Permit Information
Permit NumberBLD16-03422
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 280 S CAPITOL BLVD
Project NameUmpqua Bank
Customer Number 
ePlanReviewYes
Description
(UMPQUA BANK – 1ST AND 2ND STORIES) The fire sprinkler system is used to allow non-rated corridors, to allow no exterior wall openings for the basement, and for story increase. To remodel the 4,808 square foot interior area on the 7,600 square foot 1st story and to remodel a 6,050 square feet area on the 7,600 square foot 2nd story for a new bank tenant. Selective nonstructural interior demolition is also covered under this permit. Work is to include 2 restrooms accessible to the disabled on the 1st story, upgrades to the 2nd story restrooms to make them accessible to the disabled, upgrading the entry vestibules on the 1st story to make them accessible to the disabled, interior doors, interior windows, interior nonstructural infill walls, interior nonstructural walls, suspended acoustical ceilings, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 6/17/20176/27/2017 DONE
This permit finaled on the web by Caloub Huttash
Second Notice 5/20/20176/12/2017 DONE
Mailed 6-13-17
First Notice 5/8/20175/10/2017 DONE
Mailed 5-11
BLD-Final4/27/20174/28/20174/28/2017APASS
DetailsDave Hannah
Curt Phone #: ###-#### ok for perm occ
Print Occupancy Form  4/28/2017 DONE
Permanent Occupancy  4/28/2017 DONE
BLD-Final4/20/20174/21/20174/21/2017PPART
DetailsDave Hannah
Curt Phone #: ###-#### ok for temp needs to fix some door hardware
FIRE-Final Inspection4/20/20174/21/20174/21/2017APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are in place with current inspection tags, knox box is in place, final life fire safety inspection passed/complete.
BLD-Ceiling Grid Inspection3/23/20173/24/20173/27/2017PPASS
DetailsDave Hannah
Curt Phone #: ###-####
BLD-Ceiling Grid Inspection2/23/20172/24/20172/24/2017APART
DetailsDave Hannah
Earlier the better - Curt Phone #: ###-#### second floor grid ok needs to add some counter wires
BLD-Framing/Rough-in1/26/20171/26/20171/26/2017PPASS
DetailsJim Sly
Kurt Phone #: ###-####
Framing at Main floor and 2nd floor restroom and breakroom.......OK.
Issue PAID IN FULL permit  12/30/2016 DONE
Print Occupancy Form  12/30/2016 DONE
Plan assigned to (CJW)9/29/20169/29/201610/24/2016 PASS
DetailsCarl Westfall
(2nd done) (Oct 19 - 15 days) Umpqua Bank
PLANS/APPL TAKEN TO FRONT DESK  10/24/2016 DONE
Permit Ready to Issue  10/24/2016 DONE
***all requirments met 12-16-16 /CEV

Need GC Form and Revised Cert of Value
Plan resubmittals received  10/21/2016 DONE
Routing - PLAN CHECK10/21/2016 10/21/2016 PASS
DetailsCarl Westfall
Drawings approved with redlines
Routing - FIRE10/21/2016 10/21/2016 PASS
DetailsKatie Marron
Revised report attached to case.
Routing PW Sewer Rating10/21/2016 10/21/2016 PASS
DetailsRachael Beierle
A sink is being added on the 2nd story within the Women's restroom and the 1st story drinking fountain will be high and low.
Route to Impact Fee Review10/14/201610/17/201610/14/2016 PASS
DetailsCindy M. Gould
1st review completed  10/14/2016 DONE
Plan resubmittals requested  10/14/2016 DONE
Routing - PLAN CHECK9/29/2016 10/14/2016 FAIL
DetailsCarl Westfall
Revised drawings required. See the plan review report.
Routing - PLUMBING9/29/2016 10/6/2016 PASS
DetailsBill VanDegrift
per plans and ISPC
Routing - FIRE9/29/20169/29/20169/30/2016 FAIL
DetailsKatie Marron
Report attached to case and emailed to architect.
Intake Approval  9/29/2016 PASS
DetailsAdele J Schaffeld-Griffin
Javier approved pre screen
Routing - Addressing9/29/2016 9/29/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS9/29/2016 9/29/2016 PASS
DetailsRachael Beierle
Routing - MECHANICAL9/29/2016 9/29/2016 PASS
DetailsTroy James
Intake Approval  9/21/2016 FAIL
DetailsJavier Guzman
Please provide the following documents and upload in ePlan, Incomplete submittals will not be accepted:
• Checklist must be completed by the project’s Idaho-licensed design professional of record and uploaded
• The checklist is not complete unless all information is filled out, all appropriate boxes are checked and all plan page numbers are listed.
• Please upload any additional documents requested from the checklist
• Checklist can be found at our website at http://pds.cityofboise.org/home/documents/apps/500/
Application received  9/16/2016 DONE
Application submitted via PDS Online on Sep 16 2016 8:39AM