Permit Information
Permit NumberBLD16-03508
StatusFinaled
Name AGUA VIVA BAPTIST CHURCH
Site Address 7515 W CAMAS ST
Project NameLiving Waters Church Addition
Customer Number 
ePlanReviewYes
Description
(LIVING WATERS CHURCH – IGLESIA BAUTISTA AGUA VIVA – BUILDING ADDITION) (CUP16-00069) This building does not have a fire sprinkler system. To construct a 384 square foot classroom addition to an existing building that is being used as a church. The footings and foundation were constructed under permit BLD16-03723. After the addition, this building will have a total floor area of about 3,964 square feet. Work is to include concrete footings, concrete foundations, a wood joist floor system, wood exterior bearing and braced walls, wood truss roof with structural sheathing, a roof cricket, exterior windows, exterior wall coverings, and interior finishes. The existing restrooms will be upgraded to be accessible to the disabled. Since there is no record of this building ever being legally converted to a church, this permit is intended to establish a Certificate of Occupancy for the entire building as a church. The design for the roof trusses is a deferred submittal item. The work is required to comply with the approved drawings, with the conventional light-frame construction provisions of the 2012 IBC, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Meeting  4/27/2017 DONE
Sent an email to Daniel Asking her to please place the values for Electrical and Plumbing on the notice as well
First Notice 4/8/20174/13/2017 DONE
DetailsChristina Prado
mailed 4/14
BLD-Final3/29/20173/29/20173/29/2017PDONE
DetailsMike Jordan
would like call ahead; Dan Phone #: ###-####
Permanent Occupancy  3/29/2017 DONE
BLD-Final3/24/20173/27/20173/27/2017PPEND
DetailsMike Jordan
Dan Phone #: ###-####. Pending plumbing.
BLD-Final3/24/20173/24/20173/24/2017PPEND
DetailsMike Jordan
would like call ahead; Dan Phone #: ###-####. Needs plumbing final. Everything else ok.
FIRE-Final Inspection3/23/20173/24/20173/24/2017APASS
DetailsJim Page
No fire sprinklers, fire alarm system is not operational and not required due to occupancy load, fire panel and associated componentswill be removed by tenant (Verified per conversation with Scott Arellano that fire panel and associated components can be removed) fire extinguishers are in place with current inspection tags. Final life fire safety inspection passed/complete.
FIRE-Conference2/9/20172/9/20172/9/2017PDONE
DetailsTroy Cobbley
I met with the Pastor and an electrician and went over the exit sign, emergency light, exit discharge requirements as shown on the plans. I also let them know the non-functional fire alarm system will need to be addressed.
FIRE-Final Inspection12/22/201612/27/201612/27/2016AFAIL
DetailsTroy Cobbley
Inspection turned into a conference in which we discussed the door hardware issues and where to place the exit signs and emergency lights. We discussed fire extinguisher placement and the non-functional fire alarm system that does not meet current code but may have met the code it was installed under. The issue is the approved plans indicate two new strobes and the building only has old bells on the interior walls.
BLD-Conference12/21/201612/21/201612/21/2016PDONE
DetailsMike Jordan
Art Phone #: ###-####
BLD-Energy code compliance12/5/201612/6/201612/6/2016APASS
DetailsMike Jordan
Jose Phone #: ###-####
BLD-Framing/Rough-in12/2/201612/5/201612/5/2016APASS
DetailsMike Jordan
air seal; Jose Phone #: ###-####
BLD-Energy code compliance12/2/201612/5/201612/5/2016APASS
DetailsMike Jordan
air seal; Jose Phone #: ###-####
Telephone call  12/2/2016 DONE
called Art to let him know that Mike Jordan ok me to doc final the foundation permit so no inspections will get called in on it anymore-also taht the airbalance will need to be done before the frame
BLD-Wall Bracing11/21/201611/22/201611/22/2016PPASS
DetailsMike Jordan
BLD-Wall Bracing11/18/201611/21/201611/21/2016PFAIL
DetailsMike Jordan
Art Phone #: ###-####. Several areas missed.
