Print Statement | | | 9/27/2017 | | DONE |
|
|
|
|
First Notice | | 8/13/2017 | 9/19/2017 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 8/3/2017 | 8/3/2017 | 8/3/2017 | | DONE |
Mike Sheppard
|
|
|
|
Zoning Approval | 8/3/2017 | 8/3/2017 | 8/3/2017 | | PASS |
Sarah Schafer
|
|
|
|
Permanent Occupancy | | | 8/3/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 8/2/2017 | | DONE |
|
|
|
|
BLD-Final | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Dave Hannah
|
|
|
Bruce Phone #: ###-####
|
BLD-Final | 6/1/2017 | 6/2/2017 | 6/2/2017 | A | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### ok for temp occ needs to fix landings out back door
|
FIRE-Final Inspection | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete (fire alarm permit, FIR17-00143, is not attached in project related cases), fire extinguishers are in place with current inspection tags, thumbturn locks on south entrance doors will be changed to double-key deadbolts before final BLD inspection. Final life fire safety inspection passed/complete.
|
BLD-Ceiling Grid Inspection | 5/16/2017 | 5/17/2017 | 5/18/2017 | A | PEND |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### ok after elec rough in passes
|
BLD-Energy code compliance | 4/12/2017 | 4/13/2017 | 4/13/2017 | P | PASS |
Mike Jordan
|
|
|
Insulation // Bruce Phone #: ###-####
|
BLD-Framing/Rough-in | 4/7/2017 | 4/10/2017 | 4/10/2017 | A | PASS |
Dave Hannah
|
|
|
Bruce-fire blocking on 1st floor Phone #: ###-####
|
BLD-Framing/Rough-in | 4/5/2017 | 4/7/2017 | 4/7/2017 | A | PASS |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### ok to insulate
|
BLD-Wall Bracing | 2/14/2017 | 2/15/2017 | 2/16/2017 | A | PART |
Dave Hannah
|
|
|
Bruce Phone #: ###-#### ok to cover ext but needs to add foundation bolts and washers
|
BLD-Foundation | 12/29/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Phil Shearer
|
|
|
tint foundation.. pour at 11 // Bruce Phone #: ###-####. Forms are tented and heated.
|
BLD-Foundation | 12/28/2016 | 12/29/2016 | 12/29/2016 | A | PASS |
Dave Hannah
|
|
|
lonnie Phone #: ###-#### crew has tent up and ready for heaters
|
BLD-Footing | 12/22/2016 | 12/22/2016 | 12/22/2016 | P | PASS |
Dave Hannah
|
|
|
late morning if possible pour at 2 // Shawn Phone #: ###-####
|
BLD-Footing | 12/20/2016 | 12/22/2016 | 12/22/2016 | A | NR |
Dave Hannah
|
|
|
late morning if possible pour at 2 // Shawn Phone #: ###-####
|
Telephone call | | | 12/8/2016 | | DONE |
|
|
|
as per Valerie at ACHD no fees requried and no inspection required-Dawn will send me the paperwork and i will put it in the documents
|
Issue PAID IN FULL permit | | | 12/8/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/8/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 12/7/2016 | | |
|
|
|
|
Plan assigned to (CJW) | 10/12/2016 | 10/12/2016 | 12/7/2016 | | PASS |
Carl Westfall
|
|
|
(1st done) (Nov 1 - 15 days) Resident Inn By Marriot
|
Routing - PLAN CHECK | 12/5/2016 | | 12/7/2016 | | PASS |
Carl Westfall
|
|
|
Drawings approved after 3rd review
|
Routing PW Sewer Rating | 12/7/2016 | | 12/7/2016 | | PASS |
Rachael Beierle
|
|
|
Added drinking fountains see Sheet A108
No additional fee for drinking fountain. Raited as food service.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/7/2016 | | DONE |
|
|
|
Need ACHD, RP, GC Form and Revised Cert of Value
|
Plan resubmittals received | | | 12/5/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 12/3/2016 | | DONE |
|
|
|
|
Routing Off Site - C.D.H | 12/1/2016 | | 12/2/2016 | | PASS |
Carl Westfall
|
|
|
Brent Copes
|
Routing Off Site - STRUCTURAL | 12/1/2016 | | 12/1/2016 | | PASS |
Carl Westfall
|
|
|
Chris Holladay - AHJ
|
Routing - PLAN CHECK | 11/30/2016 | | 12/1/2016 | | FAIL |
Carl Westfall
|
|
|
2nd plan review failed. Emailed an abreviated copy of the plan review report to the Architect.
|
Plan resubmittals received | | | 11/30/2016 | | DONE |
|
|
|
|
Route to Impact Fee Review | 11/9/2016 | 11/12/2016 | 11/17/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 11/9/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 11/9/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/12/2016 | | 11/9/2016 | | FAIL |
Carl Westfall
|
|
|
See the plan review report
|
Routing - PLUMBING | 10/12/2016 | | 10/18/2016 | | PASS |
Bill VanDegrift
|
|
|
UPC 1014.2.1 flow control air inlet to connect to the sanitary venting system
|
Routing Off Site - STRUCTURAL | 10/12/2016 | | 10/18/2016 | | FAIL |
Carl Westfall
|
|
|
Chris Holladay - AHJ
|
Routing - FIRE | 10/12/2016 | 10/12/2016 | 10/14/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing Off Site - C.D.H | 10/12/2016 | | 10/13/2016 | | FAIL |
Carl Westfall
|
|
|
Brent Copes
|
Routing - PLANNING Land Div | 10/12/2016 | | 10/13/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - Addressing | 10/12/2016 | | 10/12/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 10/12/2016 | | 10/12/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 10/12/2016 | | 10/12/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. Need to designate RP
|
Routing PW Drainage | 10/12/2016 | | 10/12/2016 | | PASS |
Brian Murphy
|
|
|
with conditions
|
Routing PW Sewer Rating | 10/12/2016 | | 10/12/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 10/12/2016 | | 10/12/2016 | | PASS |
Troy James
|
|
|
mechanical inspector to verify gas piping to new fireplace is sized per the IFGC
|
Routing - Design Review | 10/12/2016 | | 10/12/2016 | | PASS |
Josh Wilson
|
|
|
|
Intake Approval | | | 10/12/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
|
Intake Approval | | | 10/11/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
The only document you are missing now is the fire flow. Please contact Suez for this document.
|
Intake Approval | | | 10/5/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please see check list for items missing from submittal.
|
Intake Approval | | | 9/12/2016 | | FAIL |
Adele J Schaffeld-Griffin
|
|
|
Please complete and upload the 502 check list.
Please upload all of the additional documents required from the check list.
Once this information is received I will complete the pre screen process.
|
Application received | | | 9/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 1 2016 1:30PM
|