BLD-Final | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | DONE |
Tony Young
|
|
|
|
DOC - Permit Finaled | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 5/17/2017 | 5/17/2017 | 5/18/2017 | P | PASS |
Tony Young
|
|
|
Please call ahead for access - Dwayne Phone #: ###-####
|
BLD-Final | 5/16/2017 | 5/17/2017 | 5/17/2017 | A | PASS |
Tony Young
|
|
|
Please call ahead for access - Dwayne Phone #: ###-####
|
BLD-Conference | 5/15/2017 | 5/15/2017 | 5/15/2017 | P | PASS |
Tony Young
|
|
|
Dwayne Phone #: ###-####,, walk through for final
|
BLD-Conference | 3/8/2017 | 3/8/2017 | 3/8/2017 | P | PASS |
Tony Young
|
|
|
stair ?s,, can replace the bad existing treads with new ones
|
BLD-Energy code compliance | 1/31/2017 | 2/1/2017 | 2/1/2017 | P | PASS |
Tony Young
|
|
|
dwayne Phone #: ###-####
|
BLD-Framing/Rough-in | 1/19/2017 | 1/20/2017 | 1/20/2017 | A | PASS |
Dave Hannah
|
|
|
dwayne Phone #: ###-####
|
BLD-Conference | 1/12/2017 | 1/13/2017 | 1/13/2017 | A | PASS |
Tony Young
|
|
|
dwayne Phone #: ###-####,, frame conf.
|
BLD-Foundation | 11/22/2016 | 11/23/2016 | 11/22/2016 | P | PASS |
Tony Young
|
|
|
Dwayne Phone #: ###-####
|
BLD-Footing | 11/22/2016 | 11/22/2016 | 11/22/2016 | P | PASS |
Tony Young
|
|
|
Dwayne Phone #: ###-####,, monolithic ok
|
BLD-Footing | 11/21/2016 | 11/22/2016 | 11/22/2016 | A | PEND |
Tony Young
|
|
|
Dwayne Phone #: ###-####,, need soils report
|
PubWorks Subgrade Approval | 11/22/2016 | 11/22/2016 | 11/22/2016 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | NR |
Tony Young
|
|
|
Dwayne Phone #: ###-####,, needs hillside 1st
|
Routing PW Grading-Hillside | 11/21/2016 | | 11/21/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Plan assigned to (LEG) Tisha | 11/2/2016 | | 11/10/2016 | | DONE |
Tisha Gallop
|
|
|
|
Routing - PLAN CHECK | 11/2/2016 | | 11/10/2016 | | PASS |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 11/10/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/10/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/10/2016 | | DONE |
|
|
|
plan mod ONLY
|
CHANGE STATUS TO (ISS) | | | 11/10/2016 | | DONE |
|
|
|
plan mod fees paid
|
(F) Reprint permit | | | 11/10/2016 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 11/2/2016 | | DONE |
|
|
|
Plan Mod Received 1 of each-insulation for attic, edngineering for add on-plans for add on and windows-took to Tisha
|
Routing Walk-In (BLD) | 10/13/2016 | 10/13/2016 | 10/14/2016 | P | FAIL |
Tisha Gallop
|
|
|
wants to include addition and window/patio door changes throughout house. Window U factors ok per N1102.36.1. Need to show all windows on plan and provide engineering for new foundation.
|
Routing Walk-In (Zoning) | 10/13/2016 | 10/13/2016 | 10/13/2016 | P | PASS |
Colleen T Carroll
|
|
|
|
Routing Walk-In (BLD) | 9/28/2016 | 9/28/2016 | 9/28/2016 | P | PASS |
Tisha Gallop
|
|
|
|
Plan assigned to (LEG) Tisha | 9/28/2016 | | 9/28/2016 | | DONE |
Tisha Gallop
|
|
|
|
Inspection Record Card- Bld | | | 9/28/2016 | | DONE |
|
|
|
|
1st review completed | | | 9/28/2016 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/28/2016 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/28/2016 | | DONE |
|
|
|
|
Application received | | 9/28/2016 | | | |
|
|
|
|