Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD16-03504
StatusFinaled
Name KB FINANCIAL LLC
Site Address 2280 W HILL TERRACE LN
Project Name 
Customer NumberBLD16-03503 - 3506
ePlanReviewNo
Description
BND17-00078 DRH14-00164/PUD14-00006; WUI Zone A; Permit for the construction of a new 1485 sq. ft., two story Townhouse with 2 bedrooms, 2 bathrooms on the upper level and 668 sq. ft. attached garage below. All work per the approved plans, engineering, ACCA Report, and any notations. R-1C zoning and setbacks per planning.//leg *** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval9/21/20179/21/20179/21/2017 DONE
DetailsMelissa Jannusch
A bond for the sites final grading and re-vegetation has been received by Public Works. Occupancy may be approved by the building department. Melissa Jannusch ###-####.
Zoning Approval8/31/20178/31/20178/31/2017 PASS
DetailsSarah Schafer
BLD-Final8/25/20178/28/20178/28/2017ADONE
DetailsDave Hannah
Ron Phone #: ###-####
BLD-Final8/23/20178/25/20178/25/2017APASS
DetailsDave Hannah
Ron Phone #: ###-####
DOC - Permit Finaled8/25/20178/25/20178/25/2017PPASS
DetailsDave Hannah
BLD-Conference7/11/20177/14/20177/14/2017APASS
DetailsTony Young
Ron Phone #: ###-####,, handrail ?s
BLD-Energy code compliance5/4/20175/8/20175/8/2017APASS
DetailsTony Young
Ron Phone #: ###-####,, ok to cover
BLD-Framing/Rough-in5/3/20175/4/20175/4/2017APART
DetailsTony Young
Ron Phone #: ###-####,, will look at fixes at energy code inspection
BLD-Framing/Rough-in5/2/20175/3/20175/3/2017APART
DetailsTony Young
Ron Phone #: ###-####,, c/n
BLD-Wall Bracing4/11/20174/12/20174/12/2017PPART
DetailsTony Young
Ron,, ###-####,, exterior ok,, soffits are work in progress,, ok
Inspection Record Card- Bld  4/12/2017 DONE
BLD-Wall Bracing4/10/20174/11/20174/11/2017PNR
DetailsTony Young
Ron Phone #: ###-####,, exterior walk through conf.. need to re-nail various areas
BLD-Wall Bracing4/7/20174/10/20174/10/2017PNR
DetailsTony Young
Ron Phone #: ###-####
BLD-Wall Bracing4/7/20174/7/20174/7/2017PNR
DetailsTony Young
Ron Phone #: ###-####,, need to re-nail various areas
BLD-Conference4/5/20174/6/20174/6/2017APART
DetailsTony Young
Ron Phone #: ###-####,, ?s on firewall
BLD-Other3/2/20173/3/20173/3/2017APASS
DetailsTony Young
Aaron-party walls Phone #: ###-####,, 2nd level ok
BLD-Other2/21/20172/22/20172/22/2017APART
DetailsTony Young
Ron Phone #: ###-####-firewall on garage level ok
CHANGE STATUS TO (ISS)  2/22/2017 DONE
(F) Reprint permit  2/22/2017 DONE
OVERRIDE  2/7/2017  
Telephone call  2/7/2017 DONE
Left a message for Ron informing him that these four plan mods are ready to be picked up and there are no fees due
Plan assigned to (LEG) Tisha2/3/2017 2/7/2017 DONE
DetailsTisha Gallop
Routing PW Grading-Hillside2/3/2017 2/7/2017 PASS
DetailsJason C. Taylor
Routing - PLAN CHECK2/7/2017 2/7/2017 PASS
DetailsTisha Gallop
grading change approved by JCT, no change in structure
PLANS/APPL TAKEN TO FRONT DESK  2/7/2017 DONE
no fee for unexpected drainage change ony
Permit Ready to Issue  2/7/2017 DONE
DO NOT REISSUE PLAN MOD. No fees per Tisha and Rita
Plan Modification Accepted  2/3/2017 DONE
plan mod received 1 expllination sheet and 3 sheets of C2.0-took to Tisha
BLD-Footing1/17/20171/17/20171/17/2017PPART
DetailsTony Young
Austin Phone #: ###-####,, work in progress on upper footings
