Permit Information
Permit NumberBLD16-03095
StatusFinaled
Name JORDAN WILCOMB CONSTRUCTION
Site Address 2505 S FEDERAL WAY
Project NameVanilla 2nd Floor
Customer Number 
ePlanReviewYes
Description
**(VANILLA – 2nd FLOOR)** //Plan modification to alter stair width, change the 1st floor lobby layout, added a door at 1st floor lobby, relocate the elevator, relocate the elevator roof penthouse and remove opening on the second floor to add approx. 108 sq. ft. to the second floor. 2-15-2018 JG// NO OCCUPANCY ALLOWED UNDER THIS PERMIT. TENANT SHALL APPLY FOR CERTIFICATE OF OCCUPANCY PRIOR TO OCCUPYING THE SPACE. Permit is to remodel an existing 14,153 sq. ft. building by adding 8,310 sq. ft. second floor. Approval is contingent upon adhering to the approved plans on file. Work to include: new 5’ wide concrete walkway from rear exterior exit landing to the existing sidewalk, new engineered upper second floor decking, construction of select interior nonbearing walls to create a lobby area, an elevator shaft and stairway walls, new interior elevator, new interior exit stairway, new exterior exit stairway, new exterior door opening, new elevator, new light fixtures, electrical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: Minimum number of required plumbing fixture and area of refuge to be addressed when future new tenant occupies the second floor, see attached document in Tidemark. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  12/31/2018 DONE
Third Notice 11/12/201812/13/2018 DONE
mailed 12-14
Letter of compliance/Occupancy  11/8/2018 DONE
Second Notice 10/21/201811/7/2018 DONE
mailed 11-12
First Notice10/1/201810/1/201810/11/2018 DONE
DetailsJim Storey
mailed 10-12-18
BLD-Final9/28/201810/1/201810/1/2018PPASS
DetailsJim Storey
Please call when you are nearby. I will be just around the corner.
Thanks Phone #: ###-#### Inspection requested via web by Mark Steen
DOC - Permit Finaled10/1/201810/1/201810/1/2018PPASS
DetailsJim Storey
FIRE-Final Inspection9/27/20189/28/20189/28/2018APASS
DetailsJim Page
Previously noted items have been completed, final life fire safety inspection complete.

Phone #: ###-#### Inspection requested via web by Mark Steen
FIRE-Final Inspection9/21/20189/24/20189/24/2018AFAIL
DetailsTroy Cobbley
Provide small documents, provide fire extin\guishers for mezzanine as discussed, provide electrical room signage, provide panic hardware for electrical room and provide final inspection for the project related fire alarm permit.
BLD-Wall cover5/29/20185/30/20185/30/2018APASS
DetailsJim Storey
Elevator shaftwall framing ; cover inspection. Phone #: ###-#### Inspection requested via web by Mark Steen
BLD-Concrete5/4/20185/7/20185/7/2018PPASS
DetailsJim Storey
100 yard deck pour 5amTuesday with MTI attending. Note: A separate steel framing inspection request is already set up for the same time as this inspection. (Saves two trips) Thanks Phone #: ###-#### Inspection requested via web by Mark Steen
BLD-Framing/Rough-in5/4/20185/7/20185/7/2018PPASS
DetailsJim Storey
MTI welding Insp due to complete partial approval noon Monday. A concrete inspection will be requested for the same time as this framing inspection occurs. Concrete for elevated deck delivers Tuesday at 5am with MTI attending. Thanks Phone #: ###-#### Inspection requested via web by Mark Steen
BLD-Concrete4/11/20184/11/20184/11/2018PPASS
DetailsJim Storey
Pour back SOG ; two small added footings. Also, exterior stair foundations. MTI will be inspecting steel and mud tomorrow. Thanks Phone #: ###-#### Inspection requested via web by Mark Steen si report pending
BLD-Footing4/5/20184/6/20184/6/2018PPART
