BLD-Final | 3/16/2017 | 3/17/2017 | 3/17/2017 | A | PASS |
Dave Hannah
|
|
|
would like call ahead Phone #: ###-####
|
FIRE-Final Inspection | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | PASS |
Jim Page
|
|
|
Final inspection for commercial hood fire suppression system complete, no fire sprinklers, no fire alarms, fire extinguishers are in place and will be tagged with a current inspection tag. Final life fire safety inspection passed/complete.
|
BLD-Framing/Rough-in | 3/1/2017 | 3/2/2017 | 3/2/2017 | A | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
BLD-Framing/Rough-in | 2/28/2017 | 2/28/2017 | 2/28/2017 | P | NR |
Dave Hannah
|
|
|
Chris Phone #: ###-#### needs trades signoff also i ok change to wall
|
Telephone call | | | 2/17/2017 | | DONE |
|
|
|
Left a message for Chris informing him that this permit is going to expire in 12 days and that I saw the GC Form and Revised Value were turn in, but the permit was not paid for/issued. Recommended they send in a request for a 180 day extension if they are not ready just yet to get the permit.
|
Issue PAID IN FULL permit | | | 2/17/2017 | | DONE |
|
|
|
|
Expiration Notice | 2/6/2017 | 2/28/2017 | 2/6/2017 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (JG) | 9/6/2016 | 9/6/2016 | 10/24/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 9/19 L2 Gill's K9 Bar KITCHEN REMODEL ePlan
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/24/2016 | | DONE |
|
|
|
***MET 2-16-17 CAN***Needs GC Form & Revised Cert of Value
|
Routing - PLAN CHECK | 10/21/2016 | | 10/24/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 10/21/2016 | | 10/21/2016 | | PASS |
Troy James
|
|
|
redlined the plans
|
Routing - PLAN CHECK | 10/7/2016 | | 10/10/2016 | | FAIL |
Javier Guzman
|
|
|
egineering submitted but no curb/platform details were submitted as previously requested
|
Routing - MECHANICAL | 10/7/2016 | | 10/7/2016 | | FAIL |
Troy James
|
|
|
Talked to the hood installer and the mechanical engineer. Engineer will revise drawing to show utility set fan for grease exhaust.
|
Routing PW Environmental | 9/20/2016 | | 9/23/2016 | | PASS |
Rick Christenson
|
|
|
Will follow up with on-site inspection for verification of changes.
|
Routing - PLUMBING | 9/20/2016 | | 9/21/2016 | | PASS |
Daryl Spivey
|
|
|
P-2 vegi sink must be indirectly wasted to a floor sink
|
Routing - PLAN CHECK | 9/20/2016 | | 9/20/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 9/20/2016 | | 9/20/2016 | | FAIL |
Troy James
|
|
|
previous comments have not been addressed
|
1st review completed | | | 9/19/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 9/6/2016 | | 9/19/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - MECHANICAL | 9/6/2016 | | 9/14/2016 | | FAIL |
Troy James
|
|
|
|
Routing - Addressing | 9/6/2016 | | 9/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - FIRE | 9/6/2016 | 9/6/2016 | 9/7/2016 | | PASS |
Katie Marron
|
|
|
Comments attached to case.
|
Routing PW Environmental | 9/7/2016 | | 9/7/2016 | | FAIL |
Rick Christenson
|
|
|
Proper sized Grease Trap needed. Trap to be connected to P-3 sink. Grease Trap cannot be connected to Dishwasher.
|
Routing PW Sewer Rating | 9/7/2016 | | 9/7/2016 | | PASS |
Rachael Beierle
|
|
|
NEED FOOD MENU. MUST PAY SEWER IMPACT FOR FOOD SERVICE BASED ON CUSTOMER SERVICE AREA.
|
Routing - PUBLIC WORKS | 9/6/2016 | | 9/7/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - PLUMBING | 9/6/2016 | | 9/7/2016 | | FAIL |
Daryl Spivey
|
|
|
Resubmit to requirements of public works grease abatement.
|
Intake Approval | | | 9/6/2016 | | PASS |
Javier Guzman
|
|
|
|
Intake Approval | | | 9/4/2016 | | FAIL |
David Ferguson
|
|
|
1) Need approval from Central District Health Department
2) Provide a Key Plan of the building that shows where in the building the proposed work is to take place
|
Application received | | | 9/1/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 1 2016 6:36PM
|