BLD-Foundation12/29/201612/30/201612/30/2016APASS
DetailsJim Storey
austin Phone #: ###-####
BLD-Footing12/16/201612/16/201612/16/2016PPASS
DetailsTony Young
Jose Phone #: ###-####
PubWorks Subgrade Approval11/22/201611/22/201611/22/2016 DONE
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
OVERRIDE  11/10/2016  
Inspection Record Card- Bld  11/10/2016 DONE
Place hold on job11/10/2016 11/10/2016 DONE
DetailsBrittany Hill
DO NOT ISSUE WITHOUT BLD16-03503 TO BLD16-03506
Telephone call  11/10/2016 DONE
called Ron to let know permits are ready-left message on his phone
Issue PAID IN FULL permit  11/10/2016 DONE
Case Summary (BLD)  11/10/2016 DONE
Routing - PLAN CHECK11/9/2016 11/10/2016 PASS
DetailsTisha Gallop
PLANS/APPL TAKEN TO FRONT DESK  11/10/2016 DONE
Permit Ready to Issue  11/10/2016 DONE
All Met
Plan assigned to (LEG) Tisha9/23/2016 11/10/2016 DONE
DetailsTisha Gallop
1st building review 10/12; L2 townhouse; plan check & hillside
Routing PW Grading-Hillside11/8/2016 11/9/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Plan resubmittals received  11/7/2016 DONE
Three copies of Sheets C1.0, C2.0, C2.1 and ESC2.2. Taken to Tisha
Routing - Design Review11/2/2016 11/3/2016 PASS
DetailsJosh Wilson
Plan resubmittals received  11/2/2016 DONE
resubmittals recieved 2 sets of sheets A1.1, A1.2, A2, A3.1, A3.2, A4.1, A4.2, S1, S2.2, S2.1, S3, S3.1, S4-Took to Tisha
Routing PW Grading-Hillside10/18/2016 10/24/2016 PASS
DetailsJason C. Taylor
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
Routing - PUBLIC WORKS10/24/2016 10/24/2016 PASS
DetailsMorgan Webb
Plan resubmittals received  10/24/2016 DONE
received two copies of sheets A1.2, A2, A3.1, A3.2, A4.1, A4.2, S1, S2.2, S3, S3.1, S4- Put on Tisha's desk
Routing - FIRE10/13/2016 10/13/2016 PASS
DetailsKatie Marron
This project has been evaluated for compliant Fire Department vehicle access, water supply, and applicable provisions of BMC 7-01-69 for defensible space. Final approval will be subject to satisfactory field inspection by Boise Fire Department.
Routing - Erosion and Sediment10/10/2016 10/12/2016 PASS
DetailsAndy J. Long
Subdivision BMPs and onsite trash and concrete washout facility shall be provdided and maintained. Valid PD designated Note : RP is a certified program ESC Training Instructor (RP&PD)
Routing - PLAN CHECK  10/12/2016 FAIL
DetailsTisha Gallop
1st review completed  10/12/2016 FAIL
Routing - MECHANICAL10/7/2016 10/10/2016 PASS
DetailsTroy James
Routing - Design Review9/27/2016 10/10/2016 PASS
DetailsJosh Wilson
DRH14-00164
Routing - PLANNING9/27/2016 10/7/2016 PASS
DetailsLeon Letson
Plan resubmittals received  10/4/2016 DONE
Received three full sets of grading and erosion & sediment control sheets, plans taken to LEG for review
Routing PW Grading-Hillside9/26/2016 9/27/2016 FAIL
DetailsJason C. Taylor
Subdivision not approved for construction. will need revised geotech and grading plan prior to approval. JCT See email dated 9/27/2016
Routing - PUBLIC WORKS9/26/2016 9/27/2016 FAIL
DetailsMorgan Webb
Failed by Jason Taylor Hillside.
Routing - Addressing9/23/2016 9/26/2016 PASS
DetailsLaura Hunter
Routing PW Sewer Rating9/26/2016 9/26/2016 PASS
DetailsMorgan Webb
Plans ACCEPTED BY PLAN TECH  9/23/2016 DONE
Intake Approval  9/23/2016 PASS
Recd Pcfee & Taken To Pln CK  9/23/2016 DONE
Application received 9/22/2016