Routing - PLANNING | 11/21/2016 | | 11/21/2016 | | PASS |
Jeff Lowe
|
|
|
revsied to add garage
|
Case Summary (BLD) | | | 11/21/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2016 | | DONE |
Brian McGowan
|
|
|
|
Plan Modification Accepted | | | 11/16/2016 | | DONE |
|
|
|
plan mod received 2 sets of sheets 1-8 , 2 res and manuals, site plan-took to Brian McGowan
|
Plan Modification Accepted | | | 11/15/2016 | | DONE |
|
|
|
Acca report resubmittal - Approved
|
Routing - MECHANICAL | 11/15/2016 | | 11/15/2016 | | PASS |
Chad Schwendiman
|
|
|
Acca report resubmittal
|
Issue PAID IN FULL permit | | | 9/20/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/19/2016 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/19/2016 | | DONE |
|
|
|
|
Telephone call | | | 9/19/2016 | | DONE |
|
|
|
called Tahoe- left message that permit is ready and fees due
|
Permit Ready to Issue | | | 9/19/2016 | | DONE |
|
|
|
All Met
|
Routing - PLAN CHECK | 9/9/2016 | | 9/17/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/17/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/17/2016 | | DONE |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 9/9/2016 | | DONE |
|
|
|
received (2) sets of calculations and plan resubmittals
|
1st review completed | | | 8/26/2016 | | FAIL |
Brian McGowan
|
|
|
Need tall wall engineering and upper floor wall bracing
|
Routing - PLAN CHECK | 8/23/2016 | | 8/26/2016 | | FAIL |
Brian McGowan
|
|
|
Need tall wall engineering and upper floor wall bracing
|
Routing - MECHANICAL | 8/22/2016 | | 8/23/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/19/2016 | | 8/22/2016 | | PASS |
Jeff Lowe
|
|
|
|
Plan assigned to (LEG) Tisha | 8/17/2016 | | 8/22/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Addressing | 8/17/2016 | | 8/18/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Flood Plain | | | 8/18/2016 | | PASS |
Jim Wyllie
|
|
|
Property out of floodplain as per Letter of Map Revision.
Jim Wyllie / ###-####
|
Plans ACCEPTED BY PLAN TECH | | | 8/17/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/17/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/17/2016 | | DONE |
|
|
|
|
Application received | | 8/17/2016 | | | |
|
|
|
|