BLD-Conference | 9/30/2016 | 9/30/2016 | 10/3/2016 | P | PEND |
Tony Young
|
|
|
Check up
|
BLD-Conference | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | FAIL |
Tony Young
|
|
|
Need to make sure no work was done due to the Sewer permit. Contractor called in to have permit voided saying they are no longer doing the job. Please leave note or let me know. Thanks Brittany,, c/n posted,, need a valid permit to continue, SWO until permit is issued
|
Meeting | | | 9/29/2016 | | DONE |
|
|
|
see attached email letter stating that MJ Remodeling is no longer the GC
|
Telephone call | | | 9/29/2016 | | DONE |
|
|
|
new GC called-i asked him to get a letter from the parcel owner stating that they are going to take over the permit-i told him there was a fee of $46.31 due once we have that info-i told him he would need to talk to our records dept to get plans
|
VOIDED CHANGE STATUS | | | 9/29/2016 | | DONE |
|
|
|
Void permit per MJ Remodeling LLC. They are no longer going to be do the work
|
Issue PAID IN FULL permit | | | 9/12/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/9/2016 | | DONE |
|
|
|
All Met
|
Inspection Record Card- Bld | | | 9/9/2016 | | DONE |
|
|
|
|
Telephone call | | | 9/9/2016 | | DONE |
|
|
|
Left a message for Joseph informing him that this permit is ready to be picked up and the fee amount due for issuance
|
Plan assigned to (JG) | 8/30/2016 | 8/30/2016 | 9/8/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, L2 Serenity Retreat
|
Routing - PLAN CHECK | 9/8/2016 | | 9/8/2016 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 9/8/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/8/2016 | | DONE |
|
|
|
|
Routing - MECHANICAL | 9/7/2016 | | 9/7/2016 | | PASS |
Troy James
|
|
|
redlined the plans
|
1st review completed | | | 9/3/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 9/2/2016 | | 9/3/2016 | | FAIL |
Javier Guzman
|
|
|
failed mechanical review
|
Routing - MECHANICAL | 8/31/2016 | | 9/2/2016 | | FAIL |
Bill VanDegrift
|
|
|
emailed applicant corrections
|
Routing - PUBLIC WORKS | 8/30/2016 | | 8/31/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/30/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/30/2016 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/30/2016 | | DONE |
|
|
|
|
Routing - Addressing | 8/30/2016 | | 8/30/2016 | | PASS |
Laura Hunter
|
|
|
|
Application received | | 8/30/2016 | | | |
|
|
|
|