DetailsJim Storey
MTI due on site Friday at 1:30pm, Concrete due at 2pm. Thanks Phone #: ###-#### Inspection requested via web by Mark Steen si on site
BLD-Foundation3/16/20183/19/20183/19/2018APASS
DetailsJim Storey
MTI to Insp rebar at 11am, 5 yds delivered at 11:30am for elev pit walls Phone #: ###-#### Inspection requested via web by Mark Steen
BLD-Footing3/12/20183/13/20183/13/2018PPASS
DetailsBrandon Shaw
Elevator pit footing Phone #: ###-#### Inspection requested via web by Mark Steen
CHANGE STATUS TO (ISS)  3/8/2018 DONE
Inspection Record Card- Bld  3/8/2018 DONE
OVERRIDE  3/6/2018  
Plan assigned to (JG)2/1/20182/1/20183/6/2018 PASS
DetailsJavier Guzman
1st rev comp, Plan mod, Vanilla 2nd Floor ePlan pend eng
Routing Off Site - STRUCTURAL2/20/2018 3/6/2018 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Dave Haugland
Permit Ready to Issue  3/6/2018 DONE
DO NOT RE ISSUE. PLAN MOD
Routing - PLAN CHECK2/20/2018 2/20/2018 PASS
DetailsJavier Guzman
Routing Off Site - STRUCTURAL2/2/2018 2/17/2018 FAIL
DetailsJavier Guzman
Failed in ePlan by AHJ Engineers Dave Haugland
Routing - PLAN CHECK2/2/2018 2/17/2018 FAIL
DetailsJavier Guzman
Routing - FIRE2/2/20182/2/20182/6/2018 PASS
DetailsScott Arellano
No change to previous approval.
Plan Modification Accepted  1/12/2018 DONE
Plan mod workflow started for modification of new interior stair width and relocate elevator to accommodate new stair width. An opening in the second floor originally proposed has been deleted, which adds approx. 108 SF to the proposed floor area.
Inspection Record Card- Bld  11/29/2017 DONE
Issue PAID IN FULL permit  11/29/2017 DONE
Extend Review Timeline  8/10/2017 DONE
Expiration Notice8/8/20178/29/20178/8/2017 DONE
DetailsBrittany Hill
OVERRIDE  8/7/2017  
Permit Ready to Issue  8/7/2017 DONE
DetailsChristina Prado
*RP - Met
*GC Form - Met
* Revised Certificate of Value - Met
PLANS/APPL TAKEN TO FRONT DESK  8/4/2017 DONE
Plan assigned to (JG)8/25/2016 8/4/2017 PASS
DetailsJavier Guzman
1st rev comp, 9/21 L3 Dykman WHS 2nd floor ePlan pend 180 day acceptance (exp. 8-17-17)
Routing - PLAN CHECK7/28/2017 7/29/2017 PASS
DetailsJavier Guzman
Routing - PLAN CHECK6/15/2017 7/3/2017 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL6/15/2017 7/1/2017 PASS
DetailsJavier Guzman
signed off in ePlan by AHJ Engineers Chris Holladay
Routing - FIRE6/15/20176/15/20176/15/2017 PASS
DetailsKatie Marron
Modified comments attached to case.
Routing - Design Review6/15/2017 6/15/2017 PASS
DetailsAndrea Tuning
Extend Review Timeline  4/10/2017 DONE
DetailsJason Blais
Plan Reviewer's activity  3/27/2017 DONE
DetailsJavier Guzman
180 Day letter sent
Route to Impact Fee Review9/19/20169/22/20169/20/2016 PASS
DetailsCindy M. Gould
1st review completed  9/19/2016 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK8/25/2016 9/19/2016 FAIL
DetailsJavier Guzman
Routing Off Site - STRUCTURAL8/25/2016 9/17/2016 FAIL
DetailsJavier Guzman
Failed in ePlan by Chris Holladay of AHJ Engineers
Routing - Erosion and Sediment8/25/2016 8/30/2016 PASS
DetailsEvan Jenkins
Applicant proposed to construct a second floor in an existing building buillt under BLD14-00904.
Routing - FIRE8/25/20168/25/20168/29/2016 PASS
DetailsKatie Marron
Comments attached to case.
Routing - PUBLIC WORKS8/25/2016 8/26/2016 PASS
DetailsRachael Beierle
Routing - Addressing8/25/2016 8/25/2016 PASS
DetailsLaura Hunter
Routing - Design Review8/25/2016 8/25/2016 PASS
DetailsAndrea Tuning
Intake Approval  8/25/2016 PASS
DetailsJavier Guzman
Application received  8/22/2016 DONE
Application submitted via PDS Online on Aug 22 2016 2:25PM