BLD-Final | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Tony Young
|
|
|
Rosie-please go as late as possible as the ele is early pm Phone #: ###-####
|
DOC - Permit Finaled | 7/23/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Tony Young
|
|
|
c of c/o issued
|
BLD-Framing/Rough-in | 6/8/2018 | 6/8/2018 | 6/8/2018 | P | PASS |
Dave Hannah
|
|
|
Biff-framing on 2 windows-call Biff for access Phone #: ###-####
|
OVERRIDE | | | 5/24/2018 | | |
|
|
|
|
Plan assigned to (BJM) | 5/24/2018 | 5/24/2018 | 5/24/2018 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 5/24/2018 | | 5/24/2018 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 5/24/2018 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 5/24/2018 | | DONE |
|
|
|
please do no re issue
|
Telephone call | | | 5/24/2018 | | DONE |
|
|
|
called Biff to let know permit is ready-left message and will also email him
|
CHANGE STATUS TO (ISS) | | | 5/24/2018 | | DONE |
|
|
|
|
(F) Reprint permit | | | 5/24/2018 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 5/24/2018 | | DONE |
|
|
|
adding window to addition
|
BLD-Aging Inspection | 5/4/2018 | 5/4/2018 | 5/8/2018 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 12/19/2017 | 12/19/2017 | 12/21/2017 | | PASS |
Tony Young
|
|
|
|
Extend Permit 90/180 days | | 12/19/2017 | 12/19/2017 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
180 day extention granted per applicant request
|
BLD-Framing/Rough-in | 8/7/2017 | 8/7/2017 | 8/7/2017 | P | PASS |
Tony Young
|
|
|
entry - Biff Phone #: ###-####
|
BLD-Aging Inspection | 4/20/2017 | 4/20/2017 | 4/24/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/19/2017 | 4/19/2017 | 4/24/2017 | | PASS |
Tony Young
|
|
|
|
BLD-Other | 1/3/2017 | 1/3/2017 | 1/3/2017 | P | PASS |
Tony Young
|
|
|
I have installed a new header between the kitchen and the new room and want to give you a chance to look at it before I cover it up. I will also send an email with pictures so you can decide if a site visit is necessary.
Please call if you have questions. Phone #: ###-#### Inspection requested via web by Biff Jones,, new header between addition and existing kitchen area
|
Case Summary (BLD) | | | 12/23/2016 | | DONE |
Brian McGowan
|
|
|
|
BLD-Energy code compliance | 12/6/2016 | 12/6/2016 | 12/6/2016 | P | PART |
Tony Young
|
|
|
Biff Phone #: ###-####-please call before you do the inspection,, ok to cover after finishing insulation and seal package,, mechanical can be looked at later in attic
|
BLD-Framing/Rough-in | 12/6/2016 | 12/6/2016 | 12/6/2016 | P | PART |
Tony Young
|
|
|
Biff Phone #: ###-####-please call before you do your inspection,, ok to cover after minor fixes
|
BLD-Wall Bracing | 11/1/2016 | 11/1/2016 | 11/1/2016 | P | PASS |
Tony Young
|
|
|
Biff would like to cover if possible.###-####,, work in progress,, ok to cover exterior when done
|
Telephone call | | | 10/28/2016 | | DONE |
|
|
|
customer in office. Ok to change angle of stick framed hip end of roof and hip girder to (2) 2x10, longest rafter to 2x8 and subsequent rafters to 2x6 @ 16" o.c. All rafter on short hip end can stay 2x6 @ 24" o.c.
|
BLD-Foundation | 9/20/2016 | 9/20/2016 | 9/20/2016 | A | PASS |
Tony Young
|
|
|
would like call ahead; Biff Jones ###-####
|
BLD-Footing | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
Jim Storey
|
|
|
Biff would like to pour at 11:30 Monday AM. His wife will be home this afternoon, but if you have questions call Biff. Phone #: ###-####
|
Routing Walk-In (BLD) | 9/13/2016 | 9/13/2016 | 9/13/2016 | P | PASS |
Tisha Gallop
|
|
|
Plan modification to resize spot footing and additional header in preparation for future addition.
|
OVERRIDE | | | 9/2/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 9/2/2016 | 9/2/2016 | 9/2/2016 | A | PASS |
Josh Wilson
|
|
|
Ok per R-1C setbacks.
|
Routing Walk-In (BLD) | 9/2/2016 | 9/2/2016 | 9/2/2016 | | DONE |
Tisha Gallop
|
|
|
|
Routing Walk-In PW FloodPlain | 9/2/2016 | 9/2/2016 | 9/2/2016 | A | PASS |
Jim Wyllie
|
|
|
per Jim Wylie addition to existing house is not in floodplain
|
Routing Walk-In (BLD) | 9/2/2016 | 9/2/2016 | 9/2/2016 | A | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 9/2/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 9/2/2016 | | 9/2/2016 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 9/2/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/2/2016 | | DONE |
|
|
|
all requirements met
|
Issue PAID IN FULL permit | | | 9/2/2016 | | DONE |
|
|
|
|
Application received | | 9/2/2016 | | | |
|
|
|
|