Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD16-03183
StatusVoid/No Violation
Name MJ REMODELING LLC
Site Address 2405 N BOGUS BASIN RD
Project NameSerenity Retreat
Customer NumberELE16-03100
ePlanReviewNo
Description
**(SERINITY RETREAT)** Permit is for the removal of approximately 21 lineal feet of interior nonbearing wall to make a hair/nail salon larger and add a new door/door frame leading to the nail salon. Approval is contingent upon adhering to the approved plans on file. Work to include electrical work, mechanical work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference9/30/20169/30/201610/3/2016PPEND
DetailsTony Young
Check up
BLD-Conference9/30/20169/30/20169/30/2016PFAIL
DetailsTony Young
Need to make sure no work was done due to the Sewer permit. Contractor called in to have permit voided saying they are no longer doing the job. Please leave note or let me know. Thanks Brittany,, c/n posted,, need a valid permit to continue, SWO until permit is issued
Meeting  9/29/2016 DONE
see attached email letter stating that MJ Remodeling is no longer the GC
Telephone call  9/29/2016 DONE
new GC called-i asked him to get a letter from the parcel owner stating that they are going to take over the permit-i told him there was a fee of $46.31 due once we have that info-i told him he would need to talk to our records dept to get plans
VOIDED CHANGE STATUS  9/29/2016 DONE
Void permit per MJ Remodeling LLC. They are no longer going to be do the work
Issue PAID IN FULL permit  9/12/2016 DONE
Permit Ready to Issue  9/9/2016 DONE
All Met
Inspection Record Card- Bld  9/9/2016 DONE
Telephone call  9/9/2016 DONE
Left a message for Joseph informing him that this permit is ready to be picked up and the fee amount due for issuance
Plan assigned to (JG)8/30/20168/30/20169/8/2016 PASS
DetailsJavier Guzman
1st review completed, L2 Serenity Retreat
Routing - PLAN CHECK9/8/2016 9/8/2016 PASS
DetailsJavier Guzman
Case Summary (BLD)  9/8/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/8/2016 DONE
Routing - MECHANICAL9/7/2016 9/7/2016 PASS
DetailsTroy James
redlined the plans
1st review completed  9/3/2016 FAIL
DetailsJavier Guzman
Routing - PLAN CHECK9/2/2016 9/3/2016 FAIL
DetailsJavier Guzman
failed mechanical review
Routing - MECHANICAL8/31/2016 9/2/2016 FAIL
DetailsBill VanDegrift
emailed applicant corrections
Routing - PUBLIC WORKS8/30/2016 8/31/2016 PASS
DetailsRachael Beierle
Plans ACCEPTED BY PLAN TECH  8/30/2016 DONE
Intake Approval  8/30/2016 PASS
DetailsJavier Guzman
Recd Pcfee & Taken To Pln CK  8/30/2016 DONE
Routing - Addressing8/30/2016 8/30/2016 PASS
DetailsLaura Hunter
Application received 8/30/2016