BLD-Final | 1/7/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Dave Hannah
|
|
|
Mary (wife) Phone #: ###-####
|
DOC - Permit Finaled | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD - Request for Extension | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-#### ok to ext
|
BLD-Conference | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PASS |
Dave Hannah
|
|
|
kelly Phone #: ###-####
|
BLD-Conference | 6/27/2018 | 6/27/2018 | 6/27/2018 | P | CANC |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
BLD-Footing | 10/2/2017 | 10/2/2017 | 10/3/2017 | P | PASS |
Dave Hannah
|
|
|
Kelly Phone #: ###-####
|
PubWorks Subgrade Approval | 10/2/2017 | 10/2/2017 | 10/2/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Melissa Jannusch ###-####.
|
BLD - Request for Extension | 9/7/2017 | 9/7/2017 | 9/7/2017 | P | PEND |
Dave Hannah
|
|
|
Kelly Phone #: ###-#### ok to ext
|
(F) Reprint permit | | | 8/31/2017 | | DONE |
Christina Prado
|
|
|
|
Case Summary (BLD) | | | 8/8/2017 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 11/23/2016 | 11/23/2016 | 11/23/2016 | A | PASS |
Tisha Gallop
|
|
|
plan mod to connect deck to house and reduce size of select footing per revised engineering submitted.
|
Inspection Record Card- Bld | | | 11/23/2016 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 10/5/2016 | 10/5/2016 | 10/5/2016 | P | PASS |
Tisha Gallop
|
|
|
modification to change design of footing per engineering provided
|
Inspection Record Card- Bld | | | 10/5/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/13/2016 | | |
|
|
|
|
Telephone call | | | 9/13/2016 | | DONE |
|
|
|
called Anel to let know permit is ready and how much is owed-left message on the cell phone
|
Issue PAID IN FULL permit | | | 9/13/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 9/12/2016 | | 9/13/2016 | | DONE |
Tisha Gallop
|
|
|
**hillside deck, routed
|
Routing - PLAN CHECK | 9/12/2016 | | 9/13/2016 | | PASS |
Tisha Gallop
|
|
|
|
1st review completed | | | 9/13/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/13/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/13/2016 | | DONE |
|
|
|
need RP
|
Routing - FIRE | 9/12/2016 | 8/31/2016 | 9/12/2016 | | PASS |
Scott Arellano
|
|
|
Approved per HOA agreement on file.
|
Routing PW Grading-Hillside | 9/9/2016 | | 9/12/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing - Erosion and Sediment | 9/12/2016 | | 9/12/2016 | | PASS |
Evan Jenkins
|
|
|
Attaching deck to home (hillside). A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection.
|
Routing Walk-In (Zoning) | 8/31/2016 | 8/31/2016 | 8/31/2016 | A | PASS |
Celine Acord
|
|
|
Letter provided from HOA regarding mainted common space to provide defensible WUI space.
|
Application received | | 8/29/2016 | | | |
|
|
|
|