Permit Information
Permit NumberBLD16-03246
StatusFinaled
Name BERKELEY BUILDING COMPANY INC
Site Address 670 N SAN FELIPE DR
Project NameDavis Home
Customer Number 
ePlanReviewYes
Description
WUI Zone A; *11/13/17 Plan modification to add retaining wall (less than 4') on East side of property and grading/drainage modifications.//leg* Permit for the construction of a new 2706 sq. ft., one story (above grade 1441 sq. ft., below grade 1265 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 95 sq. ft. of covered patio/porch, 216 elevated deck, and a 468 sq. ft. attached garage per the approved plans, engineering, ResCheck ,ACCA report and any notations. R-1B zoning and setbacks per planning. //leg
***A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/20/201712/21/201712/21/2017APASS
DetailsDave Hannah
Inspection requested via web by Marc Foote
DOC - Permit Finaled12/21/201712/21/201712/21/2017PPASS
DetailsDave Hannah
PubWorks Occupancy Approval12/20/201712/20/201712/20/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department Jason Taylor ###-####.
BLD-Grading Inspection12/19/201712/20/201712/19/2017ACANC
DetailsDave Hannah
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
OVERRIDE  11/13/2017  
CHANGE STATUS TO (ISS)  11/13/2017 DONE
DetailsChristina Prado
(F) Reprint permit  11/13/2017 DONE
Plan assigned to (LEG) Tisha11/8/2017 11/13/2017 DONE
DetailsTisha Gallop
plan mod
Routing - PLAN CHECK11/8/2017 11/13/2017 PASS
DetailsTisha Gallop
plan mod no fee due
Routing PW Grading-Hillside11/8/2017 11/13/2017 PASS
DetailsJason C. Taylor
Plan Mod approved



A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at ###-####.
Permit Ready to Issue  11/13/2017 DONE
DetailsChristina Prado
All requirements met for plan mod - no fees due
Routing - PLANNING11/8/2017 11/9/2017 PASS
DetailsNicolette Womack
Plan Modification Accepted  11/8/2017 DONE
DetailsChristina Prado
Plan Mod requested to include the following. Route to BLD, Planning, PW Hillside
1.Show retaining wall along Shaw Mountain Road side.
2.Add 12’x12’ concrete pad.
3.Add retaining wall at concrete pad.
4.Add trench drain at driveway.
5.Revise driveway spot elevations.
6.Add French drain.
7.Add roof drain pipes discharge to French drain.
8.Add area drain on the south side.
9.Revise drainage swale on south side.
10.Add revision marks and revision summary note to drawings.
11.Drawings have todays date.
BLD-Energy code compliance10/16/201710/16/201710/16/2017PPASS
DetailsDave Hannah
Inspection requested via web by Marc Foote
BLD-Framing/Rough-in10/13/201710/13/201710/13/2017PPASS
DetailsDave Hannah
Inspection requested via web by Marc Foote
BLD-Framing/Rough-in10/5/201710/5/201710/5/2017PNR
DetailsDave Hannah
Inspection requested via web by Marc Foote
BLD-Framing/Rough-in10/4/201710/6/201710/5/2017ACANC
DetailsDave Hannah
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
BLD-Framing/Rough-in10/3/201710/3/201710/3/2017PFAIL
DetailsDave Hannah
Inspection requested via web by Marc Foote
Plan Modification Accepted  10/3/2017 DONE
new manual j report
Routing - MECHANICAL10/3/2017 10/3/2017 PASS
DetailsTroy James
resubmitted manual j report
BLD-Wall Bracing9/19/20179/20/20179/20/2017APASS
DetailsDave Hannah
Inspection requested via web by Marc Foote
Plan Modification Accepted  9/20/2017 DONE
new manual j report
Routing - MECHANICAL9/20/2017 9/20/2017 PASS
DetailsTroy James
resubmitted manual j report
Builder changed his mind. Decided to go with the original acca report.9/21/17
BLD-Framing/Rough-in7/28/20177/28/20177/28/2017PCANC
DetailsDave Hannah
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
BLD-Energy code compliance7/28/20177/28/20177/28/2017PCANC
DetailsDave Hannah
>> Inspection requested via web by Marc Foote Inspection cancelled from web by: Marc Foote
BLD-Framing/Rough-in7/27/20177/27/20177/28/2017PNR
DetailsDave Hannah
Inspection requested via web by Marc Foote
