Third Notice | | 6/17/2017 | 7/12/2017 | | DONE |
|
|
|
Mailed 7-13-17
|
Second Notice | | 5/20/2017 | 6/12/2017 | | DONE |
|
|
|
Mailed 6-13-17
|
First Notice | | 4/28/2017 | 5/10/2017 | | DONE |
|
|
|
sent in mail 5-11-17
|
Permanent Occupancy | | | 4/18/2017 | | DONE |
|
|
|
|
BLD-Final | 4/6/2017 | 4/11/2017 | 4/11/2017 | P | PASS |
Jim Storey
|
|
|
Use west stair well, go out on walk way second set of double door on your right. Phone #: ###-#### Inspection requested via web by Michael Schreiber
|
FIRE-Final Inspection | 4/6/2017 | 4/11/2017 | 4/11/2017 | A | PASS |
Jim Page
|
|
|
No fire sprinklers, no monitored fire alarms, fire extinguishers are in place with current inspection tags. Exit lights in the south corridor will be changed to double sided exit lights as shown on city approved drawings (exit lights in place but only one sided at time of inspection, double side will be completed before final building inspection). Final life fire safey inspection passed/complete.
|
BLD-Ceiling Grid Inspection | 3/16/2017 | 3/20/2017 | 3/20/2017 | A | PASS |
Jim Storey
|
|
|
Ceiling Grid inspection, second floor east end of the outside walkway. Come in the west stair well Phone #: ###-#### Inspection requested via web by Michael Schreiber
|
BLD-Framing/Rough-in | 1/31/2017 | 2/2/2017 | 2/2/2017 | A | PASS |
Jim Storey
|
|
|
Second floor east end, Suite 205 entrance, Wall framing for cover. Use west stair well, last door on the righ on the balcony. Phone #: ###-#### Inspection requested via web by Michael Schreiber
|
FIRE-Final Inspection | 1/5/2017 | 1/6/2017 | 1/6/2017 | A | PART |
Troy Cobbley
|
|
|
Phase 1 life safety is complete/passed. However prior to a phase 2/final sign off the thumbturn dead bolt in the phase 1 area will need to be removed and the two remote annunciators for the duct smoke detectors will need to be repaired (shows no power) or approval from the mechanical engineer to remove the two duct detector/annunciators. Per the mechanical plans the cfm is well below the 2,000 limit.
|
BLD-Final | 1/4/2017 | 1/5/2017 | 1/5/2017 | P | PASS |
Jim Storey
|
|
|
FInal for Temp Occupancy, so owner can move in on Saturday, and we can start Phase II on Monday. Second Floor suite 203 Phone #: ###-#### Inspection requested via web by Michael Schreiberfirst phase ok
|
BLD-Ceiling Grid Inspection | 12/22/2016 | 12/22/2016 | 12/22/2016 | P | PASS |
Jim Sly
|
|
|
On second floor, Suite 203 Phone #: ###-#### Inspection requested via web by Michael Schreiber
|
BLD-Framing/Rough-in | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | PASS |
Jim Storey
|
|
|
On the second floor. Going to one side sheet rock. Phone #: ###-#### Inspection requested via web by Michael Schreiber first phase ok
|
Issue PAID IN FULL permit | | | 10/12/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/12/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/7/2016 | 9/7/2016 | 9/16/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 9/08 L2 Primary Health Family Practice ePlan
|
Routing - PLAN CHECK | 9/16/2016 | | 9/16/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/16/2016 | | DONE |
|
|
|
***all requirments met 10-12-16 /CEV
Needs; Revised cert of value & GC Form
|
Plan assigned to (JG) | 8/26/2016 | 8/26/2016 | 9/7/2016 | | PASS |
Javier Guzman
|
|
|
9/08 L2 Primary Health Family Practice ePlan
|
Routing - PLAN CHECK | 8/26/2016 | | 9/7/2016 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 9/7/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 8/26/2016 | 8/26/2016 | 8/30/2016 | | PASS |
Katie Marron
|
|
|
No comments required.
|
Routing - PLUMBING | 8/26/2016 | | 8/29/2016 | | PASS |
Bill VanDegrift
|
|
|
Per plan and ISPC.
|
Routing - Design Review | 8/26/2016 | | 8/29/2016 | | PASS |
Katelyn Menuge
|
|
|
Approved per CZC16-00217.
|
Routing - MECHANICAL | 8/26/2016 | | 8/26/2016 | | PASS |
Troy James
|
|
|
|
Routing - Addressing | 8/26/2016 | | 8/26/2016 | | PASS |
Laura Hunter
|
|
|
Suite 203
|
Routing - PUBLIC WORKS | 8/26/2016 | | 8/26/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 8/26/2016 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 8/19/2016 | | FAIL |
David Ferguson
|
|
|
Provide a Zoning Certificate for the proposed exterior work.
|
Application received | | | 8/18/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 18 2016 8:49AM
|