BLD-Final | 1/4/2017 | 1/6/2017 | 1/6/2017 | A | PASS |
Phil Shearer
|
|
|
Eric-electrical final to be done AM as well Phone #: ###-####. NO mec permit needed no mechanical work was done.
|
DOC - Permit Finaled | 1/6/2017 | 1/6/2017 | 1/6/2017 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Framing/Rough-in | 10/11/2016 | 10/12/2016 | 10/13/2016 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Framing/Rough-in | 9/21/2016 | 9/21/2016 | 9/21/2016 | P | PART |
Jim Sly
|
|
|
Eric Phone #: ###-#### Floor OK
|
Issue PAID IN FULL permit | | | 9/2/2016 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 8/26/2016 | 8/26/2016 | 8/29/2016 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 8/29/2016 | | 8/29/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 8/29/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 8/29/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/29/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 8/29/2016 | | DONE |
|
|
|
NEED GC form
|
Telephone call | | | 8/29/2016 | | DONE |
|
|
|
called applicant- told him permit is ready, fees due, and that we need a GC form
|
Routing Walk-In (Zoning) | 8/26/2016 | 8/26/2016 | 8/26/2016 | P | PASS |
Josh Wilson
|
|
|
Garage remains above minimum size requirements with new wall. OK JGW 8-26-16
|
1st review completed | | | 8/26/2016 | | DONE |
Brian McGowan
|
|
|
|
Application received | | 8/26/2016 | | | |
|
|
|
|