BLD-Footing | 10/26/2016 | 10/27/2016 | 10/27/2016 | A | PASS |
Mike Jordan
|
|
|
Rich Phone #: ###-####
|
Override - Parcel Holds | 10/26/2016 | 1/1/1900 | 10/26/2016 | | |
|
|
|
tag on parcel is not for fees due on the building permit-it is for a variance that is past the date
|
BLD-Footing | 10/25/2016 | 10/25/2016 | 10/25/2016 | P | CANC |
Mike Jordan
|
|
|
Inspection cancelled from web by: rich prasch
|
BLD-Footing | 10/24/2016 | 10/25/2016 | 10/25/2016 | A | CANC |
Mike Jordan
|
|
|
This footing inspection can be done late AM or early PM. Jimmy will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### >> Inspection requested via web by rich prasch Inspection cancelled from web by: rich prasch
|
Routing Walk-In (Zoning) | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | PASS |
Jeff Lowe
|
|
|
cva16-00066
|
Routing Walk-In (BLD) | 10/24/2016 | 10/24/2016 | 10/24/2016 | P | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/24/2016 | | 10/24/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/24/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/24/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/24/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/24/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/24/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 9/19/2016 | 9/19/2016 | 9/19/2016 | P | FAIL |
Jeff Lowe
|
|
|
variance required for rear setback
|
1st review completed | | | 9/16/2016 | | DONE |
Brian McGowan
|
|
|
|
Application received | | 9/19/2016 | | | |
|
|
|
|