Permit Information
Permit NumberBLD16-03347
StatusFinaled
Name KC GARDNER RIVERWOODS LC
Site Address 101 S CAPITOL BLVD Unit: 304
Project NameKestrel West - Suite 304
Customer Number 
ePlanReviewYes
Description
(KESTREL WEST - US BANK BUILDING – 3rd FLOOR – SUITE #304) This building is fire sprinklered because it is a high-rise. Permit is to remodel an existing 1,236 sq. ft. tenant space on the 3rd floor of an existing high-rise building. This permit is approved contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls within the tenant space floor area, removal of select door/door frames, removal of select acoustic suspended ceiling, construction of select interior non-bearing walls to create a conference room, an office, an open office area and a break area, new door/door frames, new interior window opening, new millwork, new sink, new select acoustic ceiling, new gypsum soffit, electrical work, plumbing work and interior finishes in compliance with chapter 8 of the 2012 IBC. This building is fully fire sprinklered any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  1/31/2017 DONE
First Notice 1/9/20171/10/2017 DONE
Mailed 1-11
Permanent Occupancy  12/30/2016 DONE
BLD-Final12/27/201612/28/201612/28/2016APASS
DetailsDave Hannah
Phone #: ###-####
FIRE-Final Inspection12/27/201612/27/201612/27/2016PPASS
DetailsJim Page
No fire sprinkler modifications, fire alarm inspection is complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
BLD-Framing/Rough-in11/14/201611/15/201611/16/2016APART
DetailsDave Hannah
Larrin Phone #: ###-#### ok to cover after elec rouhg in is oked
BLD-Framing/Rough-in11/14/201611/14/201611/14/2016PDEFR
DetailsMike Jordan
Larrin Phone #: ###-####. Out of time.
Issue PAID IN FULL permit  11/14/2016 DONE
Print Occupancy Form  11/14/2016 DONE
Permit Ready to Issue  9/26/2016 DONE
DetailsChristina Prado
***MET 11-8-16 CAN***Need GC Form & Revised Certificate of Value for issuance
Plan assigned to (JG)9/20/20169/20/20169/24/2016 PASS
DetailsJavier Guzman
1st review completed, 9/26 L1 Kestrel West ePlan
Routing - PLAN CHECK9/24/2016 9/24/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  9/24/2016 DONE
Routing - PLAN CHECK9/20/2016 9/22/2016 FAIL
DetailsJavier Guzman
1st review completed  9/22/2016 FAIL
DetailsJavier Guzman
Routing - Addressing9/20/2016 9/20/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS9/20/2016 9/20/2016 PASS
DetailsBeverly Mountain
Intake Approval  9/20/2016 PASS
DetailsJavier Guzman
Application received  9/12/2016 DONE
Application submitted via PDS Online on Sep 12 2016 9:58AM