BLD-Energy code compliance | 12/15/2016 | 12/16/2016 | 12/16/2016 | A | PASS |
Jim Sly
|
|
|
Insulation // Andrew Phone #: ###-####
|
BLD-Framing/Rough-in | 12/8/2016 | 12/9/2016 | 12/9/2016 | A | PASS |
Dave Hannah
|
|
|
Andrew Phone #: ###-####
|
BLD-Framing/Rough-in | 11/10/2016 | 11/14/2016 | 11/14/2016 | A | NR |
Mike Jordan
|
|
|
Andrew Phone #: ###-####. Needs electrical and plumbing rough in inspections first. Could not find either of those permits.
|
Routing Walk-In (BLD) | 10/4/2016 | 10/4/2016 | 10/6/2016 | P | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 10/6/2016 | | 10/6/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/6/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/6/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/6/2016 | | DONE |
|
|
|
called to let Ryan know permit is ready and how much the fees are-also that we need something verifing that applican is the parcel owner-GIS shows someone different than Tidemark
|
Issue PAID IN FULL permit | | | 10/6/2016 | | DONE |
|
|
|
|
Routing Walk-In (BLD) | 9/26/2016 | 9/26/2016 | 9/26/2016 | P | FAIL |
Brian McGowan
|
|
|
Need beam size and verify bearing points in Basement. Needs to verify structure of exisitng shop being turned into garage.
|
Routing Walk-In (BLD) | 9/23/2016 | 9/23/2016 | 9/26/2016 | P | DONE |
Candy A. Nichols
|
|
|
|
1st review completed | | | 9/26/2016 | | FAIL |
Brian McGowan
|
|
|
Need beam size and verify bearing points in basement. Needs to verify structure of exisitng shed he wants to turn into garage.
|
Routing Walk-In (Zoning) | 9/23/2016 | 9/23/2016 | 9/23/2016 | P | PASS |
Katelyn Menuge
|
|
|
|
1st review completed | | | 9/23/2016 | | FAIL |
Brian McGowan
|
|
|
Need existing floor plan, verify front porch floor construction, verify load bearing wall down middle, verify shed to garage construction.
|
Application received | | 9/23/2016 | | | |
|
|
|
|