BLD-Footing | 4/4/2017 | 4/4/2017 | 4/5/2017 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by rich prasch
|
Issue PAID IN FULL permit | | | 3/22/2017 | | DONE |
|
|
|
|
Expiration Notice | 3/20/2017 | 4/10/2017 | 3/20/2017 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (BJM) | 11/4/2016 | 11/4/2016 | 12/16/2016 | | DONE |
Brian McGowan
|
|
|
Fail - Need engineers calculations
|
Plan resubmittals received | | | 12/16/2016 | | DONE |
|
|
|
received one copy of structural calcs- gave to Brian
|
1st review completed | | | 12/16/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 12/16/2016 | | 12/16/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 12/16/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 12/16/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/16/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 12/16/2016 | | DONE |
|
|
|
DO NOT REISSUE PLAN MOD
|
Telephone call | | | 12/16/2016 | | DONE |
|
|
|
Spoke with Debbie informing her that this plan mod is ready to be picked up and the fee amount due. She stated she would inform Rich
|
1st review completed | | | 11/21/2016 | | FAIL |
Brian McGowan
|
|
|
Need engineers calculations
|
Routing - PLAN CHECK | 11/21/2016 | | 11/21/2016 | | FAIL |
Brian McGowan
|
|
|
Need engineers calculations
|
Plan Modification Accepted | | | 11/4/2016 | | DONE |
|
|
|
plan mod engineering for patio on opposite side of M H-took to Brian McGowan
|
BLD-Footing | 10/10/2016 | 10/11/2016 | 10/11/2016 | A | PASS |
Jim Sly
|
|
|
This footing inspection can be done in the late AM tomorrow. Aaron will be doing the installation and his cell number is ###-####. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
|
Routing Walk-In (BLD) | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | DONE |
Brian McGowan
|
|
|
|
1st review completed | | | 10/10/2016 | | DONE |
Brian McGowan
|
|
|
|
Routing - PLAN CHECK | 10/10/2016 | | 10/10/2016 | | PASS |
Brian McGowan
|
|
|
|
Case Summary (BLD) | | | 10/10/2016 | | DONE |
Brian McGowan
|
|
|
|
Inspection Record Card- Bld | | | 10/10/2016 | | DONE |
Brian McGowan
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2016 | | DONE |
Brian McGowan
|
|
|
|
Permit Ready to Issue | | | 10/10/2016 | | DONE |
|
|
|
all requirments met
|
Issue PAID IN FULL permit | | | 10/10/2016 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 9/29/2016 | 9/29/2016 | 9/29/2016 | A | DONE |
Jeff Lowe
|
|
|
|
Routing Walk-In (Zoning) | 9/29/2016 | 9/29/2016 | 9/29/2016 | A | DONE |
Susan Riggs
|
|
|
|
Routing Walk-In (BLD) | 9/29/2016 | 9/29/2016 | 9/29/2016 | A | FAIL |
Brian McGowan
|
|
|
One of the patios was modifying the provided engineeriong to build a truss. Is not part of the approved engineering
|
Application received | | 9/29/2016 | | | |
|
|
|
|