First Notice | 12/20/2016 | 12/20/2016 | 1/10/2017 | | DONE |
Jim Sly
|
|
|
valuation of $501.00 so didn't send letter
|
Letter of compliance/Occupancy | | | 12/21/2016 | | DONE |
Alexandra L. DeYoung
|
|
|
|
BLD-Final | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | PASS |
Jim Sly
|
|
|
Dave Phone #: ###-####
|
DOC - Permit Finaled | 12/20/2016 | 12/20/2016 | 12/20/2016 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 12/19/2016 | 12/20/2016 | 12/20/2016 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 12/15/2016 | 12/16/2016 | 12/16/2016 | P | NR |
Jim Sly
|
|
|
David Phone #: ###-#### Need Fire Final.
|
FIRE-Final Inspection | 12/15/2016 | 12/16/2016 | 12/16/2016 | A | FAIL |
Troy Cobbley
|
|
|
Provide suite number, repair all exit signs and emergency lights including in the path of egress, reverse hardware at the connecting corridor, provide annual inspection for the fire extinguisher. Delete the exit sign directing people to the new wall/infill as discussed.
|
BLD-Ceiling Grid Inspection | 12/13/2016 | 12/13/2016 | 12/14/2016 | P | PASS |
Jim Sly
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Jim Sly
|
|
|
David Phone #: ###-####
|
Plan assigned to (JG) | 9/27/2016 | 9/27/2016 | 10/6/2016 | | PASS |
Javier Guzman
|
|
|
10/10 L2 VANILLA SHELL, STE.102 Paper
|
Routing - PLAN CHECK | 9/28/2016 | | 10/6/2016 | | PASS |
Javier Guzman
|
|
|
|
Case Summary (BLD) | | | 10/6/2016 | | DONE |
Javier Guzman
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/6/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/6/2016 | | DONE |
|
|
|
***all requirments met 10-6-16 /CEV
need GC from parcel owner-one in docs doesn't say who we have as parcel owner thru GIS-also need rev cert of val
DO NOT ISSUE WITHOUT BLD16-003568
|
Inspection Record Card- Bld | | | 10/6/2016 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2016 | | DONE |
|
|
|
called David- left message that permit is ready and need GC form and certificate of value before we can add final permit fees
|
Issue PAID IN FULL permit | | | 10/6/2016 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/6/2016 | | DONE |
|
|
|
|
1st review completed | | | 10/6/2016 | | DONE |
Javier Guzman
|
|
|
|
Routing - Addressing | 9/27/2016 | | 9/28/2016 | | PASS |
Laura Hunter
|
|
|
|
Routing - PUBLIC WORKS | 9/27/2016 | | 9/28/2016 | | PASS |
Rachael Beierle
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/27/2016 | | DONE |
|
|
|
|
Intake Approval | | | 9/27/2016 | | PASS |
Javier Guzman
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/27/2016 | | DONE |
|
|
|
|
Application received | | 9/27/2016 | | | |
|
|
|
|