BLD-Final | 4/4/2017 | 4/4/2017 | 4/4/2017 | A | PEND |
Jim Sly
|
|
|
WIP
|
BLD-Framing/Rough-in | 11/16/2016 | 11/17/2016 | 11/17/2016 | P | PASS |
Jim Sly
|
|
|
Mike Phone #: ###-####// please call ahead
|
BLD-Conference | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | DONE |
Jim Sly
|
|
|
Call half hour before to meet // Mike Phone #: ###-####
|
BLD-Conference | 10/5/2016 | 10/6/2016 | 10/6/2016 | P | PASS |
Jim Sly
|
|
|
Joe-please call 20 minutes prior to meet Phone #: ###-####
|
OVERRIDE | | | 10/3/2016 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/3/2016 | 10/3/2016 | 10/3/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 10/3/2016 | | 10/3/2016 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 10/3/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/3/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/3/2016 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/30/2016 | 9/30/2016 | 9/30/2016 | P | FAIL |
Tisha Gallop
|
|
|
need engineering for steel tube perlins, roof covering and associated connections, for the walkway
|
Routing Walk-In (BLD) | 9/29/2016 | 9/29/2016 | 9/29/2016 | A | FAIL |
Brian McGowan
|
|
|
Covered walk way and carport are post and beam construction. Actual plans must be signed and stamped by an engineer with signed and stamped calculations for all componants.
|
Routing Walk-In (BLD) | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | FAIL |
Brian McGowan
|
|
|
Engineering was incomplete. Did not have calculations for all the componants, the plans with no calculations for specific beams and columns were not stamped. No dimensions on plans.
|
Routing Walk-In (Zoning) | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | PASS |
Josh Wilson
|
|
|
Ok per Big Sky overlay. Residence addition not included in this permit.
|
Routing Walk-In (BLD) | 9/16/2016 | 9/16/2016 | 9/16/2016 | P | FAIL |
Tisha Gallop
|
|
|
need engineering for walkway cantilevered patio cover, need construction details for enclosing carport and new attached carport. Residential addition NOT included in this scope
|
1st review completed | | | 9/16/2016 | | FAIL |
|
|
|
|
Application received | | 9/16/2016 | | | |
|
|
|
|