Print Statement | | | 3/28/2018 | | DONE |
|
|
|
|
Second Notice | | 2/22/2018 | 3/14/2018 | | DONE |
|
|
|
Mailed 3-15-18
Spoke with J.W. Resent notice to Iron Horse 3-29-18
|
First Notice | | 1/22/2018 | 2/12/2018 | | DONE |
|
|
|
Mailed 2-13-18
|
Permanent Occupancy | | | 1/12/2018 | | DONE |
|
|
|
|
BLD-Final | 1/11/2018 | 1/11/2018 | 1/11/2018 | P | PASS |
Jim Storey
|
|
|
Justin Phone #: ###-####
|
FIRE-Final Inspection | 1/10/2018 | 1/11/2018 | 1/11/2018 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Missing gate on west side of building approved by scott.
justin Phone #: ###-####
|
BLD-Final | 12/27/2017 | 12/28/2017 | 12/28/2017 | A | NR |
Jim Sly
|
|
|
Justin Phone #: ###-#### Need Fire final.
|
FIRE-Final Inspection | 12/27/2017 | 12/27/2017 | 12/27/2017 | P | FAIL |
Troy Cobbley
|
|
|
Missing the small documents, provide annual inspection for the fire extinguishers, add exit sign per the approved plans, possible need for Opticon system for the yard gate at the west side of property along Broadway, provide hardware for the doors, provide address
Justin Phone #: ###-####
|
Zoning Approval | 12/27/2017 | 12/27/2017 | 12/27/2017 | | PASS |
Katelyn Menuge
|
|
|
Design Review Pass
|
PubWorks Occupancy Approval | 12/26/2017 | 12/26/2017 | 12/26/2017 | | DONE |
Tiffany Lowery
|
|
|
|
BLD-Framing/Rough-in | 10/20/2017 | 10/23/2017 | 10/23/2017 | A | PASS |
Jim Storey
|
|
|
Frank Phone #: ###-#### exterior ok to cover
|
BLD-Footing | 8/15/2017 | 8/16/2017 | 8/16/2017 | A | PASS |
Jim Storey
|
|
|
Rebar - Lucas Phone #: ###-#### office pad ft and misc wall s ok
|
BLD-Foundation | 8/7/2017 | 8/8/2017 | 8/8/2017 | P | PASS |
Jim Storey
|
|
|
Lucas Phone #: ###-####
|
BLD-Foundation | 8/4/2017 | 8/7/2017 | 8/7/2017 | A | PASS |
Jim Storey
|
|
|
Lucas Phone #: ###-####
|
BLD-Foundation | 8/2/2017 | 8/3/2017 | 8/3/2017 | P | PASS |
Jim Storey
|
|
|
Lucas Phone #: ###-#### ft exteror office
|
BLD-Footing | 8/1/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Jim Storey
|
|
|
Lucas Phone #: ###-#### main bldg rebar ok ufer noted on plan 30 ft
|
CHANGE STATUS TO (ISS) | | | 7/26/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 7/26/2017 | | DONE |
|
|
|
|
Routing - FIRE | 7/22/2017 | 7/22/2017 | 7/25/2017 | | PASS |
Scott Arellano
|
|
|
Attached revised comments to case and plans.
|
Plan assigned to (JG) | 7/12/2017 | 7/12/2017 | 7/25/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, Plan mod, Iron Horse Excavation, LLC ePlan pend Fire/PW/DR
|
Permit Ready to Issue | | | 7/25/2017 | | DONE |
|
|
|
PLAN MOD DO NOT RE ISSUE
|
Routing - Design Review | 7/22/2017 | | 7/24/2017 | | PASS |
Katelyn Menuge
|
|
|
DRH17-00242
|
Routing PW Sewer Design | 7/22/2017 | | 7/24/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
Routing - PLAN CHECK | 7/22/2017 | | 7/22/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Sewer Design | 7/13/2017 | | 7/19/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
2" Gate valve should be labeled as a check valve.Install 4" sewer force main with gasketed PVC C-900 pipe. Install 2" pressure sewer service within Public Works easement with schedule 40 solvent weld pvc pipe.
