Letter of compliance/Occupancy | | | 8/4/2017 | | DONE |
|
|
|
|
BLD-Final | 6/26/2017 | 6/26/2017 | 6/26/2017 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
DOC - Permit Finaled | 6/26/2017 | 6/26/2017 | 6/26/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/20/2017 | 6/20/2017 | 6/20/2017 | P | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, need cont handrail,, fire caulking
|
Zoning Approval | 6/20/2017 | 6/20/2017 | 6/20/2017 | | PASS |
Sarah Schafer
|
|
|
|
PubWorks Occupancy Approval | 6/19/2017 | 6/19/2017 | 6/19/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
CHANGE STATUS TO (ISS) | | | 4/27/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/27/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 4/24/2017 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/24/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/24/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Plan assigned to (AJS) | 4/12/2017 | 4/12/2017 | 4/12/2017 | | DEFR |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 4/12/2017 | 4/12/2017 | 4/12/2017 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 4/12/2017 | | 4/12/2017 | | PASS |
Tisha Gallop
|
|
|
modification to fire wall approved. Revised sheets taken to records
; 1 hr admin fee for plan mod review
|
Inspection Record Card- Bld | | | 4/12/2017 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/12/2017 | | DONE |
|
|
|
Two copies of sheets S2.1 and A3.1. Taken to Tisha per Tisha
|
BLD-Energy code compliance | 2/27/2017 | 2/28/2017 | 2/28/2017 | A | PASS |
Dave Hannah
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 2/28/2017 | 2/28/2017 | 2/28/2017 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 2/7/2017 | 2/9/2017 | 2/9/2017 | A | PEND |
Tony Young
|
|
|
Ron Phone #: ###-####,, pending design for seperation
|
BLD-Framing/Rough-in | 2/6/2017 | 2/7/2017 | 2/7/2017 | P | NR |
Tony Young
|
|
|
Ron Phone #: ###-####,, no plans ,, walk through only,, firewall issues
|
BLD-Wall cover | 1/12/2017 | 1/12/2017 | 1/13/2017 | P | CANC |
Tony Young
|
|
|
james Phone #: ###-####
|
BLD-Framing/Rough-in | 1/12/2017 | 1/12/2017 | 1/12/2017 | P | NR |
Tony Young
|
|
|
james Phone #: ###-####,, frame ?s only
|
BLD-Other | 1/3/2017 | 1/3/2017 | 1/3/2017 | P | PART |
Jim Storey
|
|
|
Aaron-party wall Phone #: ###-#### screws in gyp ok 2nd floor assembled on ground.
|
BLD-Framing/Rough-in | 12/27/2016 | 12/27/2016 | 12/28/2016 | P | PART |
Jim Sly
|
|
|
Aaron Phone #: ###-#### 5/8 rock layer of 1 hr wall closest to proper line 2nd floor....OK.
|
BLD-Conference | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | PART |
Tony Young
|
|
|
party wall screw pattern ok,, ok to stand main level fire/shear/ property line walls
|
BLD-Foundation | 11/28/2016 | 11/29/2016 | 11/29/2016 | A | PASS |
Tony Young
|
|
|
Randy Phone #: ###-####,, ok now
|
PubWorks Subgrade Approval | 11/29/2016 | 11/29/2016 | 11/29/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Foundation | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | PEND |
Tony Young
|
|
|
Randy Phone #: ###-####,, need soils approval 1st
|
BLD-Footing | 11/23/2016 | 11/23/2016 | 11/23/2016 | P | PASS |
Phil Shearer
|
|
|
Randy Phone #: ###-####
|
Place hold on job | 11/2/2016 | | 11/10/2016 | | DONE |
Brittany Hill
|
|
|
DO NOT ISSUE WITHOUT BLD16-03501
|
Routing - PLANNING | 11/10/2016 | | 11/10/2016 | | PASS |
Josh Wilson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2016 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 11/10/2016 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2016 | | DONE |
|
|
|
called Ron to let know permits are ready-left message on his phone
|
Issue PAID IN FULL permit | | | 11/10/2016 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 11/7/2016 | | 11/9/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 11/7/2016 | | DONE |
|
|
|
Three copies of sheets C1.0, C3.0, C3.1 and ESC3.2. Taken to Tisha.
|
CHANGE STATUS TO (REV) | | | 11/4/2016 | | |
|
|
|
change out of RDY staus see Jim Wylie.
|
OVERRIDE | | | 11/2/2016 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/2/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/2/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/2/2016 | | DONE |
|
|
|
ALL MET
|
Routing - PLAN CHECK | 10/18/2016 | | 11/2/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2016 | | DONE |
|
|
|
|
Plan assigned to (LEG) Tisha | 9/23/2016 | | 11/2/2016 | | DONE |
Tisha Gallop
|
|
|
1st review 10/8; L2 townhouse; hillside & plan check
|
Plan resubmittals received | | | 10/27/2016 | | DONE |
|
|
|
Received two copies of plan sheets A1.1, A1.2, A2, A3.1, A3.2, S2.2, S3.1, S3.2, S4; inserted into plans by LEG
|
Routing PW Grading-Hillside | 10/18/2016 | | 10/19/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 10/18/2016 | | 10/18/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing - PLAN CHECK | 10/4/2016 | | 10/8/2016 | | FAIL |
Tisha Gallop
|
|
|
e-mailed applicant comments
|
1st review completed | | | 10/8/2016 | | FAIL |
|
|
|
PW hillside & plan check
|
Plan resubmittals received | | | 10/4/2016 | | DONE |
|
|
|
Received three full sets of grading and erosion & sediment control sheets, plans taken to LEG for review
|
Routing - FIRE | 10/3/2016 | | 10/4/2016 | | PASS |
Scott Arellano
|
|
|
This project has been evaluated for compliant Fire Department vehicle access, water supply, and applicable provisions of BMC 7-01-69 for defensible space. Final approval will be subject to satisfactory field inspection by Boise Fire Department.
|
Routing - Erosion and Sediment | 9/30/2016 | | 9/30/2016 | | PASS |
Andy J. Long
|
|
|
Subdivision BMPs and onsite trash and concrete washout facility shall be provdided and maintained.
|
Routing - MECHANICAL | 9/29/2016 | | 9/30/2016 | | PASS |
Troy James
|
|
|
|
Routing - Design Review | 9/28/2016 | | 9/29/2016 | | PASS |
Josh Wilson
|
|
|
DRH14-00164
|
Routing - PUBLIC WORKS | 9/27/2016 | | 9/28/2016 | | FAIL |
Morgan Webb
|
|
|
failed hillside
|
Routing - PLANNING | | | 9/28/2016 | | PASS |
Leon Letson
|
|
|
|
Routing PW Grading-Hillside | 9/26/2016 | | 9/27/2016 | | FAIL |
Jason C. Taylor
|
|
|
Subdivision not approved for construction. will need revised geotech and grading plan prior to approval. JCT See email dated 9/27/2016
|
Routing PW Sewer Rating | 9/26/2016 | | 9/26/2016 | | PASS |
Morgan Webb
|
|
|
|
Routing - Addressing | 9/23/2016 | | 9/26/2016 | | PASS |
Laura Hunter
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/23/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/23/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/23/2016 | | DONE |
|
|
|
|
Application received | | 9/22/2016 | | | |
|
|
|
|