BLD-Final | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | PASS |
Jim Sly
|
|
|
would like call ahead; Joe Phone #: ###-####
|
DOC - Permit Finaled | 1/18/2017 | 1/18/2017 | 1/18/2017 | P | PASS |
Jim Sly
|
|
|
|
BLD-Footing | 10/21/2016 | 10/21/2016 | 10/21/2016 | P | PASS |
Jim Sly
|
|
|
Joe Phone #: ###-####
|
OVERRIDE | | | 9/30/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 9/30/2016 | 9/30/2016 | 9/30/2016 | A | PASS |
Nicolette Womack
|
|
|
|
Routing Walk-In (BLD) | 9/30/2016 | 9/30/2016 | 9/30/2016 | A | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 9/30/2016 | | 9/30/2016 | | DONE |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/30/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/30/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 9/30/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/30/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 9/14/2016 | 9/14/2016 | 9/14/2016 | A | FAIL |
David Moser
|
|
|
needs ZC approval for pole barn over a 1,000 sq ft in size
|
Routing Walk-In (BLD) | 9/14/2016 | 9/14/2016 | 9/14/2016 | A | FAIL |
Tisha Gallop
|
|
|
fully engineeered metal pole structure, has engineering and calcs. needs zoning approval.
|
1st review completed | | | 9/14/2016 | | FAIL |
|
|
|
|
Application received | | 9/14/2016 | | | |
|
|
|
|