Permit Information
Permit NumberBLD16-03558
StatusFinaled
Name KC GARDNER RIVERWOODS LC
Site Address 800 W MAIN ST Unit: 900
Project NameClenera - 9th Floor -Suite 900
Customer Number 
ePlanReviewYes
Description
(CLENERA – 9TH STORY - SUITE 900) Fire sprinklers used for high rise. Permit for existing 4,890 sq. ft. tenant to expand to adjacent 2,264 sq. ft. vanilla space, to create a total 7,154 sq. ft. tenant space, this tenant space is on the 9th story of a new high rise building. Approval is contingent upon adhering to the approved plans on file. Work is to include: removal of select interior nonbearing wall, removal of select door/door frames and relocate, construction of select interior nonbearing walls to create an IT room, (2) meeting rooms, a new conference rooms and an open office area, new door/door frames, interior storefront windows, new acoustic suspended ceiling, new select gypsum soffits, new light fixtures, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print Statement  7/27/2017 DONE
First Notice 6/24/20177/12/2017 DONE
Mailed 7-13-17
Permanent Occupancy  6/14/2017 DONE
BLD-Final6/6/20176/7/20176/8/2017PPASS
DetailsDave Hannah
Larren Phone #: ###-####
FIRE-Final Inspection6/1/20176/1/20176/1/2017PPASS
DetailsJim Page
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety for area of work passed/complete
FIRE-Final Inspection5/30/20175/31/20175/31/2017ACANC
DetailsScott Arellano
Fire Alarm permitted work not ready. BLD life safety inspection cancelled. Larren Phone #: ###-####
FIRE-Final Inspection5/26/20175/30/20175/30/2017ACANC
DetailsTroy Cobbley
Need the project related fire alarm permit scheduled and passed prior to a life safety inspection.

Larrin Phone #: ###-####
BLD-Framing/Rough-in4/19/20174/20/20174/21/2017APART
DetailsDave Hannah
Darren Phone #: ###-#### framing ok but needs to remove untreated blocking and replace with fire treated
Issue PAID IN FULL permit  3/14/2017 DONE
Print Occupancy Form  3/14/2017 DONE
Plan assigned to (JG)2/1/20172/1/20173/9/2017 PASS
DetailsJavier Guzman
Plan Mod Clenera - 9th Floor -Suite 900
Routing - PLAN CHECK3/7/2017 3/9/2017 PASS
DetailsJavier Guzman
Permit Ready to Issue  3/9/2017 DONE
Needs; GC Form & Revised Cert of Value
Route to Impact Fee Review2/1/20172/4/20172/3/2017 PASS
DetailsCindy M. Gould
Review requested for Commercial Permit
Plan Modification Accepted  2/1/2017 DONE
DetailsChristina Prado
Resubmittal requested to reconfigure the office space to include new conf. rm, 2 meeting rms., new IT Rm & new office work area
Plan assigned to (JG)9/29/20169/29/201610/26/2016 PASS
DetailsJavier Guzman
10/26 L3 Clenera Expansion eplan
Routing - PLAN CHECK9/29/2016 10/26/2016 PASS
DetailsJavier Guzman
1st review completed  10/26/2016 DONE
DetailsJavier Guzman
PLANS/APPL TAKEN TO FRONT DESK  10/26/2016 DONE
Permit Ready to Issue  10/26/2016 DONE
DetailsChristina Prado
All met 3/9/17 C_P //// NEED GC and certificate of value
Routing - MECHANICAL9/29/2016 10/3/2016 PASS
DetailsChad Schwendiman
Routing - FIRE9/29/20169/29/20169/30/2016 PASS
DetailsKatie Marron
No comments required
Routing - Addressing9/29/2016 9/30/2016 PASS
DetailsLaura Hunter
Routing - PUBLIC WORKS9/29/2016 9/30/2016 PASS
DetailsBeverly Mountain
Intake Approval  9/29/2016 PASS
DetailsDavid Ferguson
Application received  9/26/2016 DONE
Application submitted via PDS Online on Sep 26 2016 3:58PM