Permanent Occupancy | | | 10/5/2016 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 10/5/2016 | | DONE |
|
|
|
C of O reissued due to error on original C. O. The building is fully sprinklerd and the CO said that it wasn't.
|
Permanent Occupancy | | | 10/5/2016 | | DONE |
|
|
|
|
BLD-Final | 10/3/2016 | 10/4/2016 | 10/4/2016 | A | PASS |
Mike Jordan
|
|
|
Paperwork located in office - Jeff Phone #: ###-####. All issues resolved. Ok for perm occ.
|
BLD-Final | 9/26/2016 | 9/27/2016 | 9/27/2016 | P | FAIL |
Mike Jordan
|
|
|
Paperwork in office - Jeff Phone #: ###-####. Provide 4 inch wall base in restroom.
|
FIRE-Final Inspection | 9/26/2016 | 9/27/2016 | 9/27/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 9/7/2016 | 9/12/2016 | 9/12/2016 | P | NR |
Mike Jordan
|
|
|
Jeff Phone #: ###-####. Fire/life/safety final failed.
|
FIRE-Final Inspection | 9/7/2016 | 9/9/2016 | 9/9/2016 | P | FAIL |
Troy Cobbley
|
|
|
Replace painted sprinkler heads, repaire exit signs and emergency lights, reverse door swing on rear exit screen door, provide lever hardware on the door to second exit and provide occupant load sign (162)
|
Issue PAID IN FULL permit | | | 9/7/2016 | | DONE |
|
|
|
|
Plan assigned to (DAF) | 8/31/2016 | 8/31/2016 | 9/6/2016 | | DONE |
David Ferguson
|
|
|
due 9/05
|
Routing - PLAN CHECK | 9/1/2016 | | 9/6/2016 | | PASS |
David Ferguson
|
|
|
|
1st review completed | | | 9/6/2016 | | DONE |
David Ferguson
|
|
|
|
Case Summary (BLD) | | | 9/6/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/6/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/6/2016 | | DONE |
|
|
|
|
Telephone call | | | 9/6/2016 | | DONE |
|
|
|
|
Telephone call | | | 9/6/2016 | | DONE |
|
|
|
called Jeff to let know permit is ready and that he will need 3 inspections once the permit is issued in order to get the C of O
|
Routing - PUBLIC WORKS | 8/31/2016 | | 9/1/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Addressing | 8/31/2016 | | 8/31/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/31/2016 | | DONE |
|
|
|
|
Intake Approval | | | 8/31/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/31/2016 | | DONE |
|
|
|
|
First Notice | | 10/15/2016 | | | |
|
|
|
|
Application received | | 8/31/2016 | | | |
|
|
|
|