BLD-Final | 9/15/2017 | 9/18/2017 | 9/18/2017 | A | PASS |
Mike Jordan
|
|
|
Troy Phone #: ###-####
|
DOC - Permit Finaled | 9/18/2017 | 9/18/2017 | 9/18/2017 | P | PASS |
Mike Jordan
|
|
|
|
PubWorks Occupancy Approval | 9/15/2017 | 9/15/2017 | 9/15/2017 | | DONE |
Melissa Jannusch
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Aging Inspection | 8/30/2017 | 8/30/2017 | 8/30/2017 | | PASS |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 8/29/2017 | 8/29/2017 | 8/29/2017 | | PEND |
Mike Jordan
|
|
|
|
BLD-Final | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | CANC |
Mike Jordan
|
|
|
Temp OC- Call for acress 20 mins a head- Troy Phone #: ###-####. Stil needs public works. MAy try to post bond for public works?
|
BLD-Grading Inspection | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | CANC |
Mike Jordan
|
|
|
please ahead 30mins for access-Troy Phone #: ###-####. Spoke to troy and directed him to Brian Murphy and to Andrea Tuning for finals.
|
BLD-Framing/Rough-in | 4/14/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Mike Jordan
|
|
|
Troy Phone #: ###-####
|
BLD-Energy code compliance | 4/13/2017 | 4/14/2017 | 4/14/2017 | A | PASS |
Mike Jordan
|
|
|
Troy Phone #: ###-####
|
BLD-Framing/Rough-in | 4/11/2017 | 4/12/2017 | 4/12/2017 | A | PART |
Mike Jordan
|
|
|
Troy Phone #: ###-####. Ok to insulate. All issues resolved. Will have interior OSB on rv bay completed on energy inspection as well As A01 truss missed interior bearing issue resolved as well.
|
BLD-Framing/Rough-in | 4/7/2017 | 4/10/2017 | 4/10/2017 | A | FAIL |
Mike Jordan
|
|
|
Troy Phone #: ###-####. Per engineering for tall wall, block all panel edges and nail with 8d. per schedule. Provide the 2x6 diagnorl trussing as per enginering on RV bay openings. Attach sheathing on north west wall and wall adjacent to main entry. Nail off the 2ply E03 and Do3 trusses per the truss engineeing. Install the missing lateral brace on E02 truss. Install beam across mech. opening to provide the required bearing for C08, C09 and C10 trusses. Provide header over door from garage to house. Install blocking at panel edges on portal frames in back and nail. Complete nailing of all portal frames- nails only. Complete install of hold downs, missing nuts. Correction notice posted.
|
BLD-Foundation | 2/6/2017 | 2/6/2017 | 2/6/2017 | P | PASS |
Dave Hannah
|
|
|
Ryan Phone #: ###-####
|
BLD-Footing | 2/1/2017 | 2/2/2017 | 2/2/2017 | P | PASS |
Mike Jordan
|
|
|
Ryan Phone #: ###-####
|
PubWorks Subgrade Approval | 2/1/2017 | 2/1/2017 | 2/1/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
Issue PAID IN FULL permit | | | 12/2/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/2/2016 | | DONE |
|
|
|
|
OVERRIDE | | | 12/1/2016 | | |
|
|
|
|
Plan assigned to (LEG) Tisha | 10/28/2016 | | 12/1/2016 | | DONE |
Tisha Gallop
|
|
|
2nd review 11/21; 1st review 11/16 L2 (not wui); Plan check; foundation eng, wall bracing, etc.
|
Routing - PLAN CHECK | 11/25/2016 | | 12/1/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/1/2016 | | DONE |
|
|
|
all requirements met
|
Plan resubmittals received | | | 11/25/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 11/21/2016 | | |
|
|
|
|
Routing - PLAN CHECK | 11/21/2016 | | 11/21/2016 | | PASS |
Tisha Gallop
|
|
|
wall bracing
|
Routing - PLAN CHECK | 10/28/2016 | | 11/16/2016 | | FAIL |
Tisha Gallop
|
|
|
|
1st review completed | | | 11/16/2016 | | FAIL |
|
|
|
|
Routing PW Grading-Hillside | 10/28/2016 | | 11/9/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - MECHANICAL | 11/2/2016 | | 11/2/2016 | | PASS |
Troy James
|
|
|
|
Routing - FIRE | 10/28/2016 | 10/28/2016 | 10/31/2016 | | PASS |
Katie Marron
|
|
|
Not in WUI.
|
Routing - PLANNING | 10/28/2016 | | 10/31/2016 | | PASS |
Jeff Lowe
|
|
|
|
Routing - MECHANICAL | 10/28/2016 | | 10/28/2016 | | FAIL |
Troy James
|
|
|
emailed corrections to air dynamics
|
Routing - Erosion and Sediment | 10/28/2016 | | 10/28/2016 | | PASS |
Andy J. Long
|
|
|
ESC site map and narrative approved. Valid PD and RP designated. Site preparation inspection required, call ###-#### or 794-899
|
Routing - Addressing | 10/28/2016 | | 10/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 10/28/2016 | | 10/28/2016 | | PASS |
Morgan Webb
|
|
|
WEST BOISE NEEDS TO BE CONTACTED FOR PERMIT.
|
Intake Approval | | | 10/28/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/28/2016 | | DONE |
|
|
|
|
Application received | | | 9/21/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 21 2016 3:43PM
|