BLD-Final | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
DOC - Permit Finaled | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Jim Storey
|
|
|
|
BLD-Energy code compliance | 11/16/2016 | 11/18/2016 | 11/18/2016 | A | PASS |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
BLD-Framing/Rough-in | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | PART |
Phil Shearer
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner. Strap beam to top plate by sliding door, Floor joist hangers need to be replaced at stairs, window at top of stairs needs to be tempered. OK to insulate
|
BLD-Wall Bracing | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
BLD-Wall Bracing | 10/28/2016 | 11/1/2016 | 11/1/2016 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Weston Wagner
|
BLD-Foundation | 9/21/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Phil Shearer
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Conference | 9/21/2016 | 9/21/2016 | 9/21/2016 | P | CANC |
Phil Shearer
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Wednesday, September 21, 2016.
|
BLD-Footing | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Phil Shearer
|
|
|
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
Issue PAID IN FULL permit | | | 9/12/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/12/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/9/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 8/29/2016 | 8/29/2016 | 9/9/2016 | | DONE |
Brian McGowan
|
|
|
Due 9-7 - Fail - Wall bracing was transfered from another model and does not match
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/9/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 9/9/2016 | | DONE |
|
|
|
all requirments met
|
Routing - PLAN CHECK | 8/26/2016 | | 9/9/2016 | | PASS |
Brian McGowan
|
|
|
|
1st review completed | | | 9/7/2016 | | FAIL |
Brian McGowan
|
|
|
Wall Bracing does not match, no engineering was provided for the specified engineered walls
|
Routing - MECHANICAL | 8/26/2016 | | 9/1/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/26/2016 | | 8/29/2016 | | PASS |
Jeff Lowe
|
|
|
|
Plan assigned to (LEG) Tisha | 8/26/2016 | | 8/29/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Application received | | | 8/26/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 26 2016 8:34AM
|
Plans ACCEPTED BY PLAN TECH | | | 8/26/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/26/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/26/2016 | | DONE |
|
|
|
|
Routing - Addressing | 8/26/2016 | | 8/26/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 8/26/2016 | | 8/26/2016 | | PASS |
Rachael Beierle
|
|
|
|