BLD-Framing/Rough-in11/18/201611/21/201611/21/2016PCANC
DetailsMike Jordan
Art Phone #: ###-####
Plan assigned to (CJW)10/5/201610/5/201610/24/2016 PASS
DetailsCarl Westfall
(1st done) Living waters church addition
Routing Off Site - STRUCTURAL10/21/2016 10/24/2016 CANC
DetailsCarl Westfall
Keith Jones (AHJ) - The work is required to comply with the Conventional Light-Frame Constructions provisions of 2012 IBC Section 2308. Since the structural design is no longer relevant, the Consultant Structural Engineer's comments are no longer valid. CJW
Routing PW Sewer Rating10/21/2016 10/24/2016 PASS
DetailsRachael Beierle
Property in WBSD but not currenlty annexed into the district. On septic.
PLANS/APPL TAKEN TO FRONT DESK  10/24/2016 DONE
Permit Ready to Issue  10/24/2016 DONE
***all requirments met 10-24-16 /CEV

Needs GC Form, Revised Cert of Value, RP
Issue PAID IN FULL permit  10/24/2016 DONE
Print Occupancy Form  10/24/2016 DONE
Plan resubmittals received  10/21/2016 DONE
Plan Reviewer's activity  10/14/2016 DONE
Issued permit BLD16-03723 for footings and foundations only.
Plan Reviewer's activity  10/14/2016 DONE
Sent an Email to the owner "Paster Dan" describing bewilderment about the Architect not doing what he said he would do in a timely manner. Soon after found out that the Architect had uploaded drawings early mourning on Friday, October 14, 2016. The Architect did not notify us of this until Christina called him. Once the Plans Examiner knew this he prepared the permit and finished before noon on Friday, October 14, 2016.
Telephone call  10/12/2016 DONE
Talked to Pastor Dan. Told him that I had not heard from the Architect since Friday and that he had not uploaded drawings yet so I could not issue the footing and foundation permit.
Route to Impact Fee Review10/10/201610/13/201610/10/2016 PASS
DetailsCindy M. Gould
1st review completed  10/10/2016 DONE
Plan resubmittals requested  10/10/2016 DONE
Routing - PLAN CHECK10/5/2016 10/10/2016 FAIL
DetailsCarl Westfall
Routing completed
Routing - PLANNING10/5/2016 10/10/2016 PASS
DetailsBrent Moore
Routing Off Site - STRUCTURAL10/5/2016 10/7/2016 FAIL
DetailsCarl Westfall
Keith Jones - AHJ Engineers
Telephone call  10/7/2016 DONE
Talked to the Architect. Told him that I would get Planning to sign off on Monday morning and kick the workflow back to him so that he can upload drawings. The intent is to issue the footing and foundation permit that has been prepared. Am waiting for code compliant drawings and structural calculations and then the footing and foundation permit can be issued.
Routing - PLANNING Land Div10/5/2016 10/6/2016 PASS
DetailsTodd Tucker
Routing - FIRE10/5/201610/5/201610/5/2016 PASS
DetailsKatie Marron
No comments required.
Intake Approval  10/5/2016 PASS
Routing - Addressing10/5/2016 10/5/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS10/5/2016 10/5/2016 PASS
DetailsRachael Beierle
Routing - Erosion and Sediment10/5/2016 10/5/2016 PASS
DetailsAndy J. Long
ESC plan waiver approved. Ok for Pastor/facility manager to be "homeowner RP" if no other RP on project.
Plan Reviewer's activity  10/4/2016 PASS
Plan intake approved after several attempts.
Intake Approval  9/30/2016 FAIL
Intake Approval  9/29/2016 FAIL
Provide drawings to make the restrooms accessible.
Application received  9/22/2016 DONE
Application submitted via PDS Online on Sep 22 2016 1:46PM
Routing - PLAN CHECK10/21/2016    
DetailsCarl Westfall