Information based on query as of Friday, June 21, 2024.
Permit Information
Permit NumberBLD16-03490
StatusFinaled
Name SILVER LEAF CONSTRUCTION
Site Address 1789 S BROADWAY AVE Unit: 120
Project NameEdward Jones Suite 120
Customer Number 
ePlanReviewYes
Description
**(EDWARD JONES – SUITE 120)** Permit is to remodel an existing 680 sq. ft. vacant tenant space within a 5,158 sq. ft. building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, accessible restroom and restroom fixtures within the tenant space, removal of select door/door frames and relocate (1) door/door frame, removal of select acoustic ceiling, construction of select interior nonbearing walls to create an office, a storage room, an equipment storage room, a reception/waiting area, new door/door frames, new roof RTU unit, new acoustic and select new gypsum ceiling, new light fixtures, electrical work, mechanical work, plumbing work and interior finishes to be in compliance with Ch. 8 of the 2012 IBC. This building is not Fire Sprinklered. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/10/201611/10/201611/10/2016PPASS
DetailsMike Jordan
Inspection requested via web by Jim Silsby. Ok for perm. occ.
FIRE-Final Inspection11/10/201611/10/201611/10/2016APASS
DetailsTroy Cobbley
Life safety passed. One door was missing single action hardware but per conversation will be installed prior to the building inspection.
Print Occupancy Form  11/10/2016 DONE
Permanent Occupancy  11/10/2016 DONE
Plan Reviewer's activity  11/10/2016 DONE
DetailsJavier Guzman
Per Bill Vandergrifth no plumbing inspection required and need a revised certificate of value to place plumbing value at zero
BLD-Ceiling Grid Inspection11/3/201611/4/201611/4/2016PPASS
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Jim Silsby
BLD-Framing/Rough-in10/12/201610/14/201610/14/2016PPASS
DetailsJim Storey
Jim or Blaine ###-#### Phone #: ###-####
Plan assigned to (JG)9/23/20169/23/201610/12/2016 PASS
DetailsJavier Guzman
1st review completed, 10/04 L2 Edward Jones - TI ePlan
Routing - PLAN CHECK10/12/2016 10/12/2016 PASS
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/12/2016 DONE
Permit Ready to Issue  10/12/2016 DONE
NEED GC form and certificate of value
Print Occupancy Form  10/12/2016 DONE
Issue PAID IN FULL permit  10/12/2016 DONE
Routing - PLAN CHECK9/23/2016 9/30/2016 FAIL
DetailsJavier Guzman
Routing - MECHANICAL9/23/2016 9/30/2016 PASS
DetailsTroy James
1st review completed  9/30/2016 FAIL
DetailsJavier Guzman
Routing - Addressing9/23/2016 9/26/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS9/23/2016 9/26/2016 PASS
DetailsRachael Beierle
Intake Approval  9/23/2016 PASS
DetailsJavier Guzman
Application received  9/21/2016 DONE
Application submitted via PDS Online on Sep 21 2016 11:57AM