BLD-Final | 3/21/2017 | 3/21/2017 | 3/21/2017 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 3/21/2017 | 3/21/2017 | 3/21/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 3/20/2017 | 3/21/2017 | 3/21/2017 | A | CANC |
Mike Jordan
|
|
|
would like 30min call ahead; Mike Phone #: ###-#### ***verify that site at 1610 S Lincoln Ave has been stabilized as well***
|
BLD-Footing | 10/20/2016 | 10/20/2016 | 10/20/2016 | P | PASS |
Mike Jordan
|
|
|
Julentino Phone #: ###-####
|
BLD-Footing | 10/19/2016 | 10/19/2016 | 10/19/2016 | P | PASS |
Mike Jordan
|
|
|
Julentio Phone #: ###-####
|
Issue PAID IN FULL permit | | | 9/21/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 9/20/2016 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/20/2016 | | DONE |
|
|
|
|
Telephone call | | | 9/20/2016 | | DONE |
|
|
|
called Mike to let know permit is ready-told him about the bond and how it has to be paid-alsohow much is owed for the building permit
|
Routing - PLANNING | 9/19/2016 | | 9/20/2016 | | PASS |
Jeff Lowe
|
|
|
|
Case Summary (BLD) | | | 9/20/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/20/2016 | | DONE |
Tisha Gallop
|
|
|
as per Tisha-route to front desk
|
Permit Ready to Issue | | | 9/20/2016 | | DONE |
|
|
|
need $10,000.00 bond
|
Plan assigned to (LEG) Tisha | 9/8/2016 | | 9/20/2016 | | DONE |
Tisha Gallop
|
|
|
|
Routing - MECHANICAL | 9/19/2016 | | 9/19/2016 | | PASS |
Chad Schwendiman
|
|
|
|
Plan resubmittals received | | | 9/19/2016 | | DONE |
|
|
|
received (2) sets of revised plot plan & floor plan
|
Routing - PLAN CHECK | 9/19/2016 | | 9/19/2016 | | PASS |
Tisha Gallop
|
|
|
pending approval by planning
|
1st review completed | | | 9/19/2016 | | FAIL |
|
|
|
pending planning approval
|
Routing - MECHANICAL | | | 9/16/2016 | | FAIL |
Troy James
|
|
|
Emailed correction to Osprey Building performance
|
Route to Impact Fee Review | 9/8/2016 | 9/11/2016 | 9/13/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLANNING | 9/9/2016 | | 9/12/2016 | | FAIL |
Jeff Lowe
|
|
|
relocated dwelling as proposed does not meet front seback of 25-feet as required on the Plat. Driveway shall be paved. resubmit with corrections.
|
Routing - Addressing | 9/8/2016 | | 9/9/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 9/8/2016 | | 9/9/2016 | | PASS |
Rachael Beierle
|
|
|
|
Application received | | | 9/8/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 8 2016 1:10PM
|
Plans ACCEPTED BY PLAN TECH | | | 9/8/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/8/2016 | | PASS |
|
|
|
|