BLD-Final | 4/10/2017 | 4/11/2017 | 4/11/2017 | A | PASS |
Tony Young
|
|
|
Blake Phone #: ###-####,, after further code review,, tempered glass on the stair landings is not required.. glass is 37" above,, 2012 IRC requires if below 36"
|
DOC - Permit Finaled | 4/11/2017 | 4/11/2017 | 4/11/2017 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Blower Door Test Results | 4/10/2017 | 4/11/2017 | 4/11/2017 | A | PASS |
Tony Young
|
|
|
Blake Phone #: ###-####/// 4.7
|
BLD-Final | 4/7/2017 | 4/10/2017 | 4/10/2017 | A | NR |
Tony Young
|
|
|
Blake Phone #: ###-####,, needs temp glass
|
BLD-Final | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | PART |
Tony Young
|
|
|
Blake Phone #: ###-####,, all ok,, just needs tempered glass
|
BLD-Final | 4/6/2017 | 4/7/2017 | 4/7/2017 | A | PEND |
Tony Young
|
|
|
Blake Phone #: ###-####
|
BLD-Final | 4/5/2017 | 4/6/2017 | 4/6/2017 | P | NR |
Tony Young
|
|
|
Blake Phone #: ###-####,, needs blower door test,, energy sticker,, tempered glass on stairs
|
PubWorks Occupancy Approval | 4/6/2017 | 4/6/2017 | 4/6/2017 | | DONE |
Jason C. Taylor
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Final | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | NR |
Tony Young
|
|
|
Phone #: ###-####,, need trades,, hillside by Public works
|
BLD-Final | 4/3/2017 | 4/4/2017 | 4/4/2017 | A | NR |
Tony Young
|
|
|
Phone #: ###-####,, needs mech 1st
|
BLD-Wall Bracing | 1/23/2017 | 1/24/2017 | 1/24/2017 | A | PASS |
Tony Young
|
|
|
Blake Phone #: ###-####
|
BLD-Energy code compliance | 1/23/2017 | 1/23/2017 | 1/23/2017 | P | PASS |
Tony Young
|
|
|
Blake Phone #: ###-####
|
BLD-Framing/Rough-in | 1/23/2017 | 1/23/2017 | 1/23/2017 | P | PASS |
Tony Young
|
|
|
Blake Phone #: ###-####
|
BLD-Framing/Rough-in | 1/19/2017 | 1/20/2017 | 1/20/2017 | A | NR |
Tony Young
|
|
|
Blake Phone #: ###-####,, sprinklers ok,, ok to insulate,, will verify frame corrections at energy code,, need temperd glasss at stair landing
|
BLD-Framing/Rough-in | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | FAIL |
Tony Young
|
|
|
Blake Phone #: ###-####,, correction notice posted,, do not insulate
|
Routing - MECHANICAL | 12/29/2016 | | 12/29/2016 | | PASS |
Troy James
|
|
|
resubmitted manual j report
|
BLD-Wall Bracing | 12/16/2016 | 12/19/2016 | 12/19/2016 | A | NR |
Tony Young
|
|
|
Shear Call half hour before // Blake Phone #: ###-####
|
BLD-Wall Bracing | 12/15/2016 | 12/16/2016 | 12/16/2016 | A | PART |
Tony Young
|
|
|
Shear Call half hour before // Blake Phone #: ###-####,, need some areas re-nailed,, then ok
|
BLD-Foundation | 11/1/2016 | 11/2/2016 | 11/2/2016 | P | PART |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, work in progress
|
BLD-Foundation | 11/1/2016 | 11/1/2016 | 11/1/2016 | A | PART |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, no forms yet.. rebar in place
|
BLD-Footing | 10/31/2016 | 10/31/2016 | 10/31/2016 | P | PART |
Tony Young
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron,, work in progress
|
PubWorks Subgrade Approval | 10/31/2016 | 10/31/2016 | 10/31/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 10/25/2016 | 10/26/2016 | 10/26/2016 | P | NR |
Dave Hannah
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
Issue PAID IN FULL permit | | | 10/12/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/12/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/3/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 9/27/2016 | 9/27/2016 | 10/3/2016 | | DONE |
David Ferguson
|
|
|
due 9/30 - Plan review failed - need WUI canned lights detail
|
Routing - PLAN CHECK | 10/3/2016 | | 10/3/2016 | | PASS |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/3/2016 | | DONE |
|
|
|
MET
|
1st review completed | | | 9/29/2016 | | FAIL |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 9/19/2016 | | 9/29/2016 | | FAIL |
David Ferguson
|
|
|
|
Plan assigned to (LEG) Tisha | 9/19/2016 | | 9/27/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - FIRE | 9/19/2016 | 9/19/2016 | 9/23/2016 | | PASS |
Katie Marron
|
|
|
A NFPA13D Fire Sprinkler System IS REQUIRED. Architect acknowledged.
|
Routing - Erosion and Sediment | 9/19/2016 | | 9/20/2016 | | PASS |
Evan Jenkins
|
|
|
(Site Prep Inspection and Approval Required Prior to Earth Disturbance)
Permit for the construction of a new 2984 sq. ft., two story (first story 1746 sq. ft., second story 1238 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately *** sq. ft. of covered patio/porch and a 938 sq. ft. attached garage
|
Routing PW Grading-Hillside | 9/19/2016 | | 9/19/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - MECHANICAL | 9/19/2016 | | 9/19/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/19/2016 | | 9/19/2016 | | PASS |
Jeff Lowe
|
|
|
pending approval of hillside permit
|
Routing - Addressing | 9/19/2016 | | 9/19/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 9/19/2016 | | 9/19/2016 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/19/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/19/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/19/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/13/2016 | | FAIL |
Christina Prado
|
|
|
Need Structural calcs, stamped foundation & WUI requirements listed
|
Application received | | | 9/6/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 6 2016 10:41AM
|