|
Telephone call | | | 7/19/2017 | | DONE |
Scott Arellano
|
|
|
Spoke with Christina Nemec (Civil ENG) regarding revised FD access roadway plan. Christina will be delivering new drawing to RDP for upload into e-plan review.
|
Routing PW Drainage | 7/13/2017 | | 7/15/2017 | | PASS |
Brian Murphy
|
|
|
No review required as stated in ePlan by Drainage Brian Murphy
|
Routing - Erosion and Sediment | 7/13/2017 | | 7/15/2017 | | PASS |
Melissa Jannusch
|
|
|
No review required as stated in ePlan by Erosion Melissa Jannusch
|
Routing - PLAN CHECK | 7/13/2017 | | 7/15/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - PLUMBING | 7/13/2017 | | 7/14/2017 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Telephone call | | | 7/14/2017 | | DONE |
|
|
|
Ryan emailed me some drawings that needed uploaded for the plan mod-i emailed them to JG since the reviews were already started
|
Routing PW Solid Waste | 7/13/2017 | | 7/14/2017 | | PASS |
Evan Carpenter
|
|
|
|
Routing - FIRE | 7/13/2017 | 7/13/2017 | 7/13/2017 | | FAIL |
Katie Marron
|
|
|
Modifications to building/site layour affect previously approved FD Access. Resubmittals are required.
|
Routing PW Environmental | 7/13/2017 | | 7/13/2017 | | PASS |
Terry Alber
|
|
|
|
Routing - Design Review | 7/13/2017 | | 7/13/2017 | | FAIL |
Katelyn Menuge
|
|
|
See Landscape Plan
|
Routing - Addressing | 7/13/2017 | | 7/13/2017 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 7/13/2017 | | 7/13/2017 | | PASS |
Rachael Beierle
|
|
|
|
Plan Modification Accepted | | | 7/12/2017 | | DONE |
|
|
|
plan mod accepted in e plan review-they are going to rotate and reloacate building on site
|
Routing - Addressing | 6/30/2017 | | 6/30/2017 | | PASS |
Laura Hunter
|
|
|
Customer called notifying me of new orientation and location of building on parcel. I changed the address to 875 W Gowen Rd accordingly
|
Meeting | | | 3/14/2017 | | DONE |
|
|
|
parcel owner has taken over the project - see attached 302 Form
|
Issue PAID IN FULL permit | | | 3/13/2017 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/13/2017 | | DONE |
|
|
|
|
Telephone call | | | 3/6/2017 | | DONE |
|
|
|
Left a message with Jacqi informing her that this permit is going to expire in 9 days and are allowed to send in a request for an extension
|
Expiration Notice | 2/22/2017 | 3/15/2017 | 2/22/2017 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (JG) | 11/20/2016 | 11/20/2016 | 2/9/2017 | | PASS |
Javier Guzman
|
|
|
1st rev comp, 12/15 Iron Horse Excavation, LLC pend PW sewer design
|
Routing - PLAN CHECK | 2/8/2017 | | 2/9/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing PW Sewer Design | 2/8/2017 | | 2/9/2017 | | PASS |
Kyle S. Rosenmeyer
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/9/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/9/2017 | | DONE |
|
|
|
***all requirments met 3-1-17 /CEV
NEED RP, ACHD, GC form and certificate of value
|
Routing PW Sewer Design | 1/11/2017 | | 1/17/2017 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Failed in ePlan by Sewer Design Kyle Rosenmeyer
|
Routing - PLAN CHECK | 1/11/2017 | | 1/13/2017 | | PASS |
Javier Guzman
|
|
|
|
Routing - FIRE | 1/11/2017 | 1/11/2017 | 1/12/2017 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing PW Sewer Design | 12/19/2016 | | 12/29/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Same comments outstanding.
|
Routing - PLAN CHECK | 12/19/2016 | | 12/23/2016 | | PASS |
Javier Guzman
|
|
|
|
Routing Off Site - STRUCTURAL | 12/19/2016 | | 12/23/2016 | | PASS |
Javier Guzman
|
|
|
sogne off in ePlan by KPFF engineering Cory Harelson
|
Routing - FIRE | 12/19/2016 | 12/19/2016 | 12/21/2016 | | FAIL |
Katie Marron
|
|
|
Fire hydrants not addressed appropriately. Revised report attached to case and emailed to architect.
