Zoning Approval | 8/31/2017 | 8/31/2017 | 8/31/2017 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Final | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
DOC - Permit Finaled | 8/28/2017 | 8/28/2017 | 8/28/2017 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Final | 8/23/2017 | 8/25/2017 | 8/25/2017 | A | CANC |
Dave Hannah
|
|
|
Ron Phone #: ###-####
|
PubWorks Occupancy Approval | 8/25/2017 | 8/25/2017 | 8/25/2017 | | DONE |
Melissa Jannusch
|
|
|
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
|
BLD-Conference | 7/11/2017 | 7/14/2017 | 7/14/2017 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####,, handrail ?s,, needs to be continuous
|
BLD-Energy code compliance | 5/4/2017 | 5/8/2017 | 5/8/2017 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 5/2/2017 | 5/3/2017 | 5/3/2017 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####.. ok to insulate
|
CHANGE STATUS TO (ISS) | | | 4/24/2017 | | |
|
|
|
Plan Mod should have been done on BLD16-03502
|
OVERRIDE | | | 4/12/2017 | | |
|
|
|
|
BLD-Wall Bracing | 4/11/2017 | 4/12/2017 | 4/12/2017 | P | PART |
Tony Young
|
|
|
Ron; Phone #: ###-####,, exterior ok,, soffits are work in progress,, ok
|
Inspection Record Card- Bld | | | 4/12/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 4/12/2017 | | DONE |
|
|
|
Two copies of sheets S2.1 and A3.1. Taken to Tisha per Tisha
|
Plan assigned to (LEG) Tisha | 4/12/2017 | | 4/12/2017 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 4/12/2017 | | 4/12/2017 | | PASS |
Tisha Gallop
|
|
|
1-hr fee for building review plan mod
|
Case Summary (BLD) | | | 4/12/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/12/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Inspection Record Card- Bld | | | 4/12/2017 | | DONE |
|
|
|
|
Telephone call | | | 4/12/2017 | | DONE |
|
|
|
Sent a message to Ron (phone number doesn't work ###-####) informing him that his plan mods are ready and the fee amounts due for issunace
|
BLD-Wall Bracing | 4/10/2017 | 4/11/2017 | 4/11/2017 | P | NR |
Tony Young
|
|
|
Ron Phone #: ###-####,, exterior walk through conf.. need to re-nail various areas
|
BLD-Wall Bracing | 4/7/2017 | 4/10/2017 | 4/10/2017 | P | NR |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Wall Bracing | 4/7/2017 | 4/7/2017 | 4/7/2017 | P | NR |
Tony Young
|
|
|
Ron Phone #: ###-####,, need to re-nail some areas
|
BLD-Other | 3/2/2017 | 3/3/2017 | 3/3/2017 | A | PASS |
Tony Young
|
|
|
Aaron-party walls Phone #: ###-####,, 2nd level ok
|
BLD-Other | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-####-firewall on garage level ok
|
CHANGE STATUS TO (COL) | | | 2/22/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 2/22/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/22/2017 | | DONE |
|
|
|
was put in COL by mistake
|
(F) Reprint permit | | | 2/22/2017 | | DONE |
|
|
|
|
BLD-Other | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | PART |
Tony Young
|
|
|
Ron-party wall Phone #: ###-####,, garage level firewalls ok to stand
|
BLD-Other | 2/9/2017 | 2/10/2017 | 2/10/2017 | P | PART |
Tony Young
|
|
|
fire wall-Aaron Phone #: ###-####,, ground level firewalls ok to stand
|
OVERRIDE | | | 2/7/2017 | | |
|
|
|
|
Telephone call | | | 2/7/2017 | | DONE |
|
|
|
Left a message for Ron informing him that these four plan mods are ready to be picked up and there are no fees due
|
Plan assigned to (LEG) Tisha | 2/3/2017 | | 2/7/2017 | | DONE |
Tisha Gallop
|
|
|
|
Routing PW Grading-Hillside | 2/3/2017 | | 2/7/2017 | | PASS |
Jason C. Taylor
|
|
|
|
Routing - PLAN CHECK | 2/7/2017 | | 2/7/2017 | | PASS |
Tisha Gallop
|
|
|
grading change approved by JCT, no change in structure
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/7/2017 | | DONE |
|
|
|
no fee for unexpected drainage change ony
|
Permit Ready to Issue | | | 2/7/2017 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD. No fees per Tisha and Rita
|
Plan Modification Accepted | | | 2/3/2017 | | DONE |
|
|
|