BLD-Foundation6/22/20176/23/20176/23/2017APASS
DetailsBrandon Shaw
Basement... as early as possible // jared Phone #: ###-####
BLD-Footing6/21/20176/21/20176/21/2017PPASS
DetailsBrandon Shaw
Jared Phone #: ###-####
PubWorks Subgrade Approval6/21/20176/21/20176/21/2017 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
Issue PAID IN FULL permit  4/11/2017 DONE
Inspection Record Card- Bld  4/11/2017 DONE
Override - Parcel Holds  2/16/2017  
Extend Review Timeline  2/16/2017 DONE
1st approved 180 day extension per Adele. See documents
Expiration Notice2/6/20172/28/20172/6/2017 DONE
DetailsBrittany Hill
OVERRIDE  12/12/2016  
Override - Parcel Holds  12/12/2016  
Permit Ready to Issue  12/12/2016 DONE
All Met
Routing PW Grading-Hillside12/7/2016 12/9/2016 PASS
DetailsJason C. Taylor

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
PLANS/APPL TAKEN TO FRONT DESK  12/9/2016 DONE
Plan assigned to (LEG) Tisha9/9/2016 12/9/2016 DONE
DetailsTisha Gallop
2st review 10/14; L2 hillside (plan check ok) appeal on CFH in process
Plan resubmittals received  12/7/2016 DONE
Routing - PLAN CHECK12/7/2016 12/7/2016 PASS
DetailsTisha Gallop
Plan resubmittals received  11/30/2016 DONE
Routing - PLAN CHECK11/30/2016 11/30/2016 PASS
DetailsTisha Gallop
Routing - PLANNING11/30/2016 11/30/2016 PASS
DetailsNicolette Womack
Routing PW Grading-Hillside11/30/2016 11/30/2016 FAIL
DetailsJason C. Taylor
Need revised grading plan that shows stairway removed and grade adjusted. JCT.
Plan resubmittals received  10/19/2016 DONE
Routing - PLAN CHECK10/19/2016 10/19/2016 FAIL
DetailsTisha Gallop
CFH appeal in process. Hearing scheduled for 11/14/16. emailed Bryan Hash cannot resubmit until appeal is over or if any drawings are revised.
Routing - PLAN CHECK10/12/2016 10/18/2016 FAIL
DetailsTisha Gallop
pending approval from planning and PW hillside
Plan resubmittals received  10/18/2016 DONE
Routing PW Grading-Hillside10/12/2016 10/14/2016 FAIL
DetailsJason C. Taylor
CFH has been appealed and will need to be resolved prior to approval of the grading plan. JCT
Routing - Erosion and Sediment10/12/2016 10/14/2016 PASS
DetailsAndy J. Long
ESC site plan and narrative submitted and approved. ESC site preparation inspection REQUIRED. Call ###-#### or ###-####
Routing - FIRE10/12/201610/12/201610/13/2016 PASS
DetailsKatie Marron
Plans were reviewed for FD Access and hydrant availability. No comments required
Routing - PLANNING10/12/2016 10/12/2016 FAIL
DetailsNicolette Womack
CFH has been appealed, must be resolved before proceeding.
Plan resubmittals received  10/12/2016 DONE
Plan resubmittals received  9/20/2016 DONE
Routing - PLAN CHECK9/20/2016 9/20/2016 FAIL
DetailsTisha Gallop
did not address comments from PW hillside, planning or building
Plan resubmittals received  9/19/2016 DONE
Routing - PLAN CHECK9/19/2016 9/19/2016 FAIL
DetailsTisha Gallop
uploded plans for wrong project
Routing - Erosion and Sediment9/9/2016 9/13/2016 FAIL
DetailsEvan Jenkins
Upload corrective ESC Narrative and Site Map for this Project.
Evan Jenkins 794.3958
Routing PW Grading-Hillside9/9/2016 9/13/2016 FAIL
DetailsJason C. Taylor
per ePlan
1st review completed  9/13/2016 FAIL
DetailsTisha Gallop
Routing - PLAN CHECK9/9/2016 9/13/2016 FAIL
DetailsTisha Gallop
Routing - PLANNING9/9/2016 9/12/2016 FAIL
DetailsJeff Lowe
needs CFH approved first
Routing - FIRE9/9/20169/9/20169/9/2016 FAIL
DetailsKatie Marron
Provide plans do not match location stated on permit.
Routing - Addressing9/9/2016 9/9/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS9/9/2016 9/9/2016 PASS
DetailsRachael Beierle
Routing - MECHANICAL9/9/2016 9/9/2016 PASS
DetailsTroy James
Intake Approval  9/9/2016 FAIL
DetailsChristina Prado
Need ESC Narrative & Plan
Plans ACCEPTED BY PLAN TECH  9/9/2016 DONE
Intake Approval  9/9/2016 PASS
Recd Pcfee & Taken To Pln CK  9/9/2016 DONE
Application received  9/1/2016 DONE
Application submitted via PDS Online on Sep 1 2016 3:51PM