BLD-Aging Inspection | 7/12/2017 | 7/12/2017 | 7/12/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 7/11/2017 | 7/11/2017 | 7/12/2017 | | PEND |
Tony Young
|
|
|
|
BLD-Footing | 2/24/2017 | 2/27/2017 | 2/27/2017 | P | PART |
Tony Young
|
|
|
Ren Phone #: ###-####,, poured
|
PubWorks Subgrade Approval | 2/27/2017 | 2/27/2017 | 2/27/2017 | | DONE |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable has been received by Public Works. Footing inspection may be scheduled with the Building Department. Jason Taylor ###-####.
|
BLD-Footing | 2/23/2017 | 2/24/2017 | 2/24/2017 | P | PEND |
Tony Young
|
|
|
Ren Phone #: ###-####
|
BLD-Footing | 2/22/2017 | 2/23/2017 | 2/23/2017 | P | PEND |
Tony Young
|
|
|
Ren Phone #: ###-####,, ftg ok,, just needs soils approval per plan
|
BLD-Conference | 2/22/2017 | 2/22/2017 | 2/22/2017 | P | PASS |
Tony Young
|
|
|
Dave Phone #: ###-####,, status check,, footings have not been poured yet
|
BLD-Footing | 2/21/2017 | 2/22/2017 | 2/22/2017 | A | FAIL |
Tony Young
|
|
|
Dave Phone #: ###-####
|
BLD-Footing | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | FAIL |
Tony Young
|
|
|
Dave Phone #: ###-####,, needs hillside approval
|
BLD-Footing | 2/16/2017 | 2/17/2017 | 2/17/2017 | A | PEND |
Tony Young
|
|
|
Dave Phone #: ###-####,, still needs hillside soils approval
|
BLD-Footing | 2/15/2017 | 2/16/2017 | 2/17/2017 | P | PEND |
Tony Young
|
|
|
Dave Phone #: ###-####,, needs soils report
|
BLD-Footing | 2/14/2017 | 2/15/2017 | 2/16/2017 | P | PEND |
Tony Young
|
|
|
Dave Phone #: ###-####
|
BLD-Footing | 2/13/2017 | 2/14/2017 | 2/14/2017 | P | NR |
Tony Young
|
|
|
Dave Phone #: ###-####,, needs hill side soils report 1st
|
CHANGE STATUS TO (ISS) | | | 12/15/2016 | | DONE |
Christina Prado
|
|
|
|
OVERRIDE | | | 11/14/2016 | | |
|
|
|
|
OVERRIDE | | | 11/14/2016 | | |
|
|
|
|
Plan assigned to (DAF) | 11/12/2016 | 11/12/2016 | 11/14/2016 | | DONE |
David Ferguson
|
|
|
|
Permit Ready to Issue | | | 11/14/2016 | | DONE |
|
|
|
All met
|
Telephone call | | | 11/14/2016 | | DONE |
|
|
|
Spoke with Ren informing him permit is ready and fees due for issuance. He stated the owners are going to be the RP
|
Issue PAID IN FULL permit | | | 11/14/2016 | | DONE |
|
|
|
|
Routing PW Grading-Hillside | 11/12/2016 | | 11/14/2016 | | PASS |
Jason C. Taylor
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at ###-####
|
Case Summary (BLD) | | | 11/14/2016 | | DONE |
David Ferguson
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/14/2016 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/14/2016 | | DONE |
|
|
|
Need RP
|
Inspection Record Card- Bld | | | 11/12/2016 | | DONE |
David Ferguson
|
|
|
|
Routing - PLAN CHECK | 11/12/2016 | | 11/12/2016 | | PASS |
David Ferguson
|
|
|
|
Routing Walk-In (BLD) | 11/10/2016 | 11/10/2016 | 11/10/2016 | A | FAIL |
David Ferguson
|
|
|
Need visible engineers signature and date on stamped sheets. Also, ESC waiver letter. Jason T. has reviewed and will sign-off in Tidemark and Andy has met with the applicant and is waiting for the waiver letter to sign-off and stamp.
|
Routing Walk-In (BLD) | 11/10/2016 | 11/10/2016 | 11/10/2016 | A | FAIL |
David Ferguson
|
|
|
Need Jason T. to sign-off in Tidemark.
|
Routing - Erosion and Sediment | 11/10/2016 | | 11/10/2016 | | PASS |
Andy J. Long
|
|
|
ESC plan waiver. Homeowner RP or GC to get interim RP/sign up for class
|
Routing Walk-In (Zoning) | 9/29/2016 | 9/29/2016 | 9/29/2016 | A | PASS |
Brent Moore
|
|
|
|
Routing Walk-In (BLD) | 9/29/2016 | 9/29/2016 | 9/29/2016 | A | FAIL |
Brian McGowan
|
|
|
Addition is in the Hillside and needs foundation with calculations stamped and signed by an engineer.
|
1st review completed | | | 9/29/2016 | | DONE |
David Ferguson
|
|
|
|
Application received | | 9/29/2016 | | | |
|
|
|
|