plan mod received 1 expllination sheet and 3 sheets of C2.0-took to Tisha
|
BLD-Footing | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PART |
Tony Young
|
|
|
Austin Phone #: ###-####,, work in progress on upper footings
|
BLD-Foundation | 12/30/2016 | 12/30/2016 | 12/30/2016 | A | PASS |
Jim Storey
|
|
|
austin ###-####
|
BLD-Footing | 12/16/2016 | 12/16/2016 | 12/16/2016 | P | PASS |
Tony Young
|
|
|
Jose Phone #: ###-####
|
PubWorks Subgrade Approval | 11/22/2016 | 11/22/2016 | 11/22/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
OVERRIDE | | | 11/10/2016 | | |
|
|
|
|
Place hold on job | 11/10/2016 | | 11/10/2016 | | DONE |
Brittany Hill
|
|
|
DO NOT ISSUE WITHOUT BLD16-03503 TO BLD16-03506
|
Inspection Record Card- Bld | | | 11/10/2016 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2016 | | DONE |
|
|
|
called Ron to let know permits are ready-left message on his phone
|
Issue PAID IN FULL permit | | | 11/10/2016 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/10/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/7/2016 | | 11/10/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/10/2016 | | DONE |
|
|
|
All Met
|
Plan assigned to (LEG) Tisha | 9/23/2016 | | 11/10/2016 | | DONE |
Tisha Gallop
|
|
|
1st building review 10/12; L2 townhouse; plan check & hillside
|
Routing PW Grading-Hillside | 11/8/2016 | | 11/9/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Plan resubmittals received | | | 11/7/2016 | | DONE |
|
|
|
Three copies of Sheets C1.0, C2.0, C2.1 and ESC2.2. Taken to Tisha
|
Routing - Design Review | 11/2/2016 | | 11/3/2016 | | PASS |
Josh Wilson
|
|
|
|
Plan resubmittals received | | | 11/2/2016 | | DONE |
|
|
|
resubmittals recieved 2 sets of sheets A1.1, A1.2, A2, A3.1, A3.2, A4.1, A4.2, S1, S2.2, S2.1, S3, S3.1, S4-Took to Tisha
|
Routing PW Grading-Hillside | 10/18/2016 | | 10/24/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PUBLIC WORKS | 10/24/2016 | | 10/24/2016 | | PASS |
Morgan Webb
|
|
|
|
Plan resubmittals received | | | 10/24/2016 | | DONE |
|
|
|
received two copies of sheets A1.2, A2, A3.1, A3.2, A4.1, A4.2, S1, S2.2, S3, S3.1, S4- Put on Tisha's desk
|
Routing - FIRE | 10/12/2016 | | 10/13/2016 | | PASS |
Katie Marron
|
|
|
This project has been evaluated for compliant Fire Department vehicle access, water supply, and applicable provisions of BMC 7-01-69 for defensible space. Final approval will be subject to satisfactory field inspection by Boise Fire Department.
|
Routing - Erosion and Sediment | 10/10/2016 | | 10/12/2016 | | PASS |
Andy J. Long
|
|
|
Subdivision BMPs and onsite trash and concrete washout facility shall be provdided and maintained. Valid PD designated Note : RP is a certified program ESC Training Instructor (RP&PD)
|
Routing - PLAN CHECK | | | 10/12/2016 | | FAIL |
Tisha Gallop
|
|
|
|
1st review completed | | | 10/12/2016 | | FAIL |
|
|
|
|
Routing - Design Review | 9/27/2016 | | 10/10/2016 | | PASS |
Josh Wilson
|
|
|
DRH14-00164
|
Routing - MECHANICAL | 10/7/2016 | | 10/10/2016 | | PASS |
Troy James
|
|
|
|
Routing - PLANNING | 9/27/2016 | | 10/7/2016 | | PASS |
Leon Letson
|
|
|
|
Plan resubmittals received | | | 10/4/2016 | | DONE |
|
|
|
Received three full sets of grading and erosion & sediment control sheets, plans taken to LEG for review
|
Routing PW Grading-Hillside | 9/26/2016 | | 9/27/2016 | | FAIL |
Jason C. Taylor
|
|
|
Subdivision not approved for construction. will need revised geotech and grading plan prior to approval. JCT See email dated 9/27/2016
|
Routing - PUBLIC WORKS | 9/26/2016 | | 9/27/2016 | | FAIL |
Morgan Webb
|
|
|
Failed by Jason Taylor Hillside.
|
Routing - Addressing | 9/23/2016 | | 9/26/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing PW Sewer Rating | 9/26/2016 | | 9/26/2016 | | PASS |
Morgan Webb
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/23/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/23/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/23/2016 | | DONE |
|
|
|
|
Application received | | 9/22/2016 | | | |
|
|
|
|