BLD-Final | 10/21/2016 | 10/21/2016 | 10/24/2016 | P | PASS |
Dave Hannah
|
|
|
Chris Phone #: ###-####
|
DOC - Permit Finaled | 10/24/2016 | 10/24/2016 | 10/24/2016 | A | PASS |
Dave Hannah
|
|
|
|
PubWorks Subgrade Approval | 10/11/2016 | 10/11/2016 | 10/11/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Jason Taylor ###-####.
|
OVERRIDE | | | 9/26/2016 | | |
|
|
|
|
Routing Walk-In (Zoning) | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | PASS |
Bruce Eggleston
|
|
|
Meets the setbacks in the R-1C Zone. BPE
Jason Taylor reviewed and said that no Hillside application is needed. The engineering design from Structural Edge Engineering, PLLC will be reviewed at the building phase. Refer to Jason Taylor for final structural engineering.
|
Routing Walk-In (PW Hillside) | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Routing Walk-In (BLD) | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | DONE |
Brian McGowan
|
|
|
|
Routing Walk-In (Zoning) | 9/21/2016 | 9/21/2016 | 9/26/2016 | A | DONE |
Candy A. Nichols
|
|
|
Knows he needs to speak to Jason T // customer left a message on Jasons voice mail and left the building when informed we are unable to give out Jason T's cell number
|
Issue PAID IN FULL permit | | | 9/26/2016 | | DONE |
|
|
|
|
1st review completed | | | 9/26/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 9/26/2016 | | 9/26/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 9/26/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 9/26/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/26/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - Erosion and Sediment | 9/26/2016 | | 9/26/2016 | | PASS |
Andy J. Long
|
|
|
ESC permit conditions reviewed with contractor. Retaining wall project in backyard. No ROW stockpiling per contractor.
|
Permit Ready to Issue | | | 9/26/2016 | | DONE |
|
|
|
as per Andy Long; okay to issue as homeowner responsible person
|
Meeting | | | 9/22/2016 | | DONE |
|
|
|
as per Brittany's email Jason T is ok to take the permit app in-the gentlemen left our office with his app
|
Application received | | 9/21/2016 | | | |
|
|
|
|