BLD-Foundation | 12/21/2017 | 12/22/2017 | 12/22/2017 | P | PASS |
Tony Young
|
|
|
George-rebar in a retaining bar Phone #: ###-####
|
BLD-Concrete | 12/21/2017 | 12/21/2017 | 12/21/2017 | A | PASS |
Tony Young
|
|
|
Geroge Phone #: ###-####,, wall ok
|
BLD-Final | 12/8/2017 | 12/11/2017 | 12/11/2017 | A | PART |
Jim Storey
|
|
|
george Phone #: ###-#### interior of building ok to occ.
|
BLD-Final | 12/7/2017 | 12/8/2017 | 12/8/2017 | P | NR |
Dave Hannah
|
|
|
Geroge Phone #: ###-#### still no hillside signoff no inspection done
|
PubWorks Occupancy Approval | 12/8/2017 | 12/8/2017 | 12/8/2017 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 12/6/2017 | 12/7/2017 | 12/7/2017 | A | NR |
Jim Sly
|
|
|
George Phone #: ###-#### Told George that Public Works needs to sign off for Drainage prior to calling for Final Structural inspection.
|
BLD-Footing | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | PASS |
Dave Hannah
|
|
|
Wall // Charlie Phone #: ###-####
|
OVERRIDE | | | 12/6/2017 | | |
|
|
|
|
PubWorks Subgrade Approval | 12/6/2017 | 12/6/2017 | 12/6/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Plan assigned to (BJM) | 12/5/2017 | 12/5/2017 | 12/6/2017 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | | | 12/6/2017 | | PASS |
Brian McGowan
|
|
|
No added time for review, took 10 minutes.
|
Routing PW Grading-Hillside | 12/5/2017 | | 12/6/2017 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor ###-####.
|
Case Summary (BLD) | | | 12/6/2017 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/6/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/6/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/6/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 12/5/2017 | | DONE |
|
|
|
added retaining wall to project; received three copies of full size grading plan and two coipes of structural calcs
|
BLD-Conference | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PART |
Tony Young
|
|
|
George Phone #: ###-####,, ?s on final
|
BLD-Conference | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | DEFR |
Tony Young
|
|
|
George Phone #: ###-####,, meet after 3
|
BLD-Aging Inspection | 11/15/2017 | 11/15/2017 | 11/16/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 11/14/2017 | 11/14/2017 | 11/15/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Energy code compliance | 6/30/2017 | 7/3/2017 | 7/3/2017 | A | PASS |
Jim Sly
|
|
|
George Phone #: ###-####
|
BLD-Framing/Rough-in | 6/30/2017 | 7/3/2017 | 7/3/2017 | A | PASS |
Jim Sly
|
|
|
George Phone #: ###-####
|
BLD-Framing/Rough-in | 6/28/2017 | 6/29/2017 | 6/29/2017 | A | PART |
Jim Sly
|
|
|
George Phone #: ###-#### Added to Jim Storeys Correction Notice. (back side)
|
BLD-Framing/Rough-in | 6/21/2017 | 6/22/2017 | 6/22/2017 | A | FAIL |
Jim Storey
|
|
|
George Phone #: ###-#### not per the plan c/n only small list of defencies
|
BLD-Wall cover | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Tony Young
|
|
|
Dry wall // George Phone #: ###-####,, soffits ok
|
BLD-Wall Bracing | 5/23/2017 | 5/24/2017 | 5/24/2017 | A | PASS |
Brandon Shaw
|
|
|
charlie Phone #: ###-####
|
BLD-Foundation | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | PASS |
Dave Hannah
|
|
|
Sebatian Phone #: ###-####
|
BLD-Foundation | 3/15/2017 | 3/16/2017 | 3/16/2017 | P | PART |
Tony Young
|
|
|
Sebatian Phone #: ###-####,, house footings ok,, work in progress
|
BLD-Foundation | 2/27/2017 | 2/28/2017 | 3/1/2017 | A | PART |
Dave Hannah
|
|
|
Sebastian Phone #: ###-#### basement wall back side ok to pour
|
BLD-Footing | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | PASS |
Tony Young
|
|
|
Sebastian Phone #: ###-####,, retaining wall footings.. ok
|
BLD-Footing | 2/22/2017 | 2/23/2017 | 2/23/2017 | A | PART |
Tony Young
|
|
|
Sebastian Phone #: ###-####,, work in progress on retaining wall footings,,
|
PubWorks Subgrade Approval | 2/23/2017 | 2/23/2017 | 2/23/2017 | | DONE |
Jason C. Taylor
|
|
|
**MAKE SURE LOOSE AND MUDDY SOILS HAVE BEEN REMOVED AS PER GEOTECHNICAL ENGINEERS RECOMMENDATION***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | NR |
Tony Young
|
|
|
Sabastion Phone #: ###-####,, no inspection,, needs hillside soils report 1st
|
Issue PAID IN FULL permit | | | 11/16/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 11/7/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 8/29/2016 | 8/29/2016 | 11/7/2016 | | DONE |
Brian McGowan
|
|
|
Due 9-14 Level 2 - Stamped Sheet A2, Top of footing and foundation need noted
|
Inspection Record Card- Bld | | | 11/7/2016 | | DONE |
|
|
|
|
Telephone call | | | 11/7/2016 | | DONE |
|
|
|
called George- told him permit is ready and fees due
|
Routing - PLAN CHECK | 10/19/2016 | | 11/7/2016 | | PASS |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 11/7/2016 | | DONE |
|
|
|
received (2) sets of retaining wall calculations
|
Case Summary (BLD) | | | 11/7/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/7/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 11/7/2016 | | DONE |
|
|
|
All Met
|
Plan resubmittals received | | | 10/19/2016 | | DONE |
|
|
|
received (2) sets of resubmittals
|
1st review completed | | | 9/13/2016 | | FAIL |
|
|
|
Top of foundation and top of footing need to be noted on foundation plan. A noted wall section is required. Engineer's stamp needed on Sheet A2. Verify Foyer beam (not noted on plans)
|
Routing - PLAN CHECK | | | 9/13/2016 | | FAIL |
Brian McGowan
|
|
|
Top of foundation wall and footing needed. A2 needs to be signed by Engineer
|
Routing - FIRE | 9/6/2016 | | 9/7/2016 | | PASS |
Scott Arellano
|
|
|
Plans are approved as shown. No comments attached.
|
Routing - Erosion and Sediment | 9/2/2016 | | 9/6/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved, valid RP and PD. Site preparation inspection is REQUIRED.
|
Routing - MECHANICAL | 8/29/2016 | | 9/2/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 8/29/2016 | | 8/29/2016 | | PASS |
Brent Moore
|
|
|
|
Plan assigned to (LEG) Tisha | 8/26/2016 | | 8/29/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing PW Grading-Hillside | 8/26/2016 | | 8/29/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 8/29/2016 | | 8/29/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Sewer Rating | 8/26/2016 | | 8/26/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/26/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/26/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/26/2016 | | DONE |
|
|
|
|
Routing - Addressing | 8/26/2016 | | 8/26/2016 | | PASS |
Laura Hunter
|
|
|
|
Application received | | 8/26/2016 | | | |
|
|
|
|