|
Routing - PUBLIC WORKS | 12/21/2016 | | 12/21/2016 | | PASS |
Rachael Beierle
|
|
|
added two fuel tanks at rear of bld
|
Routing PW Environmental | 12/21/2016 | | 12/21/2016 | | PASS |
Rick Christenson
|
|
|
|
Routing - MECHANICAL | 12/19/2016 | | 12/21/2016 | | PASS |
Troy James
|
|
|
|
Route to Impact Fee Review | 12/13/2016 | 12/16/2016 | 12/15/2016 | | PASS |
Cindy M. Gould
|
|
|
|
Routing - PLAN CHECK | 11/20/2016 | | 12/13/2016 | | FAIL |
Javier Guzman
|
|
|
|
1st review completed | | | 12/13/2016 | | FAIL |
Javier Guzman
|
|
|
|
Routing PW Sewer Design | 11/21/2016 | | 12/12/2016 | | FAIL |
Kyle S. Rosenmeyer
|
|
|
Communicating with engineer on adjustments to the 4" public force main. - Kyle
|
Routing Off Site - STRUCTURAL | 11/20/2016 | | 12/9/2016 | | FAIL |
Javier Guzman
|
|
|
Failed in ePlan by KPFF engineering Cory Harelson
|
Routing PW Drainage | 11/21/2016 | | 12/6/2016 | | PASS |
Brian Murphy
|
|
|
|
Meeting | | | 12/5/2016 | | DONE |
|
|
|
Appendix J taken to Brian Murphy
|
Routing - PLANNING Land Div | 11/20/2016 | | 11/30/2016 | | PASS |
Todd Tucker
|
|
|
|
Routing - PLUMBING | 11/20/2016 | | 11/23/2016 | | PASS |
Bill VanDegrift
|
|
|
The STEP system and presure sewer are to be reviewed and approved by IDEQ.
|
Routing - Design Review | 11/20/2016 | | 11/22/2016 | | PASS |
Josh Wilson
|
|
|
OK per DRH16-00136.
|
Routing - Erosion and Sediment | 11/20/2016 | | 11/22/2016 | | CANC |
Andy J. Long
|
|
|
No ESC review required. ESC permit and SWPPP review already issued with GRD permit. SWPPP resubmitted. See ESC16-00982
|
Routing - FIRE | 11/20/2016 | 11/20/2016 | 11/21/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Routing - Addressing | 11/20/2016 | | 11/21/2016 | | PASS |
Laura Hunter
|
|
|
Changed address to 6098 S Broadway Ave
|
Routing - PUBLIC WORKS | 11/20/2016 | | 11/21/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing PW Solid Waste | 11/21/2016 | | 11/21/2016 | | PASS |
Evan Carpenter
|
|
|
Solid waste is OK as planned.
|
Routing PW Environmental | 11/21/2016 | | 11/21/2016 | | PASS |
Rick Christenson
|
|
|
Flammable Liquids Interceptor Shown
|
Routing - PLANNING | 11/20/2016 | | 11/21/2016 | | PASS |
Cody Riddle
|
|
|
No review required. Approved by DRH16-00136.
|
Routing - MECHANICAL | 11/20/2016 | | 11/21/2016 | | FAIL |
Troy James
|
|
|
|
Intake Approval | | | 11/20/2016 | | PASS |
|
|
|
|
Intake Approval | | | 11/17/2016 | | FAIL |
Javier Guzman
|
|
|
Applications with incomplete submittals must upload additional documents. Incomplete submittals will not be accepted. Please provide the following:
1. the form 310 cover sheet was only uploaded please provide the remaining (9) sheets filled out
2. ESC plans sheet EC-101 must be signed by a plan designer certified by Boise City.
3. Mechanical compliance COMcheck signed & printed sheet M0.1 is blank please try to re-upload so that the sheet may be visible from our end
4. Power plan sheet E4 was not uploaded, please upload sheet E4
|
Application received | | | 9/15/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 15 2016 3:28PM
|
Routing - PLUMBING | 1/13/2017 | | 1/13/2016 | | PASS |
Bill VanDegrift
|
|
|
review and approval of the septic tank and pressure sewer are the jurisdiction
of Idaho Department of Environmental Quality
|