BLD-Final | 6/5/2017 | 6/6/2017 | 6/6/2017 | A | PASS |
Mike Jordan
|
|
|
Brett Phone #: ###-####
|
DOC - Permit Finaled | 6/6/2017 | 6/6/2017 | 6/6/2017 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | PASS |
Dave Hannah
|
|
|
Brett Phone #: ###-####
|
BLD-Framing/Rough-in | 4/20/2017 | 4/20/2017 | 4/20/2017 | P | FAIL |
Mike Jordan
|
|
|
Brett Phone #: ###-####. Complete lateral bracing on A1, A2 and A2A trusses. Fireblock at header from mud room to living area. Correction notice posted. Ok to insulate.
|
BLD-Framing/Rough-in | 4/19/2017 | 4/20/2017 | 4/20/2017 | A | NR |
Mike Jordan
|
|
|
Brett Phone #: ###-####. Needs to complete airseal pack prior to framing inspection.
|
Routing PW Flood Plain | 4/19/2017 | | 4/19/2017 | | PASS |
Jim Wyllie
|
|
|
Property has been removed from the floodplain as per Letter Of Map Revision (FEMA Case No.: 17-10-0028A.
Okay to schedule a framing inspection.
Jim Wyllie - ###-####
|
BLD-Wall Bracing | 4/5/2017 | 4/6/2017 | 4/6/2017 | A | PASS |
Mike Jordan
|
|
|
Brett Phone #: ###-####
|
Override - Condition Holds | 4/5/2017 | 1/1/1900 | 4/5/2017 | | |
|
|
|
not the framing
|
BLD-Foundation | 3/9/2017 | 3/10/2017 | 3/10/2017 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 3/8/2017 | 3/9/2017 | 3/9/2017 | P | PASS |
Mike Jordan
|
|
|
Dane Phone #: ###-####
|
BLD-Footing | 3/7/2017 | 3/8/2017 | 3/8/2017 | P | CANC |
Mike Jordan
|
|
|
Dane Phone #: ###-####. cancelled by contractor via phone call.
|
Override - Condition Holds | 3/8/2017 | 1/1/1900 | 3/8/2017 | | |
|
|
|
this is before the frame so inspection can be done
|
BLD-Footing | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | NR |
Mike Jordan
|
|
|
dane Phone #: ###-####. Footings not excavated.
|
Override - Condition Holds | 3/7/2017 | 1/1/1900 | 3/7/2017 | | |
|
|
|
just doing footings
|
Override - Condition Holds | 3/6/2017 | 1/1/1900 | 3/6/2017 | | |
|
|
|
good
|
Override - Condition Holds | | | 2/14/2017 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/14/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/14/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 1/10/2017 | | |
|
|
|
|
Plan resubmittals received | | | 1/10/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/10/2017 | | 1/10/2017 | | FAIL |
Tisha Gallop
|
|
|
need full size site plan
|
Plan resubmittals received | | | 1/10/2017 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/10/2017 | | 1/10/2017 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2017 | | DONE |
|
|
|
|
Override - Condition Holds | | | 1/10/2017 | | |
|
|
|
|
Permit Ready to Issue | | | 1/10/2017 | | DONE |
|
|
|
All Met
|
Plan assigned to (LEG) Tisha | 9/13/2016 | | 1/10/2017 | | DONE |
Tisha Gallop
|
|
|
2nd review 1/10 (still need full size site plan); 1st review 9/27; need full size site plan and building section (everything else ok per redlines)
|
Routing - PLAN CHECK | 9/13/2016 | | 9/27/2016 | | FAIL |
Tisha Gallop
|
|
|
need full size site plan and building section
|
1st review completed | | | 9/27/2016 | | FAIL |
|
|
|
|
Routing - MECHANICAL | 9/13/2016 | | 9/19/2016 | | PASS |
Troy James
|
|
|
|
Routing PW Flood Plain | 9/13/2016 | | 9/14/2016 | | PASS |
Jim Wyllie
|
|
|
Elevation Certificate received. Two more Certificates are required;
one in order to receive a framing inspection and one based upon final construction.
Jm W. / ###-####
|
Elevation Cert Rec'd-Prelim | | | 9/14/2016 | | DONE |
Jim Wyllie
|
|
|
per notes from JEW
|
Application received | | | 9/13/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 13 2016 8:52AM
|
Plans ACCEPTED BY PLAN TECH | | | 9/13/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/13/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/13/2016 | | DONE |
|
|
|
|
Routing - PLANNING | 9/13/2016 | | 9/13/2016 | | PASS |
Nicolette Womack
|
|
|
|
Routing - Addressing | 9/13/2016 | | 9/13/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 9/13/2016 | | 9/13/2016 | | PASS |
Rachael Beierle
|
|
|
|