Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-03384
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2999 S MILLBROOK WAY
Project Name5-52 HR
Customer Number 
ePlanReviewYes
Description
WUI Valley, Exterior Lot, Harris Ranch HOA letter to provide 100' defensible space to make for Zone "B" requirements. Class "A" roof required. LOMR has been issued for this Lot. Permit for the construction of a new 2976 sq. ft., two story (first story 1811 sq. ft., second story 1165 sq. ft.) single family dwelling with 5 bedrooms, 3.5 bathrooms, approximately 163 sq. ft. of covered patio/porch and a 758 sq. ft. attached garage per the approved plans, plan review report and any notations. SP-01 zoning and setbacks per planning. Prescriptive energy code is proposed. **BJM**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/23/20172/24/20172/24/2017PPASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Weston Wagner
DOC - Permit Finaled2/24/20172/24/20172/24/2017PPASS
DetailsJim Sly
BLD-Final2/23/20172/23/20172/23/2017PNR
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Weston Wagner
Need F/P final.
BLD-Final2/23/20172/24/20172/23/2017ACANC
DetailsPhil Shearer
Phone #: ###-#### >> Inspection requested via web by Weston Wagner Inspection cancelled from web by: Weston Wagner
BLD-Energy code compliance12/15/201612/16/201612/16/2016APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Weston Wagner
BLD-Framing/Rough-in12/14/201612/15/201612/15/2016APART
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Weston Wagner. Missing hanger and pointload support in front room
BLD-Wall Bracing11/29/201611/29/201611/29/2016PPASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Weston Wagner
BLD-Wall Bracing11/28/201611/29/201611/29/2016AFAIL
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Weston Wagner. Missing hold downs
BLD-Foundation10/28/201610/31/201610/31/2016APASS
DetailsPhil Shearer
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Foundation10/28/201610/28/201610/28/2016PPASS
DetailsPhil Shearer
BLD-Footing10/27/201610/27/201610/27/2016APASS
DetailsPhil Shearer
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
BLD-Conference10/27/201610/27/201610/27/2016ACANC
DetailsPhil Shearer
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Thursday, October 27, 2016.
Issue PAID IN FULL permit  10/17/2016 DONE
Inspection Record Card- Bld  10/17/2016 DONE
OVERRIDE  10/13/2016  
Permit Ready to Issue  10/13/2016 DONE
DetailsChristina Prado
All requirements met
Plan assigned to (BJM)9/16/20169/16/201610/12/2016 DONE
DetailsBrian McGowan
Due 9-27 - ePlan - FAIL - Upper floor had no notations
PLANS/APPL TAKEN TO FRONT DESK  10/12/2016 DONE
DetailsBrian McGowan
Routing - PLAN CHECK9/14/2016 10/12/2016 PASS
DetailsBrian McGowan
1st review completed  9/28/2016 FAIL
DetailsBrian McGowan
Routing - MECHANICAL9/14/2016 9/19/2016 PASS
DetailsTroy James
Plan assigned to (LEG) Tisha9/14/2016 9/16/2016 DEFR
DetailsTisha Gallop
Routing - PUBLIC WORKS9/14/2016 9/15/2016 PASS
DetailsRachael Beierle
Application received  9/14/2016 DONE
Application submitted via PDS Online on Sep 14 2016 9:14AM
Plans ACCEPTED BY PLAN TECH  9/14/2016 DONE
Intake Approval  9/14/2016 PASS
Recd Pcfee & Taken To Pln CK  9/14/2016 DONE
Routing - PLANNING9/14/2016 9/14/2016 PASS
DetailsNicolette Womack
Routing - Addressing9/14/2016 9/14/2016 PASS
DetailsLaura Hunter