BLD-Final | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | PEND |
Mike Jordan
|
|
|
Devin Phone #: ###-####. Needs to mount vertical grab bar at correct location (exceeds the 41" max from rear wall). Also noted several pieces of machining equipment tha thas ben moved in and wired. Per scope of work, this is a vanilla shell permit only, and no occupancy is allowed under this permit. Noted to ESI super to either have the existing permit modifed or have new tenants submit plans for occupancy. Noted that nothing has been submitted thus far for occupancy. Will final this permit when new tenant has submitted plans to planning and zoning for review.
|
FIRE-Final Inspection | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | PASS |
Troy Cobbley
|
|
|
LIfe safety passed. Milling machines have been moved in so I let the contractor know that this permit is not for an occupancy. And that a separate permit will be required.
Devon Phone #: ###-####
|
BLD-Framing/Rough-in | 10/20/2016 | 10/21/2016 | 10/21/2016 | P | PART |
Mike Jordan
|
|
|
Devin Phone #: ###-####. INterior steel stud framed walls and hardlid ok. Pending plumbing rough in inspection.
|
Permit Ready to Issue | | | 9/20/2016 | | DONE |
Christina Prado
|
|
|
***All Met***Need GC Form & Revised Certificate of Value for issuance
|
Issue PAID IN FULL permit | | | 9/20/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/20/2016 | | DONE |
|
|
|
|
Plan assigned to (JG) | 9/6/2016 | 9/6/2016 | 9/19/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 9/19 L2 Vanilla Shell TI, Suite 102
|
Routing - PLAN CHECK | 9/19/2016 | | 9/19/2016 | | PASS |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/19/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/6/2016 | | 9/16/2016 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 9/16/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - Addressing | 9/6/2016 | | 9/8/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - FIRE | 9/6/2016 | 9/6/2016 | 9/7/2016 | | PASS |
Katie Marron
|
|
|
No comments attached.
|
Routing - PUBLIC WORKS | 9/6/2016 | | 9/7/2016 | | PASS |
Rachael Beierle
|
|
|
|
Intake Approval | | | 9/6/2016 | | PASS |
Javier Guzman
|
|
|
|
Application received | | | 9/2/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 2 2016 1:48PM
|