BLD-Final | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
DOC - Permit Finaled | 7/20/2017 | 7/20/2017 | 7/20/2017 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Conference | 6/5/2017 | 6/5/2017 | 6/5/2017 | A | PASS |
Brandon Shaw
|
|
|
check drywall shear walls Phone #: ###-#### Inspection requested via web by joey benart
|
BLD-Energy code compliance | 5/25/2017 | 5/25/2017 | 5/25/2017 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
BLD-Framing/Rough-in | 5/24/2017 | 5/24/2017 | 5/24/2017 | P | PART |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart Pending- mech rough not approved, pressure test gas lines. OK to insulate after mech pressure test approved
|
BLD-Wall Bracing | 5/2/2017 | 5/2/2017 | 5/2/2017 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by joey benart
|
CHANGE STATUS TO (ISS) | | | 2/21/2017 | | DONE |
|
|
|
Not showing a plan mod was turned in
|
BLD-Foundation | 2/7/2017 | 2/7/2017 | 2/7/2017 | P | PASS |
Dave Hannah
|
|
|
As early as possible Phone #: 2089656103 >> Inspection requested via mobile web by Alvaro
|
BLD-Footing | 1/30/2017 | 1/31/2017 | 1/31/2017 | P | PART |
Dave Hannah
|
|
|
Call for access Phone #: 2088818697 >> Inspection requested via mobile web by Dallin Ragan set backs ok most of the rebar is in crew will cover for three days
|
Issue PAID IN FULL permit | | | 1/11/2017 | | DONE |
|
|
|
|
Telephone call | | | 10/12/2016 | | DONE |
|
|
|
called Leonard to let know permit is ready and how much is owed-left message on phone
|
Plan assigned to (BJM) | 9/16/2016 | 9/16/2016 | 10/11/2016 | | DONE |
Brian McGowan
|
|
|
Due 10-4 Level 2 - (4) permits - Fail - Verify strap call out "A" on Pg 8.1 btn L6 and L7. Verify (1) hour rated wall at Gar btn L5 and L6, btn L7 and L8 (see Detail 2/7.2
|
Case Summary (BLD) | | | 10/11/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/11/2016 | | |
|
|
|
all requirements met
|
Inspection Record Card- Bld | | | 10/11/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/21/2016 | | 10/11/2016 | | PASS |
Brian McGowan
|
|
|
|
Plan resubmittals received | | | 10/10/2016 | | DONE |
|
|
|
received two copies of sheets 2.0, 4.0, 7.2, 8.0, and 8.1- gave to Brian
|
1st review completed | | | 10/4/2016 | | FAIL |
|
|
|
Verify strap call out "A" on Pg 8.1 btn L6 and L7. Verify (1) hour rated wall at Gar btn L5 and L6, btn L7 and L8 (see Detail 2/7.2
|
Routing - PLAN CHECK | 10/4/2016 | | 10/4/2016 | | FAIL |
Brian McGowan
|
|
|
|
Routing - PLANNING | 9/15/2016 | | 9/21/2016 | | PASS |
Josh Wilson
|
|
|
|
Routing - MECHANICAL | 9/21/2016 | | 9/21/2016 | | PASS |
Troy James
|
|
|
|
Plan assigned to (LEG) Tisha | 9/15/2016 | | 9/16/2016 | | DEFR |
Tisha Gallop
|
|
|
|
Routing - Addressing | 9/15/2016 | | 9/15/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 9/15/2016 | | 9/15/2016 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/15/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/15/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/15/2016 | | DONE |
|
|
|
|
Application received | | 9/15/2016 | | | |
|
|
|
|