Print Statement | | | 3/14/2017 | | DONE |
|
|
|
|
Second Notice | | 3/3/2017 | 3/9/2017 | | DONE |
|
|
|
|
First Notice | 1/27/2017 | 1/27/2017 | 2/21/2017 | | DONE |
Dave Hannah
|
|
|
Mailed 2-22-17
|
BLD-Final | 1/26/2017 | 1/27/2017 | 1/27/2017 | A | PASS |
Dave Hannah
|
|
|
Rita Phone #: ###-####
|
DOC - Permit Finaled | 1/27/2017 | 1/27/2017 | 1/27/2017 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | PASS |
Dave Hannah
|
|
|
Adam Phone #: ###-####
|
BLD-Footing | 11/14/2016 | 11/14/2016 | 11/14/2016 | P | PASS |
Jim Sly
|
|
|
adam Phone #: ###-####
|
Issue PAID IN FULL permit | | | 11/14/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 10/18/2016 | | |
|
|
|
|
Plan assigned to (JG) | 9/20/2016 | 9/20/2016 | 10/18/2016 | | PASS |
Javier Guzman
|
|
|
1st review completed, 10/17 L3 The Sturiale Place ePlan
|
Routing Off Site - STRUCTURAL | 10/13/2016 | | 10/18/2016 | | PASS |
Javier Guzman
|
|
|
signed off in ePlan Keith Jones AHJ Engineer
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/18/2016 | | DONE |
|
|
|
Need RP, GC Form and Revised Cert of Value
|
Route to Impact Fee Review | 10/12/2016 | 10/15/2016 | 10/13/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 10/13/2016 | | 10/13/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 9/20/2016 | | 10/12/2016 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by AHJ Engineers Keith Jones
|
Routing - Design Review | 10/12/2016 | | 10/12/2016 | | PASS |
Josh Wilson
|
|
|
signed off in ePlan by DR Josh Wilson
|
1st review completed | | | 10/12/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - PLAN CHECK | 9/20/2016 | | 10/12/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing - FIRE | 9/20/2016 | 9/20/2016 | 9/21/2016 | | PASS |
Katie Marron
|
|
|
**DO NOT FINAL UNTIL BLD15-04326 IS FINALED** Under orginal TIE permit an Exit sign is indicated over the door to the proposed deck, this sign shall be removed as no stairs are provided from deck. Cafe has three remaining exits.
|
Routing - PLANNING | 9/20/2016 | | 9/21/2016 | | PASS |
Josh Wilson
|
|
|
Ok per DRH16-00334
|
Routing - Erosion and Sediment | 9/20/2016 | | 9/21/2016 | | PASS |
Evan Jenkins
|
|
|
Applicant wishes to add a seasonal overhead open wood pergola trellis structure and wood deck to the area previously indicated on approved plans as an elevated paver patio with low stone screen walls. Deck & pergola structure would be located in the same area as previously proposed on the northwest corner of the property adjacent to the cafe seating area.
|
Routing - PLANNING Land Div | 9/20/2016 | | 9/21/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - PUBLIC WORKS | 9/20/2016 | | 9/21/2016 | | PASS |
Rachael Beierle
|
|
|
Jim Wyllie okayed change to deck. No review needed. BAM
|
Routing - Addressing | 9/20/2016 | | 9/20/2016 | | PASS |
Laura Hunter
|
|
|
|
Intake Approval | | | 9/20/2016 | | PASS |
|
|
|
|
Application received | | | 9/14/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 14 2016 10:28AM
|
Intake Approval | | | 9/14/2016 | | FAIL |
|
|
|
Pre-screen #1 9-14-16 Carl Madsen ###-####
Please provide a ESC plan or a ESC waiver letter.
|