Third Notice | | 6/17/2017 | 6/27/2017 | | DONE |
|
|
|
This permit finaled on the web by Caloub Huttash
|
Second Notice | | 5/20/2017 | 6/12/2017 | | DONE |
|
|
|
Mailed 6-13-17
|
First Notice | | 5/8/2017 | 5/10/2017 | | DONE |
|
|
|
Mailed 5-11
|
BLD-Final | 4/27/2017 | 4/28/2017 | 4/28/2017 | A | PASS |
Dave Hannah
|
|
|
Curt Phone #: ###-#### ok for perm occ
|
Print Occupancy Form | | | 4/28/2017 | | DONE |
|
|
|
|
Permanent Occupancy | | | 4/28/2017 | | DONE |
|
|
|
|
BLD-Final | 4/20/2017 | 4/21/2017 | 4/21/2017 | P | PART |
Dave Hannah
|
|
|
Curt Phone #: ###-#### ok for temp needs to fix some door hardware
|
FIRE-Final Inspection | 4/20/2017 | 4/21/2017 | 4/21/2017 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place, final life fire safety inspection passed/complete.
|
BLD-Ceiling Grid Inspection | 3/23/2017 | 3/24/2017 | 3/27/2017 | P | PASS |
Dave Hannah
|
|
|
Curt Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 2/23/2017 | 2/24/2017 | 2/24/2017 | A | PART |
Dave Hannah
|
|
|
Earlier the better - Curt Phone #: ###-#### second floor grid ok needs to add some counter wires
|
BLD-Framing/Rough-in | 1/26/2017 | 1/26/2017 | 1/26/2017 | P | PASS |
Jim Sly
|
|
|
Kurt Phone #: ###-#### Framing at Main floor and 2nd floor restroom and breakroom.......OK.
|
Issue PAID IN FULL permit | | | 12/30/2016 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/30/2016 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/29/2016 | 9/29/2016 | 10/24/2016 | | PASS |
Carl Westfall
|
|
|
(2nd done) (Oct 19 - 15 days) Umpqua Bank
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/24/2016 | | DONE |
|
|
|
***all requirments met 12-16-16 /CEV
Need GC Form and Revised Cert of Value
|
Plan resubmittals received | | | 10/21/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/21/2016 | | 10/21/2016 | | PASS |
Carl Westfall
|
|
|
Drawings approved with redlines
|
Routing - FIRE | 10/21/2016 | | 10/21/2016 | | PASS |
Katie Marron
|
|
|
Revised report attached to case.
|
Routing PW Sewer Rating | 10/21/2016 | | 10/21/2016 | | PASS |
Rachael Beierle
|
|
|
A sink is being added on the 2nd story within the Women's restroom and the 1st story drinking fountain will be high and low.
|
Route to Impact Fee Review | 10/14/2016 | 10/17/2016 | 10/14/2016 | | PASS |
Cindy M. Gould
|
|
|
|
1st review completed | | | 10/14/2016 | | DONE |
|
|
|
|
Plan resubmittals requested | | | 10/14/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/29/2016 | | 10/14/2016 | | FAIL |
Carl Westfall
|
|
|
Revised drawings required. See the plan review report.
|
Routing - PLUMBING | 9/29/2016 | | 10/6/2016 | | PASS |
Bill VanDegrift
|
|
|
per plans and ISPC
|
Routing - FIRE | 9/29/2016 | 9/29/2016 | 9/30/2016 | | FAIL |
Katie Marron
|
|
|
Report attached to case and emailed to architect.
|
Intake Approval | | | 9/29/2016 | | PASS |
Adele J Schaffeld-Griffin
|
|
|
Javier approved pre screen
|
Routing - Addressing | 9/29/2016 | | 9/29/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 9/29/2016 | | 9/29/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - MECHANICAL | 9/29/2016 | | 9/29/2016 | | PASS |
Troy James
|
|
|
|
Intake Approval | | | 9/21/2016 | | FAIL |
Javier Guzman
|
|
|
Please provide the following documents and upload in ePlan, Incomplete submittals will not be accepted:
• Checklist must be completed by the project’s Idaho-licensed design professional of record and uploaded
• The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed.
• Please upload any additional documents requested from the checklist
• Checklist can be found at our website at http://pds.cityofboise.org/home/documents/apps/500/
|
Application received | | | 9/16/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 16 2016 8:39AM
|