BLD-Final | 5/9/2017 | 5/10/2017 | 5/10/2017 | A | PASS |
Tony Young
|
|
|
Phone #: ###-####
|
DOC - Permit Finaled | 5/10/2017 | 5/10/2017 | 5/10/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/14/2017 | 4/14/2017 | 4/19/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/13/2017 | 4/13/2017 | 4/19/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 11/29/2016 | 11/30/2016 | 11/30/2016 | A | PASS |
Phil Shearer
|
|
|
Larry Phone #: ###-####
|
BLD-Framing/Rough-in | 11/23/2016 | 11/25/2016 | 11/25/2016 | A | PART |
Phil Shearer
|
|
|
would like call ahead; larry Phone #: ###-####. Point load support for beam at the bottom of the stairs, Air seal, Straps for the potal frame. OK to insulate
|
BLD-Other | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | PASS |
Tony Young
|
|
|
Larry Phone #: ###-####,, WUI soffit
|
BLD-Wall Bracing | 11/14/2016 | 11/15/2016 | 11/15/2016 | A | PART |
Tony Young
|
|
|
Larry Phone #: ###-####,, work in progtress,, ok so far,, needs more blocking at panel edges,, ok to cover exterior when done
|
BLD-Footing | 10/11/2016 | 10/12/2016 | 10/12/2016 | A | PASS |
Tony Young
|
|
|
Larry-pour time 2:00 Phone #: ###-####,, footing and foundation ok now
|
BLD-Foundation | 10/10/2016 | 10/11/2016 | 10/11/2016 | A | FAIL |
Tony Young
|
|
|
Larry-pour time 2:00 Phone #: ###-####,, c/n posted,, need soils approval
|
PubWorks Subgrade Approval | 10/11/2016 | 10/11/2016 | 10/11/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
BLD-Footing | 10/5/2016 | 10/6/2016 | 10/6/2016 | A | FAIL |
Phil Shearer
|
|
|
Larry// pour time 1030 Phone #: ###-####. No subgrade inspection or footing inspection before placing concrete
|
OVERRIDE | | | 10/5/2016 | | |
|
|
|
|
Plan assigned to (BJM) | 9/19/2016 | 9/19/2016 | 10/5/2016 | | DONE |
Brian McGowan
|
|
|
|
Telephone call | | | 10/5/2016 | | DONE |
|
|
|
called Larry to let know permit is ready and how much is owed-left message on phone
|
Issue PAID IN FULL permit | | | 10/5/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/19/2016 | | 10/5/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/5/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/5/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/5/2016 | | DONE |
|
|
|
need RP
|
Routing - Erosion and Sediment | 10/3/2016 | | 10/3/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver approved. ESC site prep required, call ###-####. RP to be determined.
|
Plan resubmittals received | | | 9/27/2016 | | DONE |
|
|
|
Two copies of sheet A3.0 and Page state typical foundation. Brian MC
|
Routing PW Grading-Hillside | 9/19/2016 | | 9/19/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (Zoning) | 9/15/2016 | 9/15/2016 | 9/15/2016 | A | PASS |
Jeff Lowe
|
|
|
|
Routing Walk-In (BLD) | 9/15/2016 | 9/15/2016 | 9/15/2016 | A | FAIL |
Brian McGowan
|
|
|
Addition is in Hillside. Need stamped, engineered foundation plan
Will consult with Jasion Taylor
|
1st review completed | | | 9/15/2016 | | DONE |
Brian McGowan
|
|
|
|
Application received | | 9/15/2016 | | | |
|
|
|
|
Routing - Erosion and Sediment | 9/28/2016 | | | | FAIL |
Andy J. Long
|
|
|
Walk in application, ESC inquiry. ESC permit is required. Please submit Erosion Sediment Control (ESC) Plan or ESC Plan Waiver letter. Project should have certified or homeowner RP. Notified plan reviewer.
|