OVERRIDE | | | 11/15/2016 | | |
|
|
|
|
BLD-Footing | 9/14/2016 | 9/14/2016 | 9/16/2016 | P | PART |
Tony Young
|
|
|
Noah Phone #: ###-####,, window well ftgs,, work in progress
|
Routing Walk-In (BLD) | 9/6/2016 | 9/6/2016 | 9/6/2016 | A | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 9/6/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 9/6/2016 | | 9/6/2016 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/6/2016 | | DONE |
|
|
|
RDY status was NOT inputted initially
|
CHANGE STATUS TO (ISS) | | | 9/6/2016 | | DONE |
|
|
|
RDY status was NOT inputted initially
|
Routing Walk-In (Zoning) | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | FAIL |
Brian McGowan
|
|
|
Basement was excavated after the home was built and has a 36" conc recessed step. More detailed plans are needed to show how it will be done.
|
1st review completed | | | 8/30/2016 | | DONE |
|
|
|
|
Application received | | 8/30/2016 | | | |
|
|
|
|