BLD-Aging Inspection | 12/8/2017 | 12/8/2017 | 12/15/2017 | | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 12/15/2017 | 12/15/2017 | 12/15/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Foundation | 8/17/2017 | 8/18/2017 | 8/18/2017 | A | CANC |
Tony Young
|
|
|
Rebar // Austin Phone #: ###-####
|
BLD-Final | 7/26/2017 | 7/27/2017 | 7/27/2017 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Final | 7/25/2017 | 7/26/2017 | 7/26/2017 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
Zoning Approval | 7/26/2017 | 7/26/2017 | 7/26/2017 | | PASS |
Sarah Schafer
|
|
|
|
BLD-Final | 7/24/2017 | 7/25/2017 | 7/25/2017 | A | PART |
Tony Young
|
|
|
Ron Phone #: ###-####,, ok after zoning
|
BLD-Conference | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####,, walk through for final
|
BLD-Final | 7/21/2017 | 7/24/2017 | 7/24/2017 | A | NR |
Tony Young
|
|
|
Ron Phone #: ###-####,, need trades 1st
|
PubWorks Occupancy Approval | 7/21/2017 | 7/21/2017 | 7/21/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s civil engineer indicating that the final grading and drainage is acceptable has been received by Public Works. Final occupancy may be approved by the building department. Jason Taylor ###-####.
|
BLD-Aging Inspection | 7/19/2017 | 7/19/2017 | 7/20/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/18/2017 | 7/18/2017 | 7/20/2017 | | PEND |
Tony Young
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/12/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 4/12/2017 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/12/2017 | | DONE |
|
|
|
|
OVERRIDE | | | 3/27/2017 | | |
|
|
|
|
Plan assigned to (LEG) Tisha | 3/15/2017 | | 3/27/2017 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 3/15/2017 | | 3/27/2017 | | PASS |
Tisha Gallop
|
|
|
1 hr admin fee each (Bld16-03515 & 03513)
|
Permit Ready to Issue | | | 3/27/2017 | | DONE |
|
|
|
plan mod ONLY - DO NOT RE-ISSUE (BLD16-03515)
|
Plan Modification Accepted | | | 3/15/2017 | | DONE |
Christina Prado
|
|
|
As requested by Ron Beckman - to update framing members for construction set
|
BLD-Energy code compliance | 3/3/2017 | 3/6/2017 | 3/6/2017 | A | PASS |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Conference | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | PEND |
Tony Young
|
|
|
Ron Phone #: ###-####,, plumbing location issues for energy/freeze,, plumbers will move supply pipes out of freeze zones in rim areas
|
BLD-Energy code compliance | 3/2/2017 | 3/3/2017 | 3/3/2017 | A | NR |
Tony Young
|
|
|
Ron Phone #: ###-####
|
BLD-Framing/Rough-in | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | PART |
Tony Young
|
|
|
Ron- Phone #: ###-####,, c/n posted,, need fireplaces also,, ok to insulate
|
BLD-Framing/Rough-in | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | PART |
Tony Young
|
|
|
Ron-party wall Phone #: ###-####,, party wall framing ok per new fix
|
BLD-Wall cover | 1/13/2017 | 1/13/2017 | 1/13/2017 | P | PART |
Tony Young
|
|
|
firewalls ok
|
BLD-Foundation | 11/30/2016 | 11/30/2016 | 11/30/2016 | P | PASS |
Tony Young
|
|
|
Randy Phone #: ###-####
|
BLD-Footing | 11/28/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Tony Young
|
|
|
Randy Phone #: ###-####
|
PubWorks Subgrade Approval | 11/29/2016 | 11/29/2016 | 11/29/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 11/28/2016 | 11/28/2016 | 11/28/2016 | P | NR |
Tony Young
|
|
|
Randy Phone #: ###-####,, need soils approval 1st
|
OVERRIDE | | | 11/10/2016 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/10/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/10/2016 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/2/2016 | | 11/10/2016 | | PASS |
Tisha Gallop
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/10/2016 | | DONE |
|
|
|
needs GC Form
|
Plan assigned to (LEG) Tisha | 9/26/2016 | | 11/10/2016 | | DONE |
Tisha Gallop
|
|
|
2nd review 11/2; 1st review 10/10 L2 townhouse; hillside & plan check
|
Routing PW Grading-Hillside | 11/2/2016 | | 11/9/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at ###-####.
|
Routing - PLAN CHECK | 10/25/2016 | | 11/2/2016 | | FAIL |
Tisha Gallop
|
|
|
see comments by JCT
|
Routing PW Grading-Hillside | 10/25/2016 | | 11/2/2016 | | FAIL |
Jason C. Taylor
|
|
|
See notes in eplan. JCT
|
Plan resubmittals received | | | 11/2/2016 | | DONE |
|
|
|
|
Plan resubmittals received | | | 10/25/2016 | | DONE |
|
|
|
|
1st review completed | | | 10/10/2016 | | FAIL |
|
|
|
pendining approval from PW hillside & plan check
|
Routing - PLAN CHECK | 9/26/2016 | | 10/10/2016 | | FAIL |
Tisha Gallop
|
|
|
|
Routing - PLANNING | 9/26/2016 | | 10/10/2016 | | PASS |
Leon Letson
|
|
|
PUD14-00006
|
Routing - Design Review | 9/26/2016 | | 10/7/2016 | | PASS |
Josh Wilson
|
|
|
Ok per revised site plan dated 10/3/16
|
Routing - FIRE | 9/26/2016 | 9/26/2016 | 9/28/2016 | | PASS |
Katie Marron
|
|
|
Plans were reviewed for FD Access and hydrant availability. Road shall be in place capable of handling Fire Truck loads prior to construction. No comments required.
|
Routing PW Grading-Hillside | 9/26/2016 | | 9/27/2016 | | FAIL |
Jason C. Taylor
|
|
|
Subdivision not approved for construction. will need revised geotech and grading plan prior to approval. JCT See email dated 9/27/2016
|
Routing - MECHANICAL | 9/26/2016 | | 9/27/2016 | | PASS |
Troy James
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/26/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/26/2016 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/26/2016 | | DONE |
|
|
|
|
Routing - Addressing | 9/26/2016 | | 9/26/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 9/26/2016 | | 9/26/2016 | | PASS |
Rachael Beierle
|
|
|
|
Routing - Erosion and Sediment | 9/26/2016 | | 9/26/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan approved. 1 ESC permit required for each multi-unit building. Valid PD and RP designated.
|
Application received | | | 9/22/2016 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 22 2016 2